Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Mezzanines & floor systems · Industrial floor support

Frames that carry the plant, level by level

Mills, dryers, mixers and process lines often stack equipment two, three or four levels high so material can flow down by gravity. The steel underneath has to carry heavy, sometimes vibrating loads and leave room for chutes, pipes and access. We design these frames with your process engineer’s loads, fabricate them in our plant and ship them level by level.

2,500 t (2,756 short tons) of structural steel a month

IllustrationLevels and equipment vary by process.

Why it pays

Steel for heavy, moving loads

  • Heavy loads

    Framed under every machine.

  • Vibration considered

    Dynamic loads in the design.

  • Capacity to deliver

    2,500 t (2,756 short tons) a month.

  • Shipped by level

    Erection follows the levels.

How it is delivered

Process data to bolted levels

  1. Process dataEquipment, loads, openings.
  2. Frame designedLevel by level.
  3. FabricatedShop-welded, field-bolted.
  4. Shipped in sequenceLowest level first.

Specification

Process structures at a glance

MembersHeavy hot-rolled and built-up beams, columns and bracing
LoadsEquipment, live and dynamic loads from your process data
DesignDesigned to AISC 360 with loads from ASCE 7-22
OpeningsFramed for chutes, pipes and ducts
FloorsGrating, plate or deck, per level
ApprovalDrawings reviewed by the US contractor and their Engineer of Record
Crane setting a rafter on a warehouse framePhoto
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.
Coated frame parts with welded brackets in the paint hallPhoto
Frame parts with their brackets, coated and drying, World Steel, Vietnam.

Questions

Process structure questions

What do you need from us to design the frame?

The equipment list with weights, footprints and any dynamic loads, the levels, and the openings for chutes and pipes. Your process engineer usually has this.

Can you handle a large process structure?

Yes. Our plant fabricates 2,500 t (2,756 short tons) a month and has delivered jobs such as Sunpro Steel at 5,000 t and CPV Food at 2,500 t.

Do you consider vibration?

Dynamic loads from the equipment data are part of the design. Where vibration is critical, your Engineer of Record sets the criteria.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Industrial Floor Support Structures

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of mezzanines & floor systems, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.