Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Shop floor of the World Steel fabrication plant with steel members in production

Engineering and codes

Cast bolted bracket and slotted web connections: two moment connections opened up in AISC 358-22

AISC 358-22 lists two connections that used to belong to their inventors and are now open to any qualified designer and fabricator: the cast bolted bracket and the slotted web. One is bolted through high-strength steel castings, the other is welded with slots cut in the beam web. Here is how each works and where it fits.

· 6 min read · World Steel USA engineering team

Several connections in AISC 358 began as patented inventions. When patents expire or owners release them, the connection does not leave the standard; its chapter is rewritten so that any qualified designer and fabricator can use it. The 2022 edition did exactly that for two connections. Its preface states that Chapter 9, the cast bolted bracket (CBB), and Chapter 14, the slotted web (SW), were updated because they are no longer proprietary. They work in very different ways, one fully bolted through steel castings, the other fully welded with a modified beam web, and each fills a gap the other connections leave.

The cast bolted bracket, Chapter 9

How it works

Section 9.1 describes a high-strength cast steel bracket fastened to each beam flange and bolted to the column flange. The bracket may be welded to the beam flange, in five W-series configurations, or bolted to it, in two B-series configurations. The bracket is proportioned to develop the probable maximum moment of the beam, and the hinge forms in the beam at the end of the bracket, away from the column face. Section 9.2 prequalifies it for SMF and IMF; in SMF with a structural slab, the slab must be isolated.

Limits

Section 9.3 sets:

  • beams up to W840 (W33), 190 kg/m (130 lb/ft) and 25 mm (1 in.) flanges;
  • beam flange width at least 150 mm for W-series and 250 mm for B-series brackets;
  • clear span-to-depth ratio at least 9 in SMF and IMF;
  • supplemental bracing in SMF between d and 1.5d from the end of the bracket, nothing attached from the column face to d beyond the bracket, waived with a qualifying composite slab;
  • protected zone from the column face to one beam depth beyond the bracket;
  • columns with flanges at least 300 mm wide, rolled depth up to W920 (W36) with a slab and W360 (W14) without, and box columns no more than 400 mm wide or deep.

The castings

The brackets are castings made to Appendix A: a specified cast steel grade, a first article inspection, NDT of every casting, weld repair rules, tensile and Charpy tests and casting identification, with manufacturer submittals. Section 9.3.3 sets tight tolerances: ±2 mm on thickness, edge and end distances and hole location, and ±3 mm on overall size. Column bolt holes in the bracket are vertical short slots; beam bolt holes are standard.

Bolts and box columns

Section 9.4 fixes the column fasteners as pretensioned ASTM F3125 A490 or A490M, or ASTM A354 Grade BD bolts or threaded rods. Column flange holes are 3 mm larger than the bolt and drilled or sub-punched and reamed. Finger shims are allowed. On box columns, a washer plate on both faces spreads the bolt forces, and the bolts pass through the column to the far face. A 45 mm spacer plate is used where a second connection frames into the orthogonal face. Welded brackets use demand-critical fillet welds to AWS D1.8.

Where the CBB fits

The CBB brings a bolted field connection to beams too heavy for the double-tee and offers a bolted option on box columns with frames in two directions. Its cost is in the castings and the tight tolerances. It suits projects where field welding is unwelcome and the castings can be ordered early in the schedule.

The slotted web, Chapter 14

How it works

Section 14.1 describes slots cut in the beam web parallel and next to each flange. Under large rotation the beam flanges yield and buckle in the slotted region, and the web yields near the end of the shear plate. The slots separate the flanges from the web near the column, so each flange behaves like a plate in tension and compression, and the stress concentration at the center of the flange weld is reduced.

Table 2.1 lists the slotted web for SMF only. Section 14.2 exempts it from slab isolation.

Limits

Section 14.3 allows larger beams than most connections:

  • beams up to W920 (W36), 600 kg/m (400 lb/ft) and 56 mm flanges;
  • clear span-to-depth ratio at least 6.4;
  • no supplemental bracing required at the hinges;
  • a protected zone in the web from the column face to the end of the slots plus half a beam depth, and in the flange from the column face to the end of the slot plus half the flange width;
  • rolled columns up to W920 (W36), box columns up to 600 mm (24 in.).

Welds and slots

Section 14.4 requires CJP demand-critical flange welds, with access holes to AISC 360. Section 14.5 requires the shear plate to be welded to the column flange and both bolted and fillet welded to the beam web, with the web joined to the column by a demand-critical CJP weld over the full plate height. Weld tabs, if used, need not be removed; without them, cascaded ends at up to 45° are used.

Section 14.6 sets the slot fabrication. Slots are made by thermal cutting or milling, with end holes thermally cut or drilled, at a roughness no worse than 25 μm (1,000 μin.), and gouges repaired by grinding. Slots end at 27 mm holes in beams 600 mm (24 in.) deep or more, and 21 mm holes in shallower beams. A narrow 3 mm slot runs at least the width of the shear plate, with the widths and tolerances of Figure 14.3.

Where the slotted web fits

The slotted web suits heavy SMF beams where the RBS would cut too much flange or the frame is drift-controlled, since the flanges stay full width. Its short span limit and the absence of supplemental bracing help on tight floor plans. The costs are precise slotting, field CJP welding and an SMF-only listing.

Comparing the two

Cast bolted bracket Slotted web
Field joint bolted welded
Systems SMF, IMF SMF only
Largest rolled beam W840 (W33), 190 kg/m W920 (W36), 600 kg/m
Span-to-depth 9 or more 6.4 or more
Slab isolation in SMF required exempt
Special parts Appendix A castings slots and end holes

Choosing between them in practice

The two connections rarely compete. A cast bolted bracket is chosen when a bolted field joint is wanted for beams too heavy for a double-tee, or when moment frames meet a box column from two directions. A slotted web is chosen when a heavy SMF beam needs its full flange width for stiffness or strength and the erector is set up for field welding. In both cases the decision is best made early: castings have a lead time of their own, and slotted beams need their slots, end holes and access holes planned in the shop program before cutting starts. If either option appears late, an RBS or an end plate is usually the faster alternative for the Engineer of Record to consider.

Inspection points to agree early

For a CBB, agree who reviews the casting producer's Appendix A submittals and first article inspection, and where the brackets are checked against the drilled holes before shipping. For a slotted web, agree how slot width, end hole size and roughness are measured and recorded, since these sit in the protected zone and cannot be changed on site.

What World Steel brings

For both connections, the members around the joint are ours. We fabricate heavy rolled and built-up beams, and the welded box columns a CBB frame often uses: our box columns for the New Hope Dong Nai feed factory, shown on the project page, were welded and fitted with bolted connection plates in our own plant. For a CBB, the castings come from a producer working to Appendix A; we drill the column and beam holes to the bracket pattern, check them against the casting tolerances and coordinate the bolt supply. For a slotted web, we cut the slots and end holes to Section 14.6, check roughness and dimensions, and prepare the beam ends for field welding.

Our plant in Vietnam is accredited under IAS AC472, audited twice a year since 2019, and material tests are run at ILAC-accredited labs or the lab the customer names. Welding follows our AWS D1.8 procedures. Field work is the US contractor's scope, and the Engineer of Record's design governs. For the seismic provisions read the AISC 341 landing.

Quick answers

Is the cast bolted bracket still proprietary?

No. The AISC 358-22 preface states that Chapter 9 (cast bolted bracket) and Chapter 14 (slotted web) were updated because these connections are no longer proprietary.

What are the CBB beam limits?

Section 9.3.1 limits rolled beams to W840 (W33), 190 kg/m (130 lb/ft) and 25 mm (1 in.) flanges, with flange width at least 150 mm for W-series and 250 mm for B-series brackets, and a clear span-to-depth ratio of at least 9.

Is the slotted web prequalified for IMF?

No. Table 2.1 lists the slotted web for SMF only. It is the one connection in the standard not listed for intermediate moment frames.

Who makes the steel castings for a CBB?

A casting producer working to Appendix A of AISC 358, with its first article inspection, NDT, tensile and Charpy tests and identification. World Steel fabricates the beams and columns around them.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.