Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Connections & anchorage · Structural bolts

Every field joint, counted and bagged

A steel building goes together with thousands of bolts, and each joint needs the right grade, length and number. We count every bolt from the connection design, bag them by connection type and mark the bags to the erection drawings, so the crew on site picks the right assembly without guessing. ASTM F3125 supply for US jobs is confirmed in each proposal, with certificates.

Exploded structural bolt assembly: bolt head, two steel plates, hardened washer and heavy hex nut BoltPlatesWasherNut
IllustrationInstalled by your contractor to the RCSC Specification.

The assembly

Four parts, matched

  • BoltHigh-strength, grade per the connection design
  • NutHeavy hex, matched to the bolt grade
  • WasherHardened, where the joint calls for it
  • FinishPlain or zinc-coated, matched to the steel it joins

Why it pays

No hunting for bolts on site

  • Counted from the designNot estimated by weight.
  • Bagged by connectionMatched to the erection drawings.
  • CertificatesMill and test certificates per proposal.
  • Spares includedFor bolts lost on site.

How it is supplied

Counted, confirmed, bagged

  1. Bolt listFrom every connection.
  2. Supply confirmedGrade and certificates.
  3. Bagged and markedShipped with the steel.
Painted members strapped into bundles and stacked for the voyagePhoto
Bundles made up for an export shipment at the Vietnam plant.
Fitter comparing a built-up beam with its shop drawingPhoto
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.

Specification

Structural bolts at a glance

AssembliesBolts, nuts and washers, by connection type
GradesASTM F3125 for US jobs, confirmed in each proposal with certificates
DesignConnections designed to AISC 360 Chapter J
InstallationSnug-tight or pretensioned per the RCSC Specification, by your contractor
PackingBagged and labeled by connection type and drawing
SparesExtra assemblies included for site losses

Where it goes

Every bolted joint

Questions

Bolt questions

Do your bolts meet ASTM F3125?

For US jobs, ASTM F3125 bolt supply is confirmed in each proposal, with mill and test certificates. We do not assume it without confirming it.

Snug-tight or pretensioned?

The connection design says which joints need pretensioning. Your contractor installs and inspects them to the RCSC Specification.

How are bolts packed?

Bagged by connection type, labeled with the drawing and joint, with spares for site losses.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Structural Bolts

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of connections & anchorage, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.