We fabricated the pipe racks for the Long Son petrochemical complex
Long Son is a petrochemical complex on Vietnam’s southern coast. World Steel fabricated its pipe racks and, on the same site, a 56,000 m² long-span steel building, all from our own plant and all to the owner’s and EPC contractor’s specifications. It is the reference we put in front of US contractors bidding refinery, chemical and LNG racks.
- Pipe racksfabricated by World Steel for the Long Son petrochemical complex
- 2,000 t(2,200 short tons) World Steel project at Long Son
- 56,000+ m²(about 600,000 sq ft) of steel structures on the same site
- 2022completed for an oil and gas owner, to owner and EPC specifications
Capacity for long racks
A rack of hundreds of repeat bents is the work our plant is built for
Pipe racks are large, repetitive steel packages. They run through the same beam lines, lasers and paint hall as our largest jobs.
Anatomy of a pipe rack
Bents, tiers, struts and braced bays: what we fabricate
Left, a typical bent in section. Right, a run of bents along the rack with a braced bay and an expansion break. Every part below is detailed, fabricated and marked in our plant.
Bents
Two columns and one or more transverse beams, repeated along the rack at the spacing the piping layout sets.
Shop-welded or bolted frames, held to one drawing so every repeat fits.
Tiers
The levels the pipe sits on. Process lines, utilities and cable trays usually get tiers of their own.
Transverse beams with clips, stops and guide plates where the drawings show them.
Longitudinal struts
Beams that tie bents together along the rack and carry intermediate pipe supports between bents.
Bundled by bay with their end connections attached.
Braced bays
Diagonal bracing in chosen bays that takes friction, anchor and wind forces along the rack to the foundations.
Gussets welded in the shop, braces slotted or plated for bolting.
Cable tray tier
A top or side tier for power and instrument trays, often kept apart from the hot lines.
Tray support beams and drop brackets to your electrical layout.
Walkways and access
Platforms, ladders and handrails that reach valves and instruments on the rack.
Grating supports, ladders with cages and guardrail posts to OSHA layouts on your drawings.
Base plates and anchor rods
Where every column meets its foundation, fixed or pinned as the design requires.
Base plates welded, anchor rod plan issued first, rods and templates in an early lot when agreed.
Expansion breaks
Gaps along very long racks that let the steel move with temperature without fighting the anchors.
Slotted or doubled bents detailed where your engineer places the break.
Rack types
Six kinds of rack we fabricate for US plants
-
Main process racks
Multi-tier racks along the spine of a refinery, chemical or LNG unit, carrying process lines, utilities and trays together.
Oil, gas and petrochemical steel -
Offsite and utility racks
Longer, lighter racks between tank farms, loading areas, utilities and the process units.
Long Son reference -
Pipe bridges and road crossings
Truss or girder spans that lift the lines over roads, rail and access ways at the clearance the plant needs.
Steel trusses -
Single-column T racks
One column and a cantilever beam for light lines along buildings and inside plant areas.
Hot-rolled members -
Utility racks for campuses
Chilled water, process water, gases and power between central plants and production halls on data center, battery and fab campuses.
Data center rack guide -
Slurry and tailings racks
Repeated bents for slurry, tailings, water and air lines between the areas of a mine or mineral plant.
Mine rack guide
Design basis
The load cases every bent is checked for
A pipe rack is sized by the piping on it. We design or check every bent and braced bay from the load data you send, to ASCE 7 and AISC 360, and to Process Industry Practices criteria such as PIP STC01015 when the owner’s specification names them. The calculations go to your Engineer of Record for review and approval.
| Load case | What it covers | Who gives us the data |
|---|---|---|
| Dead load | Self-weight of the steel, walkways, trays and any fireproofing. | Our model, with your fireproofing specification |
| Pipe operating | Pipe, insulation and contents in service, line by line or as the owner’s uniform allowance. | Piping stress engineer or owner criteria |
| Hydrotest | Lines full of test water, often heavier than operating for gas and vapor lines. | Piping stress engineer |
| Thermal and friction | Pipes sliding on their supports as they heat and cool, pushing the beams sideways and along the rack. | Piping stress engineer |
| Anchors and guides | Concentrated forces where lines are fixed or guided, taken to the braced bays. | Piping stress engineer |
| Cable trays | Tray and cable weight, plus future fill the electrical design allows for. | Electrical designer |
| Wind | Wind on the steel, the pipes and the trays, with the shielding the code allows. | ASCE 7, site data from your EOR |
| Seismic | Rack treated as a nonbuilding structure, with the pipe mass that moves with it. | ASCE 7 Chapter 15, AISC 341 where required |
| Future allowance | Spare space and load kept for lines added later, as the owner specifies. | Owner design criteria |
| Erection and maintenance | Temporary and maintenance loads on beams and walkways. | Owner criteria and your erection plan |
Designed and fabricated to
- ASCE 7
- AISC 360
- AISC 341 where the seismic system needs it
- AWS D1.1
- AWS D1.8 for seismic welds
- RCSC bolting
- PIP criteria when specified
- ASTM A123 galvanizing
- ISO 12944 paint systems
- UL 1709 fire curve when specified
In our plant in Vietnam
From rack model to marked, coated bents
Modeled from your GA and loads
The rack is built in one Tekla model from the plot plan, rack general arrangement and stress loads, then every bent, strut and brace is detailed for approval.
Cut and holed by laser
Plates, gussets and base plates up to 100 mm (4 in) thick are cut and holed by laser, so bolt patterns match across every repeat bent.
Fitted in jigs, welded to AWS D1.1
Repeat bents are fitted in jigs and welded by qualified welders, with AWS D1.8 procedures where the rack is part of a seismic system.
Checked against the drawing
Column length, beam elevations, hole groups and squareness are measured before coating, and the result is logged against the piece mark.
Blasted, coated or galvanized
Steel is blasted and painted in our paint hall, or sent to the galvanizer your project names, with masking at faying surfaces and fireproofing zones.
Tracked piece by piece
Each piece carries a painted mark and a QR tag, and its progress, inspection records and photos show in PEB Studio for your team and inspector.
Coatings and fireproofing
Protected for the plant’s exposure and its fire scenario
Corrosion protection
- Hot-dip galvanizingMembers galvanized to ASTM A123, bolts and small parts to ASTM A153, at the galvanizer your project specifies. A good fit for long offsite racks with little maintenance access.
- Paint systems for the exposureZinc-rich, epoxy and polyurethane systems sized for ISO 12944 C4 to CX, from Jotun, PPG, Carboline, Hempel, Nippon or International Paint, products your maintenance team can buy in the US for touch-up.
- Duplex where it is worth itGalvanizing plus a paint system for coastal refineries, cooling tower drift and chemical splash zones.
Fire protection
- Hydrocarbon fire protectionRacks that carry flammable lines often need their columns and lower beams protected against a hydrocarbon pool fire. The owner’s specification sets which members, how high and to which rating.
- Intumescent in our paint hallEpoxy intumescent can be applied in our plant when agreed with the coating manufacturer, with the primer, thickness and topcoat recorded member by member.
- SFRM on siteCementitious or sprayed fire-resistive material is applied on site by the US contractor’s applicator. We leave the steel primed with a compatible primer and the attachment zones clear.
Packing and shipping
Shipped rack segment by rack segment
Anchor rod plans go out first. Then the steel is packed so your crew can set the rack in the order it arrives at your US port.
Bents within shipping limits
Bents travel assembled when they fit a container or flat rack, otherwise knocked down with bolted beam-to-column joints. The split is planned before detailing.
Struts and braces by bay
Longitudinal struts, braces and walkway frames are bundled by bay and rack segment, never mixed across areas.
Bolts packed by connection
Structural bolts, nuts and washers travel bagged and labeled by connection type, with their certificates.
Lists keyed to the grid
Every bundle and container has a packing list keyed to the rack segment and grid line on the erection drawings.
World Steel
What we design, fabricate and ship
- Rack design or design check from your load data, with calculations for your Engineer of Record
- Tekla model, shop drawings and erection drawings, included on every project
- Fabrication in our own IAS AC472-accredited plant in Vietnam
- Blasting, painting, shop-applied intumescent when agreed, or galvanizing at the project galvanizer
- Material certificates traced to each piece, inspection and coating records in PEB Studio
- Packing by rack segment and shipping to your US port
The US contractor, our customer
What stays with your team on site
- Engineer of Record review, approval and any seal the jurisdiction requires
- Foundations, anchor rod setting and grout
- Erection, plumbing and bolting of bents, struts and bracing
- Pipe setting, pipe shoes and field welding of attachments
- SFRM fireproofing applied on site and its inspection
- Permits, special inspection and site safety
Where US contractors need racks
Pipe racks for every kind of US plant
- Gulf Coast refining and petrochemicalsUnit expansions and turnarounds along the Texas and Louisiana coast.
- LNG export terminalsLong racks between trains, tanks and the jetty, in coastal exposure.
- Chemical and specialty plantsCorrosive service where coating systems matter as much as tonnage.
- Battery and EV plantsProcess water, solvents and power between utility buildings and production halls.
- Semiconductor fabsUtility racks for ultrapure water, gases and power across the campus.
- Data center campusesChilled water and power routes from the central plant to the halls.
- Mines and mineral processingSlurry, tailings and water lines between plant areas.
- Power and utilitiesSteam, fuel and cooling water racks for generation and industrial utilities.
How to order
What to send for a pipe rack quote
The more of this you can share, the closer our first proposal is to the rack you will build. Missing items are fine: our engineers will tell you what they assumed.
- Plot plan and rack general arrangement, with grid lines and elevations
- Pipe stress output or the owner’s uniform load criteria, with anchor and guide forces
- Cable tray layout and loads
- Owner and EPC design criteria, including any PIP practices named
- Site location for ASCE 7 wind and seismic data
- Coating and fireproofing specification, or the plant’s exposure
- Your Engineer of Record’s design drawings, if the rack is already designed
- Bid date and the sequence you want the rack segments delivered in
Questions from US contractors
Steel pipe racks, answered
Did World Steel really fabricate pipe racks for a petrochemical plant?
Yes. World Steel fabricated the pipe racks for the Long Son petrochemical complex in southern Vietnam, a project completed in 2022, alongside a 56,000 m² long-span building on the same site. The work followed the owner’s and EPC contractor’s specifications and was traced member by member.
Can you design the rack, or do you only fabricate?
Both. Our engineers can design the bents and braced bays from your piping loads and design criteria, or fabricate exactly to your Engineer of Record’s design. In both cases the calculations and drawings go to your EOR for review and approval; World Steel does not provide a PE seal.
Which design criteria do you work to?
ASCE 7 for loads, AISC 360 for steel design, AISC 341 where the rack is part of a seismic force-resisting system, and AWS D1.1 for welding. When the owner’s specification names Process Industry Practices such as PIP STC01015, we design to those criteria as well.
What do you need from our piping team?
The rack general arrangement and either the pipe stress output, with operating, hydrotest, friction and anchor loads, or the owner’s uniform load criteria. Cable tray loads and any future allowance complete the picture.
Do you supply pipe shoes, guides and clamps?
Steel stops, guide plates and clips welded to the rack beams are fabricated with the rack when they are shown on the drawings. Engineered pipe shoes, clamps and spring supports are normally bought by the piping contractor; we can quote them on request.
Can the racks be galvanized?
Yes. Members can be hot-dip galvanized to ASTM A123 at the galvanizer your project specifies, with bolts to ASTM A153 or F2329. We detail vent and drain holes and keep bent sizes within the galvanizing kettle limits.
Can you apply fireproofing before shipping?
Epoxy intumescent can be applied in our paint hall when agreed with the coating manufacturer, with thickness recorded per member. Cementitious or sprayed fireproofing is applied on site by the US contractor’s applicator over the compatible primer we apply.
How do long racks ship from Vietnam?
Bents ship assembled when they fit a container or flat rack and knocked down when they do not, with struts, braces and walkways bundled by bay. Every packing list is keyed to the rack segment and grid line, so your crew sets the rack in the order it arrives.
Do you erect the racks?
No. World Steel designs, fabricates and ships the steel. Foundations, erection, pipe setting, field welding and site inspection are the scope of the US contractor, our customer.
Can you deliver the rack as pipe rack modules?
Yes. Instead of loose bents and struts, rack sections can be built in our plant as pipe rack modules with the piping, cable tray and walkways already installed, then shipped within transport limits for setting on site. See our process modules page for the turnkey scope.
Bidding a refinery, chemical or LNG rack?
Send the rack general arrangement and the piping loads. Our engineers check the bents and braced bays against US codes and quote the rack steel from a plant that fabricates 2,500 metric tons a month.