Welder looking over the stiffeners and end plate of a heavy column

Column stiffeners and end plate under inspection at World Steel, Vietnam.

Non-destructive testing

Six NDT methods, planned weld by weld for large US steel packages

Visual, magnetic particle, penetrant, ultrasonic, phased array and radiographic testing, each used where the code and your specification call for it, and paced to a plant that fabricates 2,500 metric tons of structural steel a month.

Non-destructive testing

Six ways to look at a weld, chosen by what the weld has to do

No single test sees everything. Visual testing reads the surface of every weld. Magnetic particle and penetrant testing find cracks too fine for the eye. Ultrasonic testing, conventional or phased array, and radiography look inside the weld. Your specification and the codes behind it decide which welds get which test; we plan, perform and record them as part of the production schedule.

Every weld is visually inspected. Every other test is performed to the extent your specification and the governing code set, by us, by the agency you name, or by our radiography partner.

Last reviewed . A guide for US contractors, engineers and inspectors, written by a fabricator. The code editions named in your contract govern.

Who tests what

Three lanes: our QC, your third party, our radiography partner

Every NDT line in your Inspection and Test Plan sits in one of these lanes. Radiography goes through our partner; every other method is performed in-house or by the third party you designate.

In-house, by World Steel QC

Our quality control team at the plant in Vietnam

VTMTPTUTPAUT

Visual inspection of every weld, plus the MT, PT, UT and PAUT your specification assigns to the fabricator, to written procedures and with calibrated equipment.

Recorded by piece mark in PEB Studio

By the third party you designate

Your QA agency, special inspector or testing firm

VTMTPTUTPAUT

Any of these methods, or all of them, can be performed by the agency you appoint instead of, or on top of, our QC: at hold points in our plant, live by video, or on arrival.

Hold points and access agreed in the ITP

Through a World Steel partner

A specialist radiography partner of World Steel

RT

Radiographic testing is carried out by our partner, under its radiation licence and safety rules, inside a scheduled exclusion window in the production plan.

Films or digital images go into your data book

Under AISC 360 Chapter N, the code-minimum ultrasonic testing is a quality assurance task for the agency working for the owner. It can test in our plant at the same hold points as our QC: see inspector access.

Six methods

One in-depth page for every NDT method

Each page explains how the method works, what it finds and misses, the code rules behind it, and how it runs on your job.

Method selector

Which test suits which joint

A general guide to how the methods are used on structural steel. Your specification and the code that governs each weld decide the actual test.

Joint or featureVTMTPTUTPAUTRT
CJP groove weld, butt joint (plate and flange splices) Primary methodUsed when the specification or the joint calls for itUsed when the specification or the joint calls for itPrimary methodPrimary methodPrimary method
CJP groove weld, T- or corner joint (beam flange to column) Primary methodUsed when the specification or the joint calls for itUsed when the specification or the joint calls for itPrimary methodPrimary methodNot suited
PJP groove weld Primary methodPrimary methodUsed when the specification or the joint calls for itUsed when the specification or the joint calls for itUsed when the specification or the joint calls for itNot suited
Fillet weld (stiffeners, clips, flange-to-web) Primary methodPrimary methodPrimary methodNot suitedNot suitedNot suited
Thermally cut copes and weld access holes Primary methodPrimary methodPrimary methodNot suitedNot suitedNot suited
Thick plate before and after welding (laminations, lamellar tearing) Not suitedNot suitedNot suitedPrimary methodUsed when the specification or the joint calls for itNot suited
Back-gouged roots and weld repairs Primary methodPrimary methodPrimary methodPrimary methodUsed when the specification or the joint calls for itUsed when the specification or the joint calls for it
Stainless steel or other nonmagnetic parts Primary methodNot suitedPrimary methodUsed when the specification or the joint calls for itUsed when the specification or the joint calls for itUsed when the specification or the joint calls for it
Primary methodUsed when the specification or the joint calls for itNot suited

Where testing is required from

Six sources of NDT requirements on a US steel job

Paraphrased and edition-neutral. Which apply depends on your building, its seismic system, its cranes and what your Engineer of Record writes into the specification.

AISC 360

Chapter N: quality assurance testing

  • UT of CJP groove welds in butt, T- and corner joints under transversely applied tension, in material 8 mm (5/16 in) and thicker.
  • Risk Category III or IV: all such welds. Risk Category II: 10% of them, with the rate adjusted on the results.
  • MT or PT of thermally cut access holes where rolled-shape flanges, or built-up webs, are over 50 mm (2 in) thick.
  • Assigned to quality assurance, the agency working for the owner, not to the fabricator.

AISC 341

Chapter J: seismic force-resisting systems

  • UT of CJP groove welds 8 mm (5/16 in) and thicker in the seismic system.
  • MT of the column k-area next to welded continuity plates, doublers and stiffeners.
  • UT of thick base metal loaded through its thickness, for lamellar tearing.
  • MT or PT of thermally cut copes and access holes in heavy flanges.

AWS D1.8

Seismic welding supplement

  • UT of demand-critical welds to a procedure qualified on weld mockups.
  • UT technicians who also pass the practical Annex F flaw-detection exam.
  • MT by the yoke method with dry visible particles to Annex G.
  • Left-in-place backing and PJP roots judged with their own rules, not rejected on geometry.

AIST TR-13

Crane runway girders in mill buildings

  • Flange and web splice welds: 100% RT or UT.
  • CJP flange-to-web welds: 100% UT.
  • Fillet flange-to-web welds: 100% MT or PT.
  • Acceptance for cyclic loading, because crane girders see millions of wheel passes.

AWS D1.5

Bridges, where your specification invokes it

  • Groove welds in butt joints under tension or stress reversal: 100% RT or UT.
  • Groove welds in butt joints under compression or shear: 25%.
  • Acceptance criteria written for fatigue-loaded bridge members.
  • Common on pedestrian bridges designed to the AASHTO guide specification.

Your specification

What the Engineer of Record adds

  • Testing assigned to the fabricator’s QC, by method and percentage.
  • Acceptance criteria where they differ from the code default.
  • Welds marked on the drawings for testing, often all CJP welds of a frame line.
  • Third-party witnessing and the hold points it needs.

From specification to data book

How NDT runs on a World Steel job

Specification read at the quote

We list every NDT requirement in your specification and drawings, method by method, so the quote covers all of it.

Written into the ITP

Each test becomes a line in the Inspection and Test Plan: method, extent, acceptance criteria, who performs it and any hold point.

Scheduled with production

Testing is planned member by member, so welds are tested while they are still easy to reach and repair on the shop floor.

Performed and witnessed

Our QC, your designated third party or our RT partner performs each test; your inspector can witness in person or live by video.

Repaired and re-tested

A rejected weld is marked, repaired to a qualified procedure and tested again by the same method.

Filed by piece mark

Every report, with the procedure, calibration and technician qualification, is filed against the weld and the piece mark in PEB Studio.

For the submittal reviewer

Six things every NDT report carries

Whoever performs the test, the report that reaches your data book answers the same six questions, filed by weld and piece mark in PEB Studio.

Inspector walking a line of painted built-up members on the shop floor Photo
Final look at coated members before they are released to packing, World Steel plant in Vietnam.

Weld and piece mark

Which weld on which member, matching the shop drawing and the weld map.

Method and written procedure

The procedure the test followed, with its revision, and the acceptance criteria applied.

Equipment and calibration

Instrument, probe or yoke, the calibration block or check used, and the date.

Technician qualification

AWS D1.1 requires NDT personnel other than VT to be qualified to ASNT SNT-TC-1A, ANSI/ASNT CP-189 or ISO 9712.

Result per indication

Accept or reject, with the indication, its location and size where the method gives them.

Repair and re-test

For a rejected weld, the repair record and the re-test result, linked to the original report.

2,500 t

of structural steel fabricated a month in one plant, with packages up to 5,000 t delivered: Sunpro Steel, CPV Food at 2,500 t, Long Son at 2,000 t.

NDT on large jobs

Thousands of welds, one test plan

On a large US package, testing either keeps pace with the shop or holds it up. We plan it as part of the production schedule.

Testing paced to 2,500 t a month

On a large package, NDT is booked into the production plan line by line, so testing runs with the welding instead of holding up packing.

One weld map for the whole job

Welds that need testing are mapped once from your drawings and carried into every shop drawing release, so none is missed across thousands of members.

Room for your agency

Your third party can test in our plant at agreed hold points, with members turned and presented in the order they want them.

Long shop floor of built-up members, overhead cranes and a center walkway Photo
One of the World Steel fabrication halls in Vietnam where US orders are built.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Rows of labeled steel bundles ready to leave the plant Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Questions from US reviewers

NDT questions we hear most

Which NDT methods does World Steel perform in-house?

Visual testing of every weld, and magnetic particle, penetrant, ultrasonic and phased array ultrasonic testing to the extent your specification assigns to the fabricator. Any of these can instead be performed by the third party you designate.

Who performs radiographic testing?

A World Steel partner that specializes in industrial radiography. It works under its own radiation licence and safety rules, in an exclusion window we schedule in the production plan, and its films or digital images go into your data book.

Can our own testing agency do the NDT?

Yes. The agency you designate can perform any method, at hold points in our plant in Vietnam, live by video alongside our QC, or on arrival at site. The ITP records who tests what.

What percentage of our welds will be tested?

The percentage your specification and the governing code require. AISC 360, AISC 341, AWS D1.8, AIST TR-13 and AWS D1.5 each set their own extents for the welds they cover. We do not substitute a fixed percentage of our own.

Does code-required UT count as our QC or as QA?

Under AISC 360 Chapter N, the minimum ultrasonic testing of CJP groove welds is a quality assurance task for the owner’s agency. Testing your specification assigns to the fabricator is done under our QC. Both can be planned at the same hold points.

Which acceptance criteria apply?

AWS D1.1 for the loading the weld is designed for, statically or cyclically loaded, unless your specification sets other criteria. Seismic welds add the AWS D1.8 rules and bridge welds follow AWS D1.5 where it is invoked.

How are technicians qualified?

AWS D1.1 requires personnel performing NDT other than visual testing to be qualified to ASNT SNT-TC-1A, ANSI/ASNT CP-189 or ISO 9712. The qualification record of whoever tests your welds is attached to the report.

What happens when a weld fails a test?

It is marked, logged with a photo, repaired to a qualified procedure and tested again by the same method. Repairs that would change the design go to your Engineer of Record first, and the full history stays in your records.

Send the weld schedule and the NDT your engineer wants

We split every test into our QC, your third party and our radiography partner in the ITP, plan it with production, and file every result by piece mark, from a plant that fabricates 2,500 metric tons a month.