Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

World Steel USA team

VICTOR Dang

Global Sales Director

Global Sales Director at World Steel USA, the US desk of World Steel Group: your contact for structural steel designed and fabricated in our own plant in Vietnam and shipped to US projects.

TitleGlobal Sales Director
Victor Dang, Global Sales Director, World Steel USA
Scan to add Victor to your phone contacts

Namecard

Reach Victor directly

Scan a code with your phone camera: one adds Victor to your contacts, the others open WhatsApp or LinkedIn to connect. Or save the contact card (.vcf). For drawings and larger files, the form below keeps them in private storage.

Save contact card (.vcf)

Working with Victor

How a US project runs

Victor Dang is a Global Sales Director at World Steel USA, the US desk of World Steel Group. Here is how Victor and the team take a US project from your first drawing to the container at your port.

Review your drawings and scope

Send architectural drawings, a bid package or a footprint and site address. Victor checks what World Steel would design, fabricate and ship, and comes back with open questions.

Design to the codes your permit uses

Our engineering office designs to IBC, ASCE 7 and AISC 360 and prepares calculations and shop drawings for your Engineer of Record to review and approve.

A production slot in our own plant

Every member is fabricated in World Steel’s IAS AC472-accredited plant in Tay Ninh Province, Vietnam, and you can follow it in PEB Studio in real time.

Shipped to the US port nearest your job

Steel is bundled to your erection sequence and shipped to the US port you choose. Erection and site work are by the US contractor, our customer.

Behind Victor

The plant that fabricates your steel

Victor sells what World Steel makes itself: structural steel for large US projects, designed in our engineering office and fabricated in our own plant in Vietnam.

Inside the factory
2,500 t

of structural steel a month from our own plant (2,750 short tons)

IAS AC472

accredited since 2019, the first and only steel building fabricator in Vietnam, audited twice a year

20,000 m²

plant in Tay Ninh Province (215,000 sq ft), cutting by laser up to 100 mm (4 in) thick

PEB Studio

real-time tracking of your members through cutting, welding, coating and QC release

Send a message

Write to Victor

Tell Victor about your project: building use, rough size in meters or feet, the state or site address and your timing. You get a reference number by email straight away.