Engineering and codes

Moment frame connections in the New Madrid seismic zone: AISC 358 for Memphis, St. Louis and the central US

Far from any plate boundary, the central Mississippi Valley still carries some of the highest seismic design values east of the Rockies. In the New Madrid seismic zone, soft soils and large industrial projects make the choice between ordinary, intermediate and special moment frames, and the AISC 358 connections that go with them, a real cost question.

· 6 min read · World Steel USA engineering team

In the winter of 1811 and 1812 three great earthquakes struck the central Mississippi Valley, strong enough to change the course of the river for a time and ring church bells on the East Coast. The faults that produced them, the New Madrid seismic zone, lie under the Missouri Bootheel, northeast Arkansas, west Tennessee and western Kentucky. There is no plate boundary here, and large earthquakes are rare. But the old, cold crust of the central US carries shaking far, and the deep, soft soils of the Mississippi embayment amplify it. The result is that Memphis, St. Louis, Jonesboro, Paducah and much of the region have seismic design values that surprise engineers from elsewhere, and steel moment frames there often fall under AISC 341 and AISC 358.

Where the hazard is

The seismic regions guide maps the central US. In short:

Mississippi and Indiana see effects near their borders. On the East Coast, the Charleston area of South Carolina carries similar design values for similar reasons; see Charleston seismic.

Why soil decides the category

ASCE 7 assigns the Seismic Design Category from the mapped ground motion, the site class and the risk category. In the embayment, deep soft soils often mean site class D or E, which can raise the design spectral values enough to move a site from SDC C to D. Two buildings across the river from each other, or one on fill and one on rock, can end up in different categories. A geotechnical report early in design is the only way to know.

The system choice

Steel buildings in the region usually choose among four options.

  • No seismic detailing, R = 3: allowed in SDC B and C. The design force is higher, but members and connections follow AISC 360 alone. Common for light industrial and warehouse buildings in SDC B and C.
  • Ordinary moment frame (OMF): AISC 341 applies, with light detailing and no AISC 358 requirement for the connections, but height and category limits apply in SDC D.
  • Intermediate moment frame (IMF): connections must be prequalified under AISC 358 or tested, at a story drift angle of 0.02 rad, with lighter member and bracing rules than SMF.
  • Special moment frame (SMF): the full AISC 358 regime at 0.04 rad, the lowest design force and the fewest height limits.

Our AISC 341 series article on OMF, IMF and STMF explains the systems. In SDC D, the IMF is often the sweet spot for low- and mid-rise buildings within its ASCE 7 limits: the design force is moderate, the connection list of AISC 358 is available, and most connections are less demanding to brace and detail than in an SMF.

AISC 358 connections that suit IMF

Most AISC 358 connections are prequalified for IMF, with lighter span-to-depth limits than SMF in several chapters:

  • RBS and WUF-W: clear span of 5 beam depths in IMF instead of 7. The RBS in IMF may use a bolted slip-critical web connection instead of a welded web, per Section 5.5.
  • Extended end plates: clear span of 5 depths in IMF. A fully bolted joint with shop welds only, popular for low-rise offices, schools and industrial mezzanines.
  • Bolted flange plate: clear span of 7 depths in IMF instead of 9.
  • Double-tee and CBB: 9 depths in both systems.
  • Slotted web: SMF only.

Where steel is erected by crews more used to bolted metal building work than to field CJP welding, end plates and BFP connections are a common fit.

What gets built there

The central US is one of the country's fastest-growing industrial regions. Memphis is a national distribution hub; Tennessee, Kentucky and Arkansas host large battery, automotive and advanced manufacturing plants; and data centers are spreading along the region's power and fiber routes. Many of these are large single-storey buildings with braced frames or ordinary moment frames, but their office blocks, mezzanines, equipment platforms and multi-storey support buildings often use IMF or SMF moment frames with AISC 358 connections. Hospitals and schools, with higher risk categories, are more likely to reach SDC D. Public buildings such as fire stations and emergency centers in the region often carry Risk Category IV, which raises the importance factor and makes intermediate or special moment frames, with AISC 358 connections, far more likely.

Why central US contractors work with us

The industrial projects of the central US are large and fast, which matches how we work. Our flagship packages include 5,000 t for the Sunpro Steel mill, 2,500 t for CPV Food and 2,000 t for the M&D Warehouse in Thailand, and our end-plate rigid frames and heavy columns are the members an IMF or OMF in an industrial building uses. For office blocks and support buildings, our multi-storey work ranges from feed factory process buildings to schools in earthquake-prone countries and the FPI Barracks in Guam.

On a seismic package, we check every frame against its system and AISC 358 chapter, show the limits and protected zones on the drawings, and give the Engineer of Record a calculation package in the format of our sample Design Report. Repeat customers such as Haid Group come back to us for their next plant. Inspection items are agreed with the customer in a project inspection and test plan, and customers follow each shipment in real time in PEB Studio.

For a contractor, that combination of scale, documentation and partnership is the practical answer to the region's question: how to build seismic steel on an industrial schedule.

Planning checklist for a central US moment frame

  • Get the geotechnical report early: site class can move the Seismic Design Category.

  • Compare R = 3 design, OMF, IMF and SMF on steel weight, connection cost and height limits before fixing the system.

  • If the frame is an IMF or SMF, pick an AISC 358 connection that suits the erector's crews, bolted or welded.

  • Confirm how the building official accepts an overseas fabricator, and agree the inspection hold points.

  • Check combined hazards: in Kentucky, Arkansas and Tennessee, tornado, ice and snow loads also act on the same frame.

  • Plan the steel route early: Gulf port, river or rail, and the piece sizes each allows, so column trees or long girders do not stall at the last mile.

These steps take little time at the start of a project and avoid the most common redesigns we see when a seismic category changes late.

Supplying a New Madrid moment frame

For contractors in the central US, a package from our plant in Vietnam reaches the region through Gulf ports such as Houston, New Orleans and Mobile, or through West Coast ports by rail. What matters for a seismic frame is that the quality record travels with the steel:

  • IAS AC472 accreditation, the first and only in Vietnam, audited twice a year since 2019, which the building official can review for fabricator approval;
  • AWS D1.8 qualified procedures and welders for demand-critical shop welds, with UT reports;
  • heat-number traceability, EN 10204 3.1 certificates and Charpy results on request;
  • Tekla shop drawings with each AISC 358 limit, protected zone and bracing point, at no extra cost;
  • remote inspector access and plant visits at agreed hold points.

Our capacity is 2,500 t per month, proven on jobs like the 5,000 t Sunpro Steel mill and multi-storey industrial frames such as the 1,500 t first phase of the Tongwei Tien Giang feed factory. We also invite central US contractors to partner on repeat work through our contractor partnership program.

Erection is the US contractor's scope, and the Engineer of Record's design governs. For the seismic provisions read the AISC 341 landing, and for the connections themselves start with what AISC 358 covers.

Quick answers

Where is the New Madrid seismic zone?

In the central Mississippi Valley, centered near the Missouri Bootheel, northeast Arkansas, west Tennessee and western Kentucky, with southern Illinois nearby. Memphis and St. Louis are the largest cities within its influence.

Do buildings in Memphis need AISC 341?

Many do. Soft Mississippi Valley soils amplify shaking, so many Memphis-area sites reach Seismic Design Category D, where AISC 341 applies to the seismic force-resisting system. The category depends on the site, soil and risk category.

Is an intermediate moment frame enough in the New Madrid zone?

Often, within the height limits of ASCE 7. IMF connections must still be prequalified under AISC 358 or tested, but IMF rules for bracing, members and drift are lighter than SMF.

Can a building there avoid seismic detailing?

In SDC B or C a steel building may use R = 3 without AISC 341 detailing, at a higher design force. In SDC D and above, the seismic provisions apply.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.