Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Built-up sections · Welded box columns

Box columns: four plates, one closed section, strength in every direction

When beams frame into a column from all four sides, or the column must resist bending both ways, an open H-section is strong on one axis and weak on the other. A welded box column is not. Four plates welded at the corners give equal stiffness in both directions, high torsional strength and clean faces for connections. We fabricate square and rectangular box columns to your Engineer of Record’s design in our plant in Vietnam.

Plan of a welded box column with corner welds and beams arriving from all four sides Closed cell Corner weld Beam

Drawing for illustration, not to scale. Plate sizes and weld types come from your design.

Open or closed

When a box column beats an H-column

Both are welded from plate in our plant. The choice comes down to how the column is loaded and how beams frame into it.

Welded H-section compared with a welded box section
PropertyWelded H-sectionWelded box section
Bending stiffnessHigh on the strong axis, low on the weak axisEqual on both axes for a square box
TorsionLow: open sections twist easilyHigh: the closed cell resists twisting
Beams from four sidesWeak-axis connections are awkward and weakerEvery face is a flange: same detail on all four sides
Concrete fillNot possibleCan be filled to act as a composite column
Surface to coatInside faces exposedOnly the outside is exposed; the inside is sealed

Make-up

What goes into a welded box column

Four plates

Two flange plates and two web plates, each cut on CNC machines to width and length, with bevels prepared for the corner welds.

Corner welds

Partial or complete joint penetration welds at the four corners, as your design specifies, run by submerged arc on our gantry welder.

Diaphragms

Plates inside the box at beam flange levels carry the beam forces across the column. Their welding order is planned before the box is closed.

Connections outside

Shear tabs, moment connection plates, splices and the base plate are welded or drilled on the outside faces.

Planned before the box is closed

Four things we settle on the approval drawings

  • Diaphragm order agreed early

    Inside plates are fitted and welded before the last plate closes the box. We show the sequence and the joint details on the approval drawings, so your Engineer of Record approves a column that can be built and inspected.

  • Inspection access

    Every weld that matters is planned so it can be inspected: visual on all welds, and UT on complete penetration welds where your specification calls for it.

  • Corner joints sized by design

    Corner welds are often partial penetration along the column and complete penetration near moment connections and splices. The design sets the extent.

  • Seismic frames

    In special moment frames AISC 341 applies to the column and its connections, and demand-critical welds follow AWS D1.8 with qualified welders.

Finished columns with base plates resting on shop rails
Tubular column with a square base plate and bolt holes, crew working behind it
Quality inspector taking dimensions on a finished steel member

Columns, base plates and inspection in the World Steel plant, Vietnam.

Concrete-filled columns

Box columns that become composite columns

Filled with concrete on site, a steel box carries more load in the same footprint. See how composite design fits the code basis on AISC 360.

Filled composite columns

A box filled with concrete acts as a composite column under AISC 360 Chapter I: the steel confines the concrete, and the concrete braces the plates against local buckling.

Holes planned in the shop

Vent holes, concrete pour openings and any shear studs inside the box are placed by design and made in the shop, not cut on site.

Concrete on site

Filling with concrete is site work by the US contractor, our customer, after erection.

Questions

Box column questions

Planning a two-way moment frame or a composite column? Send the column schedule and your frame design; our engineers come back with questions before they price.

When should a box column be used instead of an H-column?

When the column bends about both axes, takes beams from all four sides, must resist torsion, or will be filled with concrete. For a column loaded mainly about one axis, an H-section is usually simpler and lighter.

Do you weld the corners with full penetration?

Where your design calls for it. Corner welds are often partial penetration along most of the length and complete penetration around moment connections and splices. The extent comes from your Engineer of Record.

How are the internal diaphragms welded?

They are fitted and welded inside the box before the last plate closes it, in a sequence shown on the approval drawings. Joint details are agreed with your Engineer of Record so every weld can be made and inspected.

Can the box columns be filled with concrete?

Yes, as filled composite columns designed to AISC 360 Chapter I. We provide the vent and pour holes and any inside studs; the concrete is placed on site by the US contractor.

Can box columns be spliced for shipping?

Yes. Column splices are placed above floor level where design and erection suit, with bolted or field-welded details as your design specifies, and each tier is sized for its container or flat rack.

Built for large jobs

Box columns for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included