World Steel USA team
LIAM Ngo
Sales Manager
Sales Manager at World Steel USA, the US desk of World Steel Group: your contact for structural steel designed and fabricated in our own plant in Vietnam and shipped to US projects.
Namecard
Reach Liam directly
Scan a code with your phone camera: one adds Liam to your contacts, the others open WhatsApp or LinkedIn to connect. Or save the contact card (.vcf). For drawings and larger files, the form below keeps them in private storage.
Working with Liam
How a US project runs
Liam Ngo is a Sales Manager at World Steel USA, the US desk of World Steel Group. Here is how Liam and the team take a US project from your first drawing to the container at your port.
Review your drawings and scope
Send architectural drawings, a bid package or a footprint and site address. Liam checks what World Steel would design, fabricate and ship, and comes back with open questions.
Design to the codes your permit uses
Our engineering office designs to IBC, ASCE 7 and AISC 360 and prepares calculations and shop drawings for your Engineer of Record to review and approve.
A production slot in our own plant
Every member is fabricated in World Steel’s IAS AC472-accredited plant in Tay Ninh Province, Vietnam, and you can follow it in PEB Studio in real time.
Shipped to the US port nearest your job
Steel is bundled to your erection sequence and shipped to the US port you choose. Erection and site work are by the US contractor, our customer.
Behind Liam
The plant that fabricates your steel
Liam sells what World Steel makes itself: structural steel for large US projects, designed in our engineering office and fabricated in our own plant in Vietnam.
of structural steel a month from our own plant (2,750 short tons)
accredited since 2019, the first and only steel building fabricator in Vietnam, audited twice a year
plant in Tay Ninh Province (215,000 sq ft), cutting by laser up to 100 mm (4 in) thick
real-time tracking of your members through cutting, welding, coating and QC release
Send a message
Write to Liam
Tell Liam about your project: building use, rough size in meters or feet, the state or site address and your timing. You get a reference number by email straight away.
World Steel USA




