Double-tee moment connection: bolted T-stubs for seismic frames under AISC 358-22 Chapter 13

The double-tee is the oldest bolted moment connection idea, rebuilt for seismic frames: T-stubs cut from rolled shapes are bolted to the column and to the beam flanges, with no welding at the joint at all. Chapter 13 of AISC 358-22 sets its limits. Here is where the double-tee moment connection fits and what it asks of the shop.

· 6 min read · World Steel USA engineering team

Long before seismic prequalification, steel frames were stiffened with split-tee connections: a wide-flange cut along its web into two tees, one bolted above the beam and one below, both bolted to the column. After Northridge, researchers returned to the idea because it avoids every weld at the joint. Tested under cyclic loading and given strict limits, it became the double-tee moment connection, Chapter 13 of AISC 358-22. It is the only prequalified connection in the standard that is fully bolted at both the column and the beam with no welded plate, which makes it worth knowing for bolted frames, small beams and some retrofit work.

How the double-tee works

Section 13.1 describes the parts. T-stubs are bolted to the column flange with either four or eight tension bolts and to the beam flanges with shear bolts. The top and bottom T-stubs are identical and are cut from rolled sections. The beam web connects to the column with a bolted single-plate shear connection. Yielding and the hinge form in the beam near the ends of the T-stub stems.

Section 13.2 prequalifies it for SMF and IMF. In an SMF with a concrete structural slab, the slab must be isolated from the column. A user note adds a warning unique to this chapter: SMF and IMF connections must be fully restrained, and a double-tee can satisfy every strength check yet still be flexible enough to behave as partially restrained. The designer must check stiffness as well as strength.

Beam limits

Section 13.3.1 sets the tightest beam limits of the non-proprietary connections:

  • rolled or welded built-up I-shapes per Section 2.3;
  • depth up to W610 (W24);
  • weight up to 82 kg/m (55 lb/ft);
  • flange thickness up to 16 mm (5/8 in.);
  • clear span-to-depth ratio at least 9 for both SMF and IMF;
  • width-to-thickness ratios to AISC 341;
  • lateral bracing between db and 1.5db beyond the bolt farthest from the column, none inside the protected zone. A composite slab with headed stud anchors at no more than 300 mm (12 in.) between protected zones removes the need for supplemental bracing at the hinges.

The protected zone includes the T-stubs and the beam from the column face to one beam depth beyond the farthest bolt.

Column limits

Section 13.3.2 accepts rolled wide flanges, built-up I-shapes and flanged cruciforms, with the beam on the column flange. Rolled columns go up to W920 (W36) with a concrete structural slab but only W360 (W14) without one, the same split as the bolted flange plate. Box columns are not listed.

T-stubs, continuity plates and bolts

Section 13.4 sets the detailing.

T-stub material

T-stubs are cut from rolled sections to ASTM A992 or ASTM A913 Grade 50 (345 MPa). Built-up tees are not permitted. Our article on A992 wide flange shapes explains the grade.

Continuity plates

Continuity plates are required, at least as thick as the beam flange, extending to the edge of the column flange less 6 mm (1/4 in.), welded to AISC 341.

Shear plate welds

The shear plate is welded to the column flange with CJP welds, two-sided PJP welds or two-sided fillets.

Bolts and holes

  • Bolts symmetric about the member axes.
  • Shear bolts at the stem-to-beam flange joint: two per row. Tension bolts at the tee flange-to-column joint: two horizontal rows of two or four bolts.
  • Hole types: standard in the beam flange and column flange; standard or short-slotted, parallel to the beam, in either the web or the shear plate; standard or oversized in the T-stem; standard, oversized or short-slotted, parallel to the column, in the T-flange.
  • Holes in the T-stubs and beam flanges are drilled or sub-punched and reamed.
  • The ratio of tension bolt gage to T-flange thickness is no more than 7.0, which controls prying.
  • All bolts are pretensioned.
  • Faying surfaces of the beam flange and T-stem meet the AISC 360 slip-critical rules with a Class A slip coefficient or higher. A user note allows oversized stem holes with pretensioned bolts not designed as slip-critical, consistent with AISC 341 Section D2.2.

Shims

Steel shims up to 6 mm (1/4 in.) may sit between the stems and the beam flanges, and finger shims between the tee flanges and the column, within RCSC limits.

The design procedure

Section 13.5 runs from the beam through the tee to the column. It computes the probable maximum moment, checks the net section of the beam flange at the bolt holes, a check the 2022 edition made common to the BFP, CBB and double-tee, locates the hinge at the bolt farthest from the column, and derives the face moment and the force in each T-stub. It then sizes the shear bolts in the stem, checks the stem for yield, rupture, block shear and compression buckling, and sizes the tension bolts and T-flange for bending with prying. The column side follows: flange bending, web yielding and crippling, continuity plates, panel zone and moment ratio. A stiffness check confirms that the connection acts as fully restrained.

Where the double-tee fits

The limits point to small and light beams: up to W610 (W24) and 82 kg/m (55 lb/ft). That suits low-rise frames with short bays, mezzanines and penthouse frames, and frames where no welding at all is wanted on site. It is also used where an existing steel frame is upgraded or extended and field welding near occupied space is undesirable; our seismic retrofit and expansion guide covers that context. It is less suited to long spans, deep girders or composite floors without slab isolation.

Fabrication notes

For the shop, the double-tee is a cutting and drilling job more than a welding one:

  • Splitting the tees from heavy rolled shapes, keeping the stem straight and the flange flat after cutting;
  • drilling every hole in the T-stubs and beam flanges, or sub-punching and reaming, never laser or plasma, as Section 13.4.4 requires;
  • matching hole patterns between stem, beam flange, T-flange and column flange, with the allowed hole types on each;
  • faying surfaces left bare or primed to Class A and masked in the paint system;
  • continuity plates and shear tab welded to the column in the shop to our AWS D1.8 procedures;
  • identical top and bottom T-stubs, marked as a matched set.

Our bolt-hole fabrication article explains why the hole process matters in this connection.

Proof from our plant and projects

Double-tee frames are a cutting and drilling job, and that is where our shop is strongest. Our CNC equipment splits and cuts rolled shapes to the model, every hole the chapter requires is drilled or reamed, and the T-stubs are marked and packed as matched sets with their bolts. Columns arrive with continuity plates and shear tabs welded to our AWS D1.8 procedures and tested in house.

We supply frames at scale: our flagship jobs include the 5,000 t Sunpro Steel mill, the 2,500 t CPV Food plant and the 2,000 t M&D Warehouse in Thailand, where hole accuracy decides how fast the erectors can work. For small multi-storey frames, our projects range from a three-storey college of medicine in the Philippines to the FPI Barracks in Guam.

The plant is accredited under IAS AC472 since 2019 and audited twice a year, materials are tested at ILAC-accredited labs or the lab the customer names, and customers follow production in real time in PEB Studio.

A note on retrofit work

When a double-tee is used to add moment frames to an existing building, the new tees and plates must match an existing column whose real dimensions may differ from the drawings. Field measurement of column flange width, thickness and hole positions before shop drawings are finished avoids most fit-up problems.

How World Steel supplies double-tee frames

Our engineers check each joint against Section 13.3, including the stiffness warning, detail the T-stubs and bolt patterns in Tekla, and send the calculations to the Engineer of Record for review. Tees are split from A992 rolled shapes, holes drilled, and columns prepared with continuity plates and shear tabs. Our plant in Vietnam is accredited under IAS AC472, the first and only in Vietnam. Structural bolts and shims can ship with the package, bundled by connection mark. Bolting and erection are the US contractor's scope. For the seismic provisions read the AISC 341 landing.

Quick answers

What is a double-tee moment connection?

A bolted moment connection in which two T-stubs cut from rolled shapes are bolted to the column flange and to the top and bottom beam flanges, with a bolted shear plate for the web. The beam hinges near the end of the T-stub stems.

What beam sizes can a double-tee connect?

Section 13.3.1 limits rolled beams to W610 (W24), 82 kg/m (55 lb/ft) and 16 mm (5/8 in.) flanges, with a clear span-to-depth ratio of at least 9 in both SMF and IMF.

What steel are the T-stubs?

They are cut from rolled sections to ASTM A992 or ASTM A913 Grade 50 (345 MPa), and the top and bottom T-stubs must be identical.

Why does the standard warn about stiffness?

A double-tee can meet every strength check yet behave as a partially restrained connection. SMF and IMF connections must be fully restrained, so the designer confirms stiffness as well as strength.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.