Machines we support
Heavy, moving, and demanding
Why it pays
Machines that stay aligned
Vibration considered
Stiffness checked for running loads.
Bolts in the right place
Holes drawn from machine data.
Building protected
Machines off light framing.
Faster setup
Foundations ready on time.
Specification
Machinery frames at a glance
- Frames
- Machinery frames, bases and raised machine platforms
- Design
- Designed to AISC 360 from the supplier's loads and vibration data
- Welding
- AWS D1.1
- Drawings
- Anchor and equipment bolt locations on the shop drawings
- Finish
- Primed and painted, or as specified
- Scope
- Steel only; machine setting and alignment by your millwright
How it works
Machine data in, accurate base out
- Machine dataLoads, vibration, bolt pattern.
- Frame designedStrength and stiffness.
- FabricatedDrilled to the machine pattern.
- Shipped markedFor your erector and millwright.
Where it goes
Plants with hard-working machines
- Manufacturing plantsProduction lines and presses.
- WorkshopsCompressors and machine tools.
- MiningCrushers, screens and conveyors.
Photo
PhotoQuestions
Machinery frame questions
What data do you need?
The machine's weight, operating forces, vibration data and bolt pattern from the equipment supplier.
Who aligns the machine?
Your millwright or the equipment supplier. Our frame gives them an accurate, stiff base to work from.
Do you design the foundation?
No. Your foundation engineer designs the concrete. We provide the frame reactions and anchor layout.
More crane and industrial supports: Crane Runway Beams · Crane Supporting Columns · Equipment Platforms · Maintenance Walkways · Loading Platforms · Industrial Access Systems · Overhead Cranes · Hoists
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Machinery Support Frames
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides