Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Primary structural system · Steel trusses

Long spans built from triangles, assembled in our shop

A truss turns a long span into a web of short members working in tension and compression. We build roof and floor trusses from angles, channels or tubes, check every node against the shop drawing and split them into panels that ship in containers and bolt together on site.

Truss types

The right web for the span and the load

  • PrattVerticals in compression, diagonals in tension
  • WarrenAlternating diagonals, no verticals
  • Space trussThree-dimensional grid for very wide roofs
  • CurvedBowstring and arched chords

Why trusses

Depth without the weight

  • Longer spans, lighter steel

    Depth makes a truss stiff without the weight of a solid beam.

  • Room for services

    Ducts, pipes and cable trays pass through the open web.

  • Shipped in panels

    Bolted splices let long trusses travel in standard containers.

  • Checked node by node

    Every joint inspected against the shop drawing before coating.

On the shop floor

Laid out full size, welded node by node

  1. Truss geometry and loadsConfiguration and member sizes from your design loads.
  2. Members cut and preparedChords and webs cut and beveled.
  3. Assembled on the floorTrusses laid out full size and welded at the nodes.
  4. Split and packedPanels marked and packed by erection sequence.

Specification

Truss data

Members
Angles, channels, tubes or wide-flange chords, to your design
Nodes
Gusset plates or direct welded tube connections to AWS D1.1
Panels
Split at bolted splices sized for container shipping
Design
AISC 360 member and connection design, ASCE 7-22 loads
Camber
Built into the shop assembly where the design calls for it
Finish
Primed, painted or galvanized
Crew assembling a large steel truss on the shop floorPhoto
Space-truss roof being erected over a large food processing hallPhoto
Looking up at curved steel roof trusses spanning a wide hallPhoto

Questions

Steel trusses, answered

When is a truss better than a solid beam or tapered rafter?

When the span is long, the roof load is heavy or services need to pass through the structure. A truss gets its stiffness from depth, so it stays light over long spans.

How do long trusses ship from Vietnam?

They are split into panels at bolted splices sized for standard containers, then bolted back together on site.

Have you built large truss roofs?

Yes. The long-span roof trusses of the CPV Food processing factory were part of a 2,500 t package World Steel delivered.

Can trusses carry hanging equipment?

Yes, when the loads are given at design stage. Hung equipment, ducts and sprinklers are added to the truss design loads.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Steel Trusses

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Crew assembling a large steel truss on the shop floor Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.