Most fabricators now make bolt holes in plate the same way they cut the plate: on a CNC laser or plasma table, in one program, with the hole positions taken straight from the 3D model. It is fast and accurate. In a seismic moment connection, though, the hole is not just a place for a bolt. In several connections the beam flange or a connection plate is expected to carry its full yield force, or more, right at the line of holes, cycle after cycle. The edge of the hole is then a place where a crack can start. That is why AISC 358-22 regulates bolt hole fabrication chapter by chapter, and why the 2022 edition updated those rules across the standard.
What the 2022 edition changed
The preface lists "updated bolt-hole fabrication requirements" and "equations for determination of bolt hole diameter updated to reflect current AISC Specification provisions" among the changes applied to all connections. Two things follow. Each chapter now says plainly which hole-making processes it accepts. And the hole diameters used in the strength checks, such as net section and bearing, match the hole sizes of AISC 360-22, so the calculation and the shop agree.
Chapter by chapter
Bolted flange plate, Chapter 7
Section 7.4.4 requires standard holes in the beam flanges and standard or oversized holes in the flange plates, and requires holes in both to be made by drilling or by sub-punching and reaming. A user note warns that standard holes in the flange plate will likely force field modifications to absorb erection tolerances, so most designs use oversized holes in the plate. The plastic hinge of a BFP forms in the beam near the last bolt, so the flange holes sit in the most strained part of the beam.
Double-tee, Chapter 13
Section 13.4 asks for bolt holes in the T-stubs and the beam flanges to be drilled or sub-punched and reamed, for the same reason: the hinge forms near the end of the T-stub stems, past the last shear bolt.
Cast bolted bracket, Chapter 9
The CBB chapter requires holes to be drilled or sub-punched and reamed, and fixes the beam flange hole diameter for bolted brackets at 29 mm (1 1/8 in.), drilled. The bracket itself is a casting made to Appendix A, with its own quality program.
ConXL, Chapter 10
The ConXL chapter requires the bolt holes in its collar assemblies to be drilled.
Simpson Strong-Tie Strong Frame, Chapter 12
Section 12.7 turns the rule around for the yielding element. The reduced section of the Yield-Link must be cut by laser, plasma or water jet, with a maximum roughness of 6.3 μm (250 μin.) and smooth radii at every transition. The cut edge is engineered, so the process is specified.
Slotted web, Chapter 14
Section 14.6 allows the beam web slots to be made by thermal cutting or milling, with the end holes thermally cut or drilled, at a roughness not exceeding 25 μm (1,000 μin.). Gouges are repaired by grinding. The end holes are 27 mm (1 1/16 in.) in beams 600 mm (24 in.) deep or more, and 21 mm (13/16 in.) in shallower beams.
DuraFuse Frames, Chapter 15
Section 15.5 is the most open: holes in beam flanges and plates may be made by drilling, sub-punching and reaming, laser cutting, plasma cutting or water-jet cutting. Beam flanges and external continuity plates get standard holes; the top plates and fuse plate get oversized holes, with short slots where shown.
Extended end plates, RBS and WUF-W
The end-plate chapter does not set its own process; its holes follow the general rules of AISC 341 and AISC 360 for the seismic force-resisting system. The RBS and WUF-W are welded at the flanges, and their only holes are in the shear tab and web. For these, confirm the accepted process with the Engineer of Record and put it on the drawings, rather than assuming.
Why the rules differ
The pattern is consistent. Where a hole sits in a yielding beam flange or a plate that carries the full flange force, as in the BFP, double-tee and CBB, the standard asks for drilled or reamed holes, because the test programs behind the prequalification used them and because a thermally cut edge can carry a harder, rougher surface layer. Where the hole is in an element designed to stay elastic, or where the connection was tested with thermally cut holes, as in DuraFuse, other processes are allowed. Where the cut edge is itself the fuse, as in the Strong Frame Yield-Link, the process and finish are specified to make that fuse behave as tested.
The net-section check
The 2022 edition also added a common net-section rupture check to the BFP, CBB and double-tee chapters. For the BFP, Equation 7.5-1 requires Rt Fub Zb,net ≥ Ry Fyb Zb: the beam's expected tensile strength times the plastic modulus of the net section at the holes must reach the expected yield strength times the gross plastic modulus. Put simply, the beam must yield before it tears at the bolt line. A user note gives a short route: compute the net modulus with holes in both flanges, which yields a maximum hole diameter for the beam. Because the hole diameter in that check now follows AISC 360, an oversized hole drilled where a standard hole was designed can break the check.
Position, edge distance and erection fit
The process is only half of a good hole. The other half is where it is. A prequalified connection is designed with exact gage, pitch and edge distances, and several chapters bound them: Table 6.1 limits gage and pitch for each end-plate layout, and the BFP and double-tee chapters fix the number of bolts per row and the length of the bolt group. A hole that drifts toward an edge cuts the tearout strength the 2022 equations now sum bolt by bolt.
Erection fit pulls the other way. Columns are never perfectly plumb, and beams are never exactly the theoretical length, so a connection with standard holes on both sides leaves the ironworker no room. The standard deals with this connection by connection: oversized holes in BFP flange plates, shims up to 6 mm (1/4 in.) between plate and flange, finger shims at end plates within RCSC limits, and slotted holes in some shear tabs. The shop's job is to place every hole exactly where the model says, so the tolerance the design allows is left for the site and not used up in the plant. That is why we check hole positions on the first piece of each connection mark before the run continues, and record the check.
What this means for a shop like ours
Our Vietnam plant runs CNC laser machines that cut steel up to 100 mm thick and make holes in the same pass, which is ideal for base plates, gussets, stiffeners, continuity plates and most connection plates. For moment connection parts, we sort holes by the rule that governs them before release:
- drilled or reamed where the chapter requires it, such as BFP flange plates and beam flanges, double-tee T-stubs and beam flanges, and CBB holes;
- laser or plasma only where the chapter or the Engineer of Record allows it, with the cut-edge finish checked against the stated roughness;
- hole type, standard, oversized or slotted, marked on each part, because swapping them changes both the erection and the calculation.
The shop drawing carries the process note for each hole group, the CNC program is checked against the Tekla model, and the inspection record notes the process used. The plant is accredited under IAS AC472, and the steps are visible in our factory tour.
Proof from our plant and projects
Our plant runs CNC laser machines that cut and make holes in steel up to 100 mm thick, and the same Tekla model drives cutting, drilling and marking. That is an advantage only if the shop knows when not to use it, which is why every moment-connection part in our system carries its hole process from the chapter that governs it. Drilled holes go where AISC 358 asks for them; laser holes go only where it allows them.
The result shows on site. On large packages such as the 5,000 t Sunpro Steel mill, the erector's fit-up depends on hole accuracy across thousands of connections. The plant is accredited under IAS AC472 since 2019 and audited twice a year, and dimensional inspection results are kept with each connection mark.
What the US contractor should check
When reviewing shop drawings for a bolted moment frame, check that every hole group shows its size, type and process, that oversized holes appear only where the design allows them, and that faying surfaces carry the right paint mask. The US contractor, our customer, approves the drawings; the Engineer of Record's design governs. For the bolt side read the bolting requirements article, and for the seismic provisions read the AISC 341 landing.
Quick answers
Can bolt holes in a BFP connection be laser cut?
No. Section 7.4.4 requires holes in the beam flanges and flange plates to be drilled or sub-punched and reamed. The double-tee and cast bolted bracket chapters set the same rule for their holes.
Which AISC 358 connection allows laser-cut holes?
The DuraFuse Frames chapter, Section 15.5, allows holes in beam flanges and plates to be made by drilling, sub-punching and reaming, laser cutting, plasma cutting or water-jet cutting.
Why are drilled holes required in some connections?
In those connections the beam flange or plate yields or carries its full tension right at the bolt holes. A thermally cut hole can leave a hardened, rougher edge that may start a crack under cyclic strain, so the test evidence was built on drilled or reamed holes.
What is the net-section check?
For bolted flange connections the beam net section at the holes must carry the force the gross beam delivers when it yields: Rt Fu Zb,net is at least Ry Fy Zb. It limits hole diameter for a given beam.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors