Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Heavy welded steel girders for a seismic moment frame in the World Steel plant

Engineering and codes

AISC 358 prequalified connections: what the standard covers and how US projects use it

AISC 358 is the short list of beam-to-column moment connections that a US special or intermediate moment frame can use without new cyclic tests. Here is what the 2022 edition covers, how it fits beside AISC 341, and how the work splits between the Engineer of Record, the US contractor and the fabricator.

· 6 min read · World Steel USA engineering team

A special moment frame resists an earthquake by letting its beams bend far past yield, again and again, without the joint at the column breaking. That only works if the beam-to-column connection has been proven to survive the rotation. Proving it by full-scale cyclic test on every project would be slow and costly, so the US industry keeps a short list of connections that have already been proven. That list is AISC 358, formally ANSI/AISC 358-22, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications. This article opens the series: what the standard covers, how it sits beside AISC 341, and what it means for a US project that buys its steel from an overseas fabricator.

What "prequalified" means

AISC 341, the Seismic Provisions, asks every beam-to-column connection in a special moment frame (SMF) or intermediate moment frame (IMF) to reach a target story drift angle while keeping most of the beam's strength. It gives two ways to show that. The first is cyclic qualification testing of specimens that match the project's members, covered in the cyclic testing article of our AISC 341 series. The second is to use a connection that a review panel has already prequalified on the strength of a body of test data, analysis and performance experience.

Section 1.1 of AISC 358 sets its scope in one sentence: it specifies design, detailing, fabrication and quality criteria for connections prequalified under the Seismic Provisions for SMF and IMF. The key word is only. A connection is prequalified only when it is designed and built to every requirement in its chapter. Step outside a limit on beam depth, flange thickness or span, and it is no longer prequalified; it then needs its own test evidence accepted by the authority having jurisdiction.

The same section also says what the standard does not do. Nothing in it stops an engineer from using a listed connection outside its limits, or a connection that is not listed at all, when qualification evidence is presented to the building official. AISC 358 is the fast road, not the only road.

How AISC 358 fits in the code stack

A US steel building in a high seismic area is designed to a stack of documents. The International Building Code adopts ASCE 7 for loads; ASCE 7 sends steel systems to AISC 360 and, in higher Seismic Design Categories, to AISC 341. AISC 341 then points to AISC 358 for the connections of moment frames. Section 1.2 of AISC 358-22 lists its own references: AISC 341-22, AISC 360-22, AWS D1.1 and D1.8, the RCSC Specification for high-strength bolts, and the ASTM material and testing standards.

Section 1.3 adds two rules that matter on every job. All design, materials and workmanship must meet AISC 341 as well as AISC 358, so the seismic provisions on protected zones, demand-critical welds and quality assurance still apply. And the connections are designed by LRFD, although they may be used in a structure otherwise designed by ASD.

The division of labor between the two standards is clean. AISC 341 decides when a moment frame needs a prequalified connection and what the frame itself must do; AISC 358 says how each connection is proportioned, detailed and fabricated. Our AISC 341-22 series covers the first half. This series covers the second.

The twelve connections in Table 2.1

Section 2.1 and Table 2.1 list the prequalified types and the systems each may be used in:

Connection Chapter Systems
Reduced beam section (RBS) 5 SMF, IMF
Bolted unstiffened extended end plate (BUEEP) 6 SMF, IMF
Bolted stiffened extended end plate (BSEEP) 6 SMF, IMF
Bolted flange plate (BFP) 7 SMF, IMF
Welded unreinforced flange-welded web (WUF-W) 8 SMF, IMF
Cast bolted bracket (CBB) 9 SMF, IMF
ConXtech ConXL 10 SMF, IMF
SidePlate 11 SMF, IMF
Simpson Strong-Tie Strong Frame 12 SMF, IMF
Double-tee 13 SMF, IMF
Slotted web (SW) 14 SMF
DuraFuse Frames 15 SMF, IMF

Every type works for both systems except the slotted web, which is prequalified for SMF only. Several chapters cover patented products; a user note in Section 1.1 states that these are optional and that non-proprietary options are always available. The proprietary connections article explains how those chapters work on a real job.

Section 2.2 treats every connection as fully restrained for seismic analysis, with one exception: the Strong Frame connection is partially restrained, and its force-deformation behavior must be modeled.

What a chapter contains

Each connection chapter follows the same pattern, which makes the standard easier to use once you know it:

  • General and systems: how the connection yields and where the plastic hinge forms.
  • Prequalification limits: beam depth, weight, flange thickness, clear span-to-depth ratio, column type and depth, lateral bracing and the protected zone.
  • Detailing limits: welds, bolts, plates, holes, shims and stiffeners.
  • Design procedure: a numbered sequence of steps from the probable maximum moment to the column checks.

Chapters 2, 3 and 4 hold the rules the connection chapters share: member types, design parameters, welding and bolting. Appendices A and B cover castings and forgings for the connections that use them.

Who does what on a US project

The standard is written for designers, but three parties use it.

The Engineer of Record chooses the seismic force-resisting system, selects a prequalified connection that fits the member sizes and spans, and confirms the frame's drift, strong-column weak-beam ratio and panel zones. The selection belongs in the design documents, along with the protected zones and demand-critical welds that AISC 341 asks to be shown.

The steel fabricator carries the connection into calculations where delegated, and into shop drawings, then builds it. On a World Steel job our engineers check each connection against its chapter, show the limits and protected zones on the Tekla shop drawings (included at no extra cost), and fabricate in our Vietnam plant, the first and only fabricator in Vietnam accredited under IAS AC472. Our welding procedures and welders are qualified to AWS D1.8, which Chapter 3 calls on for demand-critical welds.

The US contractor, our customer, reviews and approves the drawings, coordinates the Engineer of Record and the inspectors, and erects the frame; any seal comes from the US engineer. Site work is the US contractor's scope.

Where AISC 358 shows up in the US market

AISC 341 applies in Seismic Design Category D, E and F, and in lower categories when the design uses a response modification coefficient above 3. That makes special and intermediate moment frames routine in California, Washington, Oregon, Alaska, Nevada and Utah, and common on soft-soil sites in the New Madrid zone around Memphis and St. Louis. The seismic regions guide maps where the categories climb. The last three articles of this series take the regional view.

Moment frames appear wherever the plan needs open bays: multi-storey offices, hospitals, schools, parking structures, data halls and the lateral system of multi-storey steel framing. Most light single-storey metal buildings in high categories use ordinary moment frames or bracing instead, because tapered rafters rarely fit within the prequalification limits.

What prequalification does not cover

Prequalification answers one question: will this beam-to-column joint survive the required drift? It does not size the frame, check drift, pick the column or design the foundation. Those stay with the Engineer of Record under ASCE 7, AISC 360 and AISC 341. Nor does it cover ordinary moment frames, braced frames or the gravity connections around the frame, which follow their own rules. Keeping that boundary in mind avoids a common mistake: treating a prequalified connection as a guarantee for the whole lateral system.

Proof from our plant and projects

A standard is only as useful as the shop that builds to it. Our plant in Vietnam has been accredited under IAS AC472 since 2019 and is audited twice a year by IAS experts, the first and only fabricator in Vietnam to hold it. That accreditation covers the written procedures, inspection and records that a building official looks for when an AISC 358 frame is fabricated away from the jobsite.

The capability is proven at scale. We fabricate 2,500 t of structural steel per month, and our flagship jobs include the 5,000 t Sunpro Steel mill and the 2,000 t Long Son petrochemical complex. In a US territory with high seismic design values we supplied the multi-storey FPI Barracks in Guam, and our published Design Report shows how we document a US-code steel design, with seismic loads, for an Engineer of Record to review.

How to use this series

The articles follow the standard's own order. The first four explain the shared design rules of Chapter 2. The next four cover welding, bolting, holes and the inspection record. Then each connection family gets its own article, with separate shop articles for the RBS and the end plate, because those two decide most fabrication schedules. The series closes with selection guidance and the West Coast, Intermountain and New Madrid markets.

Read AISC 358 beside the AISC 341 and AISC 358 page and the AISC 341 landing. If you are pricing a seismic moment frame package, send the drawings: we return a design basis, connection list and fabrication plan, at a fabrication capacity of 2,500 t per month.

Quick answers

What is AISC 358?

ANSI/AISC 358-22 is the AISC standard that lists beam-to-column moment connections prequalified for special and intermediate steel moment frames, with the limits, detailing, fabrication and design steps each one must follow to count as prequalified.

Is AISC 358 required by the building code?

AISC 341 requires every SMF and IMF connection to be prequalified or qualified by cyclic test. AISC 358 is the prequalification route most US projects use, so in practice it governs most special and intermediate moment frames.

How many connections does AISC 358-22 list?

Table 2.1 lists twelve connection types in Chapters 5 to 15: RBS, BUEEP, BSEEP, BFP, WUF-W, CBB, ConXL, SidePlate, Strong Frame, double-tee, slotted web and DuraFuse Frames.

Who picks the connection on a World Steel job?

The Engineer of Record selects the connection in the design. Our engineers carry it through calculations and Tekla shop drawings for the US contractor, our customer, to review and approve, and our Vietnam plant fabricates it.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.