Mill buildings are long, often hundreds of meters, and many of them hold furnaces and hot metal. That makes thermal movement a design issue, and it makes the path for crane braking and bumper forces a long one. AIST Technical Report No. 13 (2021), Sections 5.2, 5.5 and 5.6 with their commentary, covers how to handle both.
How a mill building resists lateral loads
TR-13 describes the usual system: rigid frames or cantilevered columns across the building and vertical braced frames along it, with roof and floor diaphragms or horizontal bracing spreading loads to them. Frames are laid out on a regular module chosen from the process layout and cost.
Roof bracing between frames: an option, not a rule
Earlier editions read as if every mill building had to be tied into a space frame with horizontal bracing. The 2021 commentary is clearer: horizontal bracing in the roof plane or at the bottom chord of the trusses can share crane and wind loads across several frames, which may mean lighter columns and smaller foundations. But it adds bracing steel and fabrication and erection time. The owner and engineer weigh the two.
If load sharing is relied on, TR-13 asks for:
- a continuous bracing system between expansion joints, and from joints to the building ends;
- forces taken from a 3D model that reflects the relative stiffness of the bracing and frames;
- bottom-chord bracing where trusses are used, as it is simpler to detail;
- special analysis wherever the bracing is interrupted, for example at a crane repair bay.
Stability bracing for columns, girders and chords meets AISC 360 Appendix 6.
Longitudinal bracing placement
Longitudinal vertical bracing carries wind, seismic, crane traction and bumper forces to the foundations. TR-13 recommends placing it about midway between expansion joints, or near the middle of a building without them, with braced sections no more than about 61 m (200 ft) apart.
The commentary explains the logic: a braced bay at the center gives the building one fixed point, so it can expand both ways without locked-in thermal stress. It gives an example: a 122 m (400 ft) structure braced at its center grows about 19 mm (¾ in) at each end for a temperature change of about 28 °C (50 °F). Bracing on the two sides of a crane aisle should have similar stiffness, to avoid pushing the crane into a skew.
Where bracing cannot reach the column bases, longitudinal frame action or fixed bases must carry the forces down. Drift for this system follows the same limits as the transverse frames (see crane girder deflection and drift limits).
The crane force path
TR-13 asks the designer to trace each longitudinal load from where it enters to the ground. Traction and end-stop forces typically pass from girder to girder through cap or rocker plates until they reach a braced bay, then into the brace and foundation. Struts can carry forces from an unbraced line to a braced one. The girder connections must be designed for the forces this path puts through them. Bumper forces are explained in crane runway end stops.
Expansion joint spacing
For transverse expansion joints through the structure, roof and cladding, TR-13 suggests:
| Area | Maximum joint spacing |
|---|---|
| Furnace and hot-metal buildings | about 122 m (400 ft) |
| Other mill areas | about 152 m (500 ft) |
Longitudinal joints should be considered in wide multi-aisle buildings and are called for where the building is wider than about 152 m (500 ft) or has more than five aisles. Long crane buildings that meet at right angles should not be rigidly joined unless movement of one is allowed for without misaligning the other's runway. The design temperature change should be agreed with the owner, equipment vendors and ventilation engineer, with care for steel set in cold weather.
How we detail it
World Steel shows braced bays, expansion joints, slotted connections and the crane force path on the design and shop drawings, and fabricates the bracing, struts and crane supporting columns to suit. The long bays of the Sunpro Steel mill, with cranes up to 150 t, follow these principles. See our crane design standards page.
Solutions and the Sunpro Steel project
See how this fits a complete job: the crane building system for runways, columns and cranes, manufacturing plants with crane bays for factory layouts, and heavy industrial plants for mills and process plants. All of it was put to work on the Sunpro Steel mill project, a 5,000 t steel production plant designed for overhead cranes up to 150 t.
Source and limits
This article paraphrases AIST Technical Report No. 13 (2021), Sections 5.2, 5.5 and 5.6 and the commentary. Joint spacing and bracing for each job are set by the design and approved by the Engineer of Record.
Quick answers
How far apart should expansion joints be in a mill building?
AIST TR-13 suggests transverse joints no more than about 122 m (400 ft) apart in furnace and hot-metal buildings and 152 m (500 ft) elsewhere, and longitudinal joints in buildings wider than 152 m or with more than five aisles.
Where should longitudinal bracing be placed?
About midway between expansion joints, or near the middle of a building without joints, with braced bays no more than about 61 m (200 ft) apart, so the building expands both ways from a fixed point.
Is roof bracing between frames required?
No. It is an option that shares crane and wind loads between frames and can lighten columns and foundations, at the cost of more bracing steel and time. The owner and engineer choose.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors
- Solutions by stateState-by-state steel solutions