AISC 358 member limits: rolled, built-up, box, cruciform and HSS members in prequalified connections

A prequalified connection is only prequalified when the members it joins fit the standard. Section 2.3 of AISC 358-22 sets the AISC 358 member limits for rolled, built-up, boxed, box, cruciform and HSS members, and the welds that hold built-up plates together near the joint.

· 7 min read · World Steel USA engineering team

Every prequalified connection was proven on test specimens made from particular kinds of members. If the members on your project are different, the test evidence may not carry over. That is why AISC 358-22 opens its design chapter with Section 2.3, Members: a connection counts as prequalified only when it joins members that meet Sections 2.3.1, 2.3.2 or 2.3.3, as the connection's own chapter allows. These AISC 358 member limits matter most on large US projects, where heavy built-up girders, box columns and cruciform columns are common. They are also where a fabricator's shop practice shows.

Rolled wide-flange members

Section 2.3.1 is short: rolled wide-flange members must meet the profile limits of the specific connection. Those limits sit in each chapter. For the reduced beam section, rolled beams go up to W1100 (W44) and 610 kg/m (408 lb/ft) with flanges up to 53 mm thick. For the welded unreinforced flange, welded web (WUF-W) and the bolted flange plate, beams stop at W920 (W36), 220 kg/m (150 lb/ft) and 25 mm (1 in.) flanges. The double-tee stops at W610 (W24) and 82 kg/m (55 lb/ft). Every chapter also sets a minimum clear span-to-depth ratio and refers width-to-thickness ratios back to AISC 341, explained in our width-to-thickness article.

Built-up I-shaped members

Section 2.3.2 lets a designer use built-up members when the rolled shape does not exist or does not fit. Two conditions apply. The member must be doubly symmetric and I-shaped, with flanges and webs whose width, depth and thickness are similar to a rolled shape that meets the connection's limits. And the web must be continuously connected to the flanges as Sections 2.3.2a and 2.3.2b require.

Built-up beams

Section 2.3.2a sets a zone at the beam end. From the end of the beam to at least one beam depth beyond the plastic hinge, the web and flanges are joined with complete-joint-penetration (CJP) groove welds plus a pair of reinforcing fillet welds, unless the chapter says otherwise. The fillets are at least the lesser of 8 mm (5/16 in.) and the web thickness. Beyond the zone, normal web-to-flange welds sized for shear transfer apply.

The reason is simple: the hinge region sees large cyclic strains, and a partial weld between web and flange could open under them. The extended end-plate chapter has its own rule in Section 6.3.1: within the beam depth or three flange widths of the end, whichever is less, the web-to-flange joint is either a CJP weld or a pair of fillets each 75 percent of the web thickness and at least 6 mm (1/4 in.).

For a fabricator this means the web-to-flange weld changes along the girder. Submerged arc fillets run the length; near each moment-connected end the joint is bevelled and welded full penetration, then ultrasonically tested as the inspection plan requires. The change point is a dimension on the shop drawing, and our Tekla drawings show it on every built-up moment beam.

Built-up columns

Section 2.3.2b covers four built-up column types. In all of them, internal forces between the plates must transfer through welds, and a CJP zone runs from 300 mm (12 in.) above the top beam flange to 300 mm (12 in.) below the bottom beam flange.

  • I-shaped columns. Elements meet AISC 341. In the zone, web and flanges are joined by CJP groove welds with a pair of reinforcing fillets, sized as for beams. SidePlate connections may use a pair of continuous fillets designed for the column shear instead.
  • Boxed wide-flange columns. A rolled wide flange with side plates added. The added flange plates have a width-to-thickness limit of 0.6 times the square root of E over Fy, measured with the clear distance between plates. In the zone, plates are joined by CJP welds; outside it, by continuous fillet or groove welds.
  • Built-up box columns. Four plates. The same flange plate limit applies, webs meet AISC 341, and the corners in the zone are CJP. Outside the zone the corner welds may be fillet or groove welds. ConXL connections may use partial-joint-penetration corner welds in the zone under Section 10.3.2.
  • Flanged cruciform columns. A continuous I-shape with tee sections welded to its web, built from rolled shapes or plate. In the zone the tee webs are CJP welded to the I-shape web with reinforcing fillets. Continuity plates follow the rules for wide-flange columns.

Column depth and width limits by connection

The connection chapters then limit column size. Some figures from AISC 358-22:

Connection Rolled column depth Box column width or depth
RBS (Section 5.3.2) up to W1000 (W40) up to 600 mm (24 in.)
WUF-W (Section 8.3.2) up to W920 (W36) up to 600 mm (24 in.)
BFP (Section 7.3.2) W920 (W36) with a structural slab, W360 (W14) without up to 600 mm (24 in.)
Extended end plates (Section 6.3.2) up to W920 (W36) not listed: wide flange, built-up I or cruciform only

Boxed wide-flange columns carry the 600 mm (24 in.) limit only when they take moment frames in both directions. Built-up wide-flange columns may be no deeper than the rolled limit, and cruciform columns no wider or deeper than it. In most chapters there is no limit on column weight and no extra flange thickness rule.

Column choice also feeds back into the connection. Several chapters limit how a beam meets the column, and every one in Chapters 5 to 8 asks for the beam to connect to the column flange, not the web. A frame that needs moment connections on both axes therefore points toward box, boxed or cruciform columns, or toward a proprietary connection designed for that case.

Hollow structural sections

Section 2.3.3 covers HSS members, which only some connections use. Their width-to-thickness ratios must meet AISC 341, plus any extra profile limit in the connection chapter. The ConXL connection uses concrete-filled 400 mm (16 in.) square HSS or built-up box columns; SidePlate and DuraFuse accept HSS or box columns in some configurations.

Slab isolation

Section 2.3.4 closes the section: where a connection requires it, the column and the connection elements at the column face are isolated from the concrete slab, so the slab does not restrain the beam's rotation. The RBS, WUF-W and slotted web are exempt. Extended end plates, BFP, CBB and double-tee in SMF need it, under conditions set in their chapters.

Why box and cruciform columns matter for US projects

Large US contractors meet these members on exactly the jobs where moment frames are hardest to fit: tall floor-to-floor heights in laboratories, long clear spans in data halls, and corner columns that take frames from two directions. A rolled W360 (W14) column may be too light, and a rolled W1000 (W40) column may be awkward in plan. A built-up section lets the Engineer of Record size flanges and web for the strong-column weak-beam check and the panel zone at the same time, rather than adding doubler plates later. The price of that freedom is welding: every built-up column in a moment frame carries a CJP zone at each floor, and every one of those welds must be planned, made and tested.

Box columns suit frames with moment connections on two axes, such as corner columns in a hospital or an office core, and they keep a clean square profile under fireproofing. Cruciform columns do the same job with open shapes that are easier to weld and inspect. Both are heavy welded members where the CJP zone, the NDT and the plate traceability decide the schedule. Our welded box columns and cruciform columns pages show how we build them; plate comes mainly from Vietnamese mills, with EN 10204 3.1 certificates and Charpy tests on request, and the CJP zones are welded to our AWS D1.8 procedures.

Proof from our plant and projects

This is the part of AISC 358 where a fabricator's shop shows most. Our plant builds welded box columns, cruciform columns and plate girders every week, and our box columns for the New Hope Dong Nai feed factory were welded, fitted with bolted connection plates and tested in our own shop. Plate comes mainly from Hòa Phát, Formosa Hà Tĩnh and POSCO mills in Vietnam, with Japanese, Korean, Indonesian or Thai plate where a specification calls for it, and every heat is traceable from the mill certificate to the member mark.

CJP zones at the beam levels are welded to AWS D1.8 qualified procedures and ultrasonically tested in house, with radiography through a partner where specified, and the reports are filed by column mark. The plant has been accredited under IAS AC472 since 2019 and is audited twice a year, which is the record a building official reviews when heavy seismic columns are made outside the US.

How we handle Section 2.3 on a job

When the Engineer of Record specifies built-up members in a moment frame, our engineers confirm that each profile matches a qualifying rolled shape, mark the CJP zones and the change in web-to-flange weld on the shop drawings, and add the CJP welds to the inspection plan. The plant is accredited under IAS AC472, the first and only in Vietnam. The US contractor, our customer, reviews and approves the drawings, and the design and any seal stay with the US engineer.

Read the companion pages for the rest of the picture: the AISC 341 and AISC 358 page, the AISC 341 landing, and the next article in the series on the probable maximum moment.

Quick answers

Can a built-up girder be used in a prequalified connection?

Yes. Section 2.3.2 accepts doubly symmetric built-up I-shapes whose flanges and webs have profiles similar to a rolled shape that meets the connection limits, with CJP web-to-flange welds near the hinge.

How far do the CJP welds run in a built-up beam?

Section 2.3.2a requires CJP groove welds with a pair of reinforcing fillets from the beam end to at least one beam depth beyond the plastic hinge, unless a chapter says otherwise. The fillets are the lesser of 8 mm (5/16 in.) and the web thickness.

What is the CJP zone in a built-up column?

From 300 mm (12 in.) above the top beam flange to 300 mm (12 in.) below the bottom beam flange, the plates of built-up I, boxed, box and cruciform columns are joined with CJP groove welds, with limited exceptions for SidePlate and ConXL.

Does World Steel fabricate box and cruciform columns?

Yes. We fabricate welded box columns and cruciform columns in our Vietnam plant, with CJP zones and NDT planned from the shop drawings, for the US contractor to approve.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.