Proprietary moment connections in AISC 358: ConXL, SidePlate, Strong Frame and DuraFuse

Four chapters of AISC 358-22 cover patented connections. They solve problems the open connections cannot, from biaxial box columns to replaceable fuses, but they come with an owner, a license and a design service. Here is how proprietary moment connections work and how to plan for one on a US project.

· 6 min read · World Steel USA engineering team

Most prequalified connections in AISC 358-22 belong to everyone: any engineer can design an RBS, any qualified shop can build an end plate. Four chapters are different. They open with a notice that compliance requires an invention covered by patents, and that the patent holder has stated a willingness to license on reasonable and nondiscriminatory terms. These proprietary moment connections are ConXtech ConXL (Chapter 10), SidePlate (Chapter 11), Simpson Strong-Tie Strong Frame (Chapter 12) and DuraFuse Frames (Chapter 15). They exist because they solve problems the open connections do not. This article explains what each does and how one is planned into a US project, without endorsing any of them.

What the standard says about them

A user note in Section 1.1 is short and important: proprietary connections are optional, their inclusion is not an endorsement, and non-proprietary options are available. The patent notices add that AISC takes no position on the validity of the patents. For a project team, the practical meaning is that choosing one brings a commercial relationship with its owner, typically covering a license, a design service or review, and sometimes supplied parts, on the owner's terms.

ConXtech ConXL, Chapter 10

Section 10.1 describes a full-strength, fully restrained connection of wide-flange beams to concrete-filled 400 mm (16 in.) square HSS or built-up box columns, using a high-strength, field-bolted collar assembly. Beams are shop welded to forged flange and web fittings; these collar flange assemblies bolt through forged or cast collar corner assemblies shop welded to the column. A node can take moment beams on all four faces, so the system suits biaxial moment frames, and beams may include RBS cuts to meet strong-column weak-beam rules. All moment beams at a node have the same nominal depth. The chapter fixes ASTM A574 high-strength bolts and drilled holes, and Section 2.3.2b allows partial-joint-penetration corner welds in the box column at the node.

SidePlate, Chapter 11

Section 11.1 describes interconnecting plates that connect beams to columns with a physical gap between the column flange and the beam end. Full-depth side plates run parallel to the beam web on both sides, sandwiching beam and column, so the beam flanges never weld directly to the column flange. Both field-welded and field-bolted versions exist, the bolted one in configurations A (standard), B (narrow) and C (tuck). Beams may be rolled, built-up or HSS; columns may be rolled or built-up wide flanges, box, boxed or HSS sections, and cruciforms for biaxial frames. Section 2.3.2b gives SidePlate its own exceptions for fillet-welded built-up and cruciform columns.

Simpson Strong-Tie Strong Frame, Chapter 12

Section 12.1 describes a partially restrained connection. A modified shear plate carries shear and lets the beam rotate about a central bolt, with slotted holes elsewhere so it transfers no moment. Moment goes through Yield-Link structural fuses: modified T-stubs or end plates bolted to the beam and column flanges, with a reduced section in the stem that yields, kept from buckling by a separate restraint plate. Section 2.2 makes it the only AISC 358 connection whose force-deformation behavior must be included in the analysis. Section 12.7 specifies that the reduced section of the Yield-Link is cut by laser, plasma or water jet to a finish of 6.3 μm (250 μin.). Damage concentrates in the links, which can be replaced.

DuraFuse Frames, Chapter 15

Chapter 15 is new in 2022. Section 15.1 describes cover plates welded to an I-shaped column, or the sides of a box or HSS column, with external continuity plates extending past the column face. The beam web bolts to a shear plate with horizontal slots; the beam flanges connect to the external continuity plates through top plates and a fuse plate that yields in shear in a severe earthquake while the beam stays essentially elastic. The fuse plate is bolted so it can be removed and replaced after the event. Biaxial configurations work the same way. Bolts are pretensioned F3125 assemblies, threads excluded, up to 30 mm, and Section 15.5 allows holes by drilling, reaming, laser, plasma or water jet.

Why engineers choose them

  • Biaxial frames: ConXL and SidePlate handle moment frames in two directions at one column, which open connections handle less easily.
  • No beam flange to column flange weld: SidePlate and the fuse systems move or remove the most failure-prone weld of the Northridge era.
  • Reparability: Strong Frame links and DuraFuse fuse plates are designed to be replaced after an earthquake, which matters to owners of hospitals, schools and essential facilities in California, Washington and Utah who want to return to use quickly.
  • Speed: bolted versions shorten erection and cut field welding and inspection.
  • Design support: owners usually provide connection design or review, which some project teams value.

What to plan for

When the Engineer of Record specifies one of these connections, a few items should be settled before steel is bought:

  • who designs the connection: the owner's engineers, the Engineer of Record, or a delegated designer, and who reviews;
  • license terms: whether the fabricator needs an agreement with the owner and what it covers;
  • proprietary parts: which pieces, such as forged or cast collars or fuse assemblies, come from the owner or its suppliers, and lead times;
  • fabrication tolerances and inspection specific to the system, and any owner inspection;
  • shop drawing review by the owner as well as the Engineer of Record.

A non-proprietary connection from Chapters 5 to 9, 13 or 14 is always available as an alternative, and the choosing a connection article compares them.

Heavy columns are where we add value

Most proprietary systems leave the main members to the fabricator. Their columns are often built-up boxes, boxed wide flanges or cruciforms with CJP zones at every floor, and their beams may be heavy rolled or welded sections. That is where our shop is strongest: our box columns for the New Hope Dong Nai feed factory were welded, fitted and tested in our plant, and our CNC laser machines cut plate up to 100 mm thick for column plates, continuity plates and cover plates. Welding follows our AWS D1.8 procedures, with in-house ultrasonic testing.

Where a connection owner's terms allow it, the same shop can prepare members to the owner's drawings; where they do not, the Engineer of Record can compare an open AISC 358 connection, and we price both so the project can decide on facts.

Questions to ask before specifying one

A short list helps a project team compare a proprietary system with an open connection on equal terms:

  • Does the connection owner provide the connection design, or only review it, and who carries design responsibility?
  • Which parts must come from the owner or its approved suppliers, and what are their lead times to the jobsite?
  • Does the fabricator need a license or agreement, and how long does that take to set up?
  • What inspection or certification does the owner require at the shop and on site?
  • How does the system handle a field change, such as a beam size revised late in design?

Answers to these questions often decide the choice as much as the structural performance does.

World Steel's position

World Steel does not hold a license or authorization for ConXL, SidePlate, Strong Frame or DuraFuse, and we do not claim one. When a project specifies a proprietary connection, its owner's license and design terms apply. Tell us early: we confirm with the connection owner whether and how we can fabricate the members for your project, and if not, the Engineer of Record can consider an open connection that meets the same performance.

What we do bring is the steel around any of these systems. We fabricate heavy rolled and built-up beams, welded box columns and cruciform columns, with CJP zones, NDT and full traceability, in our plant in Vietnam, accredited under IAS AC472 since 2019 and audited twice a year. Our capacity is 2,500 t per month, and our flagship jobs include the 5,000 t Sunpro Steel mill. The US contractor, our customer, approves the drawings; the Engineer of Record's design governs. For the seismic provisions read the AISC 341 landing.

Quick answers

Which AISC 358-22 connections are proprietary?

Chapters 10 to 12 and 15 carry patent notices: ConXtech ConXL, SidePlate, Simpson Strong-Tie Strong Frame and DuraFuse Frames. The cast bolted bracket and slotted web are no longer proprietary.

Do I have to use a proprietary connection?

No. A user note in Section 1.1 states that proprietary connections are optional, that inclusion is not an endorsement, and that non-proprietary options are available.

Does World Steel hold a license for these connections?

No, and we do not claim one. If the Engineer of Record specifies a proprietary connection, its owner’s license and design terms apply; tell us early and we confirm with the owner whether and how we can fabricate it for your project.

Which proprietary connection is partially restrained?

The Strong Frame connection. Section 2.2 treats every other AISC 358 connection as fully restrained, but the Strong Frame’s force-deformation behavior must be modeled in the seismic analysis.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.