Heavy industry · Can Tho City, Vietnam · 2024 · our largest single job
Sunpro Steel Factory
5,000 tabout 5,500 short tons
Steel structure designed, fabricated and supplied by World Steel.
Inside a fab, level by level
A cross-section of a typical fab block, roof to subfab, with the utility structures beside it. The red levels are the steel we fabricate; the hatched levels are concrete and systems by other trades. Diagram, not to scale.
Make-up air units, exhaust fans and screens on dunnage steel.
Steel we fabricateDeep trusses spanning the cleanroom without interior columns.
Steel we fabricatePlatforms for fan filter units, ducts and hung utilities.
Steel we fabricateTool floor on a stiff concrete waffle slab, cleanroom systems by others.
By othersPumps, abatement and utility distribution under the tool floor, concrete frame by others.
By othersWorld Steel structural steelConcrete, cleanroom systems and tools by others
Around the fab, also steel we fabricate
Chillers, boilers, water and gas plant in braced multi-level frames.
Process piping, bulk gases and cable trays between the CUB and the fab.
Canopies and support steel for bulk gas and chemical systems.
What makes this project type different
A fab is built around two things: a cleanroom floor that must not move, and an enormous volume of air, gases, chemicals and water that must reach every tool. The floor is usually a stiff concrete waffle slab on its own columns. Above it, the roof spans the whole cleanroom without interior columns and carries fan filter units, make-up air handlers, exhaust and hung utilities. Below and beside it, the subfab and the central utility building hold the plant that feeds the tools.
That makes the steel package large and repetitive: deep roof trusses, interstitial fan deck framing, braced frames for the central utility building, and pipe racks and utility bridges that carry process piping between buildings. Vibration governs the stiffness of the roof and of any steel that touches the cleanroom structure, so the design team sizes it to the fab’s criteria and the fabricator holds the tolerances on the approved drawings.
VC curves for the tool floor set how stiff the roof and platforms must be, and where steel may touch the cleanroom structure.
Fan filter units, make-up air units and exhaust systems put heavy, closely spaced loads on the roof and interstitial levels.
Process piping, bulk gases, ultrapure water and cable trays run on racks and bridges between the CUB and the fab.
HPM rooms, gas yards and chemical storage bring the owner’s fire and separation rules into the steel design.
Coatings, shop finishes and clean packing are chosen so no field painting or grinding happens near the cleanroom.
Fabs are built shell first and fitted out phase by phase, so steel is released by area and by phase.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Fab roof | Deep long-span trusses or plate girders on braced columns | Roof trusses, girders, columns, bracing, purlins |
| Fan deck and interstitial | Steel platforms over the cleanroom for fan filter units and services | Platform framing, grating supports, walkways, hangers |
| Central utility building | Multi-level braced frames for chillers, boilers and water plant | Columns, floor beams, bracing, equipment supports |
| Pipe racks and utility bridges | Multi-tier racks and truss bridges between buildings | Rack bents, tier beams, struts, bridge trusses, walkways |
| Gas and chemical yards | Canopies, pads and support steel for bulk systems | Canopy frames, support steel, access platforms |
| Office, lab and stair towers | Multi-story braced or moment frames beside the fab | Columns, floor beams, deck support, stairs |
Our advice before you bid
Which levels, which VC curve and which steel may touch the cleanroom structure. The design team sizes for it; we fabricate and check to the tolerances shown.
Fan filter, air handling and utility loads change late. An agreed allowance lets the roof steel be released before the MEP design is final.
Coating system, shop finish and packing for steel near the cleanroom, so nothing has to be painted or ground on site.
Pipe racks and utility bridges repeat by the hundred. Detailed and shipped as their own sequence, they can arrive while the fab shell is still going up.
Fab roof, CUB, racks and support blocks each get their own model area, drawings and shipments.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Heavy industry · Can Tho City, Vietnam · 2024 · our largest single job
5,000 tabout 5,500 short tons
Steel structure designed, fabricated and supplied by World Steel.
Process plant with pipe racks · Ba Ria–Vung Tau, Vietnam · 2022
2,000 tabout 2,200 short tons
Steel structure designed, fabricated and supplied by World Steel.
Electronics materials plant · Ho Chi Minh City, Vietnam · 2023
Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Trusses trial-checked
Long-span roof trusses fabricated and dimension-checked in our plant before they ship.
Racks in batches
Pipe rack bents and utility bridges fabricated in batches and packed by rack segment.
Tracked piece by piece
PEB Studio shows every member from cutting to packing, by building and by phase.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Photo
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
Yes, for the steel structures of the campus: fab roof trusses and girders, fan deck and interstitial framing, central utility building frames, pipe racks, utility bridges, gas yard steel and support blocks. We fabricate up to 2,500 metric tons a month in our plant in Vietnam.
No. The waffle slab and the cleanroom floor are concrete work, and cleanroom walls, ceilings and tool hook-up are other trades. We supply the structural steel around them.
The owner’s vibration consultant sets the criteria and your Engineer of Record sizes the steel for them. We fabricate to the approved drawings and record the dimensional checks.
The coating system, shop finish and packing are agreed before fabrication. Steel is fully finished in our paint hall and wrapped by area, so it can be erected without painting or grinding near the cleanroom.
Our references are heavy industrial plants up to about 5,000 t, the Long Son petrochemical complex with its pipe racks, and electronics plants such as Nitto Denko in Vietnam. A fab package is made of the same structure types: long-span trusses, multi-level braced frames and pipe racks.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.