Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022
Long Son petrochemical complex
Pipe racks and process structures, about 2,000 t, fabricated by World Steel for a petrochemical complex.
Project pageLarge-project capacity
An LNG train is measured in thousands of tons of rack and structure steel, and the belt builds several at once while data campuses rise inland. Our plant fabricates 2,500 metric tons (about 2,750 US tons) a month, and the Long Son petrochemical complex, about 2,000 t of steel including its pipe racks, was ours.
Main racks, sleeper ways and utility bridges in long runs of repeated bents, match-marked bay by bay.
Zinc-rich and epoxy systems, or hot-dip galvanizing, chosen for salt air and humidity and recorded piece by piece.
Process owners write their own steel specs. We fabricate to them, with the ITP and hold points agreed before cutting.
Largest single jobs, metric tons
Plant output: 2,500 t (about 2,750 US tons) a month. How large jobs run
Down the belt
From the Sabine to the north of the state, five stops on the belt and the steel each one buys.
The heaviest repeat steel on a train
Main racks run for kilometers in near-identical bents. We detail the bent family once, fabricate it in long runs and ship it bay by bay with piece marks your crew can read from the ground.
Rolled or built-up bents, often in long runs of one shape.
Bracing and struts tying the bents into a line.
Upper tiers for electrical and instrument cables.
Access to valves and instruments on the rack.
What the belt buys
Proof of scale
Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022
Pipe racks and process structures, about 2,000 t, fabricated by World Steel for a petrochemical complex.
Project page
Steel industry · Can Tho City, Vietnam · 2024
Our largest job, about 5,000 t: proof we can carry the tonnage of a full LNG support package.
Project page
Warehouse and industrial · Thailand · 2024
About 2,000 t of large repeat frames, the pattern of a data campus delivered hall by hall.
Project pageReference jobs fabricated by World Steel outside the US, shown for scale and process. Tonnage in metric tons.
Port to site
The belt is a coast, so steel can sail straight in. Port of New Orleans serves the river corridor, Houston and the Sabine serve the west, and Mobile is the option for the east.
Sailing, packing and tracking: shipping steel from Vietnam to the USA. Inland moves follow the Incoterm you buy on.
Site conditions
Each condition has its own guide in the state guide set. The corridor view stops here; the detail lives there.
In our plant in Vietnam
Photos of the Long Son petrochemical complex in Vietnam, about 2,000 t of structural steel fabricated by World Steel. Not a Louisiana site.
States on this corridor
Every state on the corridor has its own structural steel guide set. Start there for the adopted code, wind, snow, seismic and soil questions behind your package.
Who does what
Win-win partnership
You bring the owner relationships, the craft labor and the site safety program. We bring 2,500 t a month, the Long Son rack experience and steel shipped into your Gulf port. Together we take the packages that would otherwise wait for a local shop.
Megaproject corridors
The building types behind these corridors: structural steel by project type. Every state guide set: structural steel solutions by state.
Questions
Yes. The Long Son petrochemical complex, about 2,000 t of structural steel, included pipe racks and process structures fabricated in our plant in Vietnam. The project page shows the steel.
Structural steel: pipe racks, utility bridges, equipment structures, platforms, stairs, shelters, shops, warehouses and control building frames. LNG tanks, cold boxes, process modules, loading arms and piping are not our scope.
Yes. Process owners usually write their own structural, welding and coating specs. We fabricate to them, agree the inspection and test plan before cutting and keep the records for your QA team.
Usually the Port of New Orleans for the river corridor and Plaquemines, or Houston for Lake Charles and the Sabine. The choice depends on the site and the Incoterm you buy on.
With a coating system picked for the exposure: zinc-rich primer with epoxy and polyurethane, or hot-dip galvanizing where the specification asks for it, applied in our paint hall with dry film readings recorded.
The US contractor, our customer. World Steel designs and fabricates only. Your Engineer of Record approves the drawings and handles the PE seal and the permit.
Send the plot plan, the steel takeoff or the drawings and the owner’s specs. We return a written scope, fabricated in our plant in Vietnam and shipped to New Orleans, Houston or Mobile.