Extended end-plate moment connection: 4E, 4ES and 8ES under AISC 358-22 Chapter 6

The bolted extended end plate is the prequalified moment connection that removes field welding entirely: the beam is shop welded to a plate, and the plate is bolted to the column. Chapter 6 of AISC 358-22 covers three layouts. Here is what each allows and how the design runs, with a note on metal building frames.

· 6 min read · World Steel USA engineering team

A field weld on a seismic moment frame is expensive: certified welders, preheat, weather protection, backing removal, ultrasonic testing and the time all of that takes on a deck. The extended end-plate moment connection removes it. The beam is shop welded to a thick plate that extends above and below the flanges, and the plate is bolted to the column flange with pretensioned high-strength bolts. Chapter 6 of AISC 358-22 prequalifies three layouts of it for special and intermediate moment frames. For a US contractor buying steel from an overseas plant, it is the connection that moves the most quality-critical work into the shop.

Three layouts

Section 6.1 and Figure 6.1 show the three configurations:

  • 4E, four-bolt unstiffened: two bolts on each side of each flange, inside and outside, with no stiffener.
  • 4ES, four-bolt stiffened: the same bolt pattern, with a triangular stiffener welded between the beam flange and the extended part of the plate.
  • 8ES, eight-bolt stiffened: two rows of bolts on each side of each flange, with a stiffener.

The connection can fail in several ways: beam yielding, end plate bending, panel zone yielding, bolt tension or shear rupture, or weld rupture. Chapter 6 sizes everything except the beam to stay stronger, so the inelastic rotation comes from beam yielding.

Table 6.1, the tested range

Section 6.3 is blunt: Table 6.1 summarizes the range of parameters that has been tested, and every connection element must be within it. The main limits, in millimetres:

Parameter 4E 4ES 8ES
Beam depth d 350 to 600 350 to 600 460 to 910
Beam flange thickness 10 to 19 10 to 19 14 to 25
Beam flange width 150 to 230 150 to 230 190 to 310
End plate thickness 13 to 57 13 to 38 19 to 64
End plate width 180 to 270 180 to 270 230 to 380
Bolt gage g 100 to 150 83 to 150 130 to 150
Flange-to-bolt pitch 38 to 110 44 to 140 41 to 51
Bolt row spacing pb n/a n/a 89 to 95

In inch terms, the 4E and 4ES cover beams of about 14 to 24 in. deep and the 8ES beams of about 18 to 36 in. There is no limit on beam weight.

Beam and column limits

Section 6.3.1 adds:

  • rolled or built-up I-shapes; built-up beams use a CJP weld or a pair of fillets each 75 percent of the web thickness, but at least 6 mm (1/4 in.), between web and flanges within the lesser of one beam depth or three flange widths of the end;
  • clear span-to-depth ratio of at least 7 for SMF and 5 for IMF;
  • width-to-thickness ratios to AISC 341;
  • supplemental lateral bracing at top and bottom flanges between the end of the protected zone and half a beam depth beyond it, with nothing attached inside the zone, a location the 2022 edition clarified. A composite slab with welded shear connectors at no more than 300 mm (12 in.) spacing between protected zones removes the need.

The protected zone for an unstiffened plate runs from the column face to the lesser of one beam depth or three flange widths. For stiffened plates it runs to the end of the stiffener plus the lesser of half a beam depth or three flange widths.

Section 6.3.2 limits columns to rolled wide flanges, built-up I-shapes or flanged cruciforms, with the plate bolted to the column flange, and rolled depth up to W920 (W36). Box columns are not listed.

The slab exception

Section 6.2 adds a condition when a concrete structural slab is present. The connection is prequalified only if:

  • the beam is at least 600 mm (24 in.) deep;
  • there are no shear connectors within 1.5 beam depths of the column face;
  • the slab is isolated from the column per Section 2.3.4.

The slab can otherwise act compositely with the beam near the joint and overload the bottom bolts. In practice this pushes composite floor frames toward the 8ES layout, and it puts a stud-free length and a slab gap on the drawings.

Continuity plates and bolts

Section 6.4 sets continuity plate need and size by the column-side checks of Section 6.7. Plates up to 10 mm (3/8 in.) thick may be fillet welded on both sides to the column flanges, sized for Fy times the contact area; thicker plates follow AISC 341.

Section 6.5 sends bolts to Chapter 4: pretensioned ASTM F3125 assemblies. Section 6.6 then fixes the geometry: the gage no wider than the beam flange; pitch at least the bolt diameter plus 13 mm (1/2 in.) for bolts up to 25 mm (1 in.), or plus 19 mm (3/4 in.) for larger bolts; finger shims allowed within RCSC limits. Our bolting requirements article covers the rest.

The design procedure

Section 6.7 runs in two parts.

End plate and bolts

  1. Compute Mpr with Ze = Zb.
  2. Locate the hinge. For 4E, Sh is the lesser of half the beam depth or three flange widths. For 4ES and 8ES, Sh is the stiffener length plus the plate thickness, where the stiffener length is its height divided by tan 30°.
  3. Compute Vh and then Mf at the column face.
  4. Choose the layout, trial geometry and bolt grade.
  5. Size the bolts for tension from Mf, then the end plate for bending by yield-line analysis, so neither governs before the beam yields.
  6. Check the beam flange force against the plate and stiffener, the bolt shear, and bolt bearing and tearout, which the 2022 edition sums over every bolt location.
  7. Design the beam-to-plate welds to Section 6.6.6.

Column side

  1. Check column flange bending at the bolts, with continuity plates if needed.
  2. Check web yielding, web crippling and web buckling of the column at the beam flanges.
  3. Size continuity plates, then check the panel zone and the column-beam moment ratio.

AISC Design Guide 4, listed on our AISC design guides page, walks through these steps with worked examples.

Metal building frames are different

Many US contractors know end plates from pre-engineered metal buildings, where every rafter-to-column knee is a bolted end plate. Those connections are usually not AISC 358 connections. Metal building frames use web-tapered built-up members with thin webs, flush end plates and multi-row bolt patterns that sit outside Table 6.1 and Section 2.3. In higher Seismic Design Categories they normally serve as ordinary moment frames or other systems with their own rules, explained in our AISC 341 series article on OMF, IMF and STMF. Where a project needs a special or intermediate moment frame, the Engineer of Record selects members and end plates that fit Chapter 6, or another connection. Our rigid frame systems cover both cases.

Why contractors choose end plates

  • No field welding on the moment connection, so no field UT of beam flange welds.
  • Fast erection: a beam lands, bolts go in, and pretensioning follows.
  • Shop-controlled quality: the demand-critical flange welds are made flat in the shop and tested there.
  • Clean protected zone: nothing is welded to the beam near the joint on site.

The costs are a thick plate, large bolts, tight fit-up tolerances and the slab rules. The next article covers end-plate fabrication.

Where end-plate frames fit in the US market

Extended end plates are a natural choice for low- and mid-rise steel buildings with moderate spans: two- to five-storey offices, schools, medical office buildings, retail with offices above, and the moment frames around industrial mezzanines. They are common in markets where field welding is costly or hard to inspect, such as remote sites in Alaska, Utah and Nevada, and wherever the erector prefers a bolted job. In the New Madrid zone, where many frames are intermediate rather than special, the 4E and 4ES layouts cover a large share of the beam sizes.

They are less suited to long-span or very heavy frames, where the 910 mm (36 in.) depth limit of the 8ES and the plate and bolt sizes become restrictive, and to frames with composite slabs on shallow beams, where the 600 mm (24 in.) slab rule rules them out. There the RBS, WUF-W or a plate connection usually takes over.

Proof from our plant and projects

End plates are everyday work for us. Every metal building frame we ship is joined by bolted end plates, and our rigid frame systems are built around them, on flagship jobs that include the 2,000 t M&D Warehouse in Thailand and the 1,000 t New Era cold storage. For seismic frames we apply the stricter limits of Table 6.1 and the demand-critical welds of Section 6.6.6 on top of that routine.

Our sample Design Report shows the kind of calculation package an Engineer of Record receives, and our Tekla drawings carry every plate, stiffener and bolt dimension. The plant is accredited under IAS AC472 since 2019, audited twice a year, and our welders are qualified to AWS D1.8. Customers follow production in real time in PEB Studio.

How World Steel supplies end-plate frames

Our engineers check each joint against Table 6.1 and Sections 6.3 to 6.7, detail the plate, stiffener, bolts, continuity plates and protected zone in Tekla, and send the calculations to the Engineer of Record for review. The plates are cut on our CNC laser machines, which handle steel up to 100 mm thick, and the beam-to-plate welds are made in the shop to our AWS D1.8 procedures. Our plant in Vietnam is accredited under IAS AC472. Bolting and erection on site are the US contractor's scope. For the seismic provisions read the AISC 341 landing.

Quick answers

What are 4E, 4ES and 8ES end plates?

The three prequalified layouts of AISC 358 Chapter 6: four-bolt unstiffened (4E), four-bolt stiffened (4ES) and eight-bolt stiffened (8ES) extended end plates, where the plate extends above and below the beam flanges.

How deep can a beam with an extended end plate be?

Table 6.1 allows beam depths from 350 mm to 600 mm for the 4E and 4ES layouts, and from 460 mm to 910 mm for the 8ES layout.

Can extended end plates be used with a concrete slab?

In SMF and IMF with a structural slab, only if the beam is at least 600 mm (24 in.) deep, there are no shear connectors within 1.5 beam depths of the column face, and the slab is isolated from the column.

Are metal building end plates prequalified?

Usually not. Most metal building frames use tapered, thin-web members and flush or multi-row end plates outside Table 6.1, so they serve as ordinary moment frames or other systems designed to their own rules.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.