100 mm
about 4 in: the thickest steel our laser machines cut
1 file
cut lists and nesting come from the approved Tekla model
0
hand-copied dimensions between the drawing and the cutting bed
Methods
The right cut for every part
Laser comes first for plates, holes and accurate parts. Each other method is used where it suits the shape and thickness.
CNC laser cutting
Plate up to 100 mm (about 4 in): base plates, end plates, gussets, stiffeners, webs and flanges
Narrow kerf, square edges and accurate small features, with holes cut in the same pass
CNC multi-torch oxy-fuel
Web and flange strips for built-up members
Several torches cut a web and its flanges in one operation, so the parts of one member match
CNC plasma
Plate parts that do not need laser edge quality
Fast profile cutting where the drawing allows it
Shearing
Flange and web strips up to 12 mm (about 1/2 in)
Straight cuts on thinner plate without heat
Band saw
Rolled H and I shapes, channels, angles, round bar and pipe
Square cut ends on hot-rolled members, measured against the marked length
Why it matters on your site
What laser cutting to 100 mm changes for a US crew
Holes and slots cut in the same program as the outline stay true to each other, which is what makes field bolt-up go quickly.
Heavy base plates, cap plates and splice plates up to 100 mm (about 4 in) are cut on the same CNC path as the thin parts.
Square, low-dross edges mean less grinding before fit-up and better joint preparation for the weld.
The cut list, part marks and nesting all come from the model your Engineer of Record reviewed, never from a retyped list.
Shop rules
Four rules on every cutting bed
- Cut only from the approved drawing
No plate is cut until the shop drawings and cutting plan are approved; parts are cut to the latest revision only.
- Nest to cut scrap
Parts are laid out on the plate following the cutting plan, to use the plate well and keep the heat number on the off-cut.
- Mark every part
Each part gets its piece mark and ID code right after cutting; heat numbers are transferred where the contract asks for them.
- Square, clean cut faces
Cut faces are square to the axis unless the drawing says otherwise, and notches or slag are repaired and ground smooth.
Cutting data comes from the model that goes through our design process; see built-up steel sections for what the parts become.



Questions
Laser and CNC cutting questions
How thick can World Steel laser cut?
Our laser machines cut steel up to 100 mm (about 4 in) thick. The same machines are used both to cut parts to shape and to make bolt holes.
Is every part laser cut?
No. Each part goes to the method that suits it: laser for plates and parts that need accurate edges and holes, multi-torch oxy-fuel for web and flange strips of built-up members, plasma and shearing for simpler plate parts, and band saws for rolled shapes.
Where do the cutting dimensions come from?
From the approved Tekla model. Cut lists, part marks and nesting are generated from it and sent to the machines, so dimensions are never copied by hand.
Do cut parts keep their traceability?
Yes. Each part is marked with its piece mark and ID code right after cutting, and heat numbers are carried over where the contract requires it.
Can you cut parts for steel you design yourself?
Yes. If your team supplies stamped drawings or a model, we fabricate to them as drawn, through the same cutting and inspection steps.
Built for large jobs
Put your next steel package through this station
CNC cutting is one of eight stations in a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019 and audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a steel list. Our engineers take off the quantities, check the US code basis and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and OEM supply under your brand.
Watch this station work on your own job. Hold and witness points can be attended live on Zoom or Microsoft Teams, and every record is in PEB Studio.
Book an online audit