Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Overhead crane: end trucks on runway rails, a double-girder bridge, a trolley and a hook

Crane runway & industrial supports · Overhead cranes

The crane and the building, designed as one

Buy the crane from one vendor and the building from another, and the runway gets stuck in the middle: wrong wheel loads, missing clearances, finger-pointing on site. We supply overhead and gantry cranes made by World Steel together with the runway and the frame, so span, wheel loads, hook height and clearances are set in one design from the start.

IllustrationCrane, runway and frame in one design.

Crane types

Pick the crane for the lift

Single girderLight to medium lifts, simple and economical.
Double girderHeavier lifts and higher hook heights.
Gantry craneRuns on rails at ground level, outdoors or in yards.

Why it pays

No gap between the crane and the building

  • One design

    No gap between crane and runway.

  • Clearances set early

    Hook height and span in the frame.

  • One supplier

    One point of contact for the steel.

  • Shipped together

    Crane, runway and building.

Types
Single girder, double girder and gantry cranes
Crane design
Designed to CMAA 70 or 74 for the service class you need
Runway
Designed to AISC 360 and AISC Design Guide 7, with the building
Data
Span, capacity, hook height and speeds set with you
Installation
Assembled, load tested and commissioned by a qualified crane installer
Compliance
As your jurisdiction and OSHA require

How it works

Lifting needs to a working crane

  1. Lifting needsCapacity, span, hook height, duty.
  2. Crane and runway designedTogether with the frame.
  3. FabricatedCrane and building steel.
  4. Shipped and installedBy qualified installers.
Crane setting a rafter on a warehouse framePhoto
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.
Tall lattice columns of a crane-served industrial building during erectionPhoto
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.

Questions

Overhead crane questions

Who installs and load tests the crane?

A qualified crane installer assembles, load tests and commissions the crane as your jurisdiction and OSHA require. Your erector installs the runway.

Can you match a crane we already chose?

Yes. Send us the crane data and we design the runway and frame around it.

What service class should we choose?

It depends on how often and how heavy you lift. We help you pick a CMAA 70 or 74 class that fits the work.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Overhead Cranes

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Long shop floor of built-up members, overhead cranes and a center walkway Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.