Before 1994 the typical US moment connection welded the beam flanges to the column and bolted the web to a shear tab. Northridge showed how badly that joint could crack. The industry's response took two paths: move the hinge away from the face, as the reduced beam section and plate connections do, or make the joint at the face strong and smooth enough to yield safely right there. The WUF-W connection, welded unreinforced flange, welded web, takes the second path. Chapter 8 of AISC 358-22 sets its rules. It keeps the beam whole and puts the burden on weld quality, a carefully shaped weld access hole and a heavy shear plate.
How the WUF-W works
Section 8.1 describes the mechanism: inelastic rotation develops mainly by yielding of the beam next to the face of the column. Fracture is controlled by detailing the flange welds, the web weld and the shape and finish of the weld access holes. There are no reinforcing plates and no cuts. The beam reaches its full plastic moment at the column face, so the welds there see the highest demand of any welded connection.
Section 8.2 prequalifies the WUF-W for SMF and IMF and exempts it from the slab isolation rule.
Beam limits
Section 8.3.1 is tighter than the RBS:
- rolled or built-up I-shapes meeting Section 2.3;
- depth up to W920 (W36);
- weight up to 220 kg/m (150 lb/ft);
- flange thickness up to 25 mm (1 in.);
- clear span-to-depth ratio of at least 7 for SMF and 5 for IMF;
- width-to-thickness ratios to AISC 341.
Lateral bracing: supplemental bracing at top and bottom flanges sits between d and 1.5d from the column face, with nothing attached within d of the face. Where a composite slab with welded shear connectors at no more than 300 mm (12 in.) spacing runs between protected zones, the supplemental bracing is not needed.
The protected zone runs from the column face to one beam depth from it.
Column limits
Section 8.3.2 accepts rolled and built-up columns of Section 2.3, connected at the column flange. Rolled columns go up to W920 (W36); built-up box columns and boxed wide-flange columns in orthogonal frames up to 600 mm (24 in.) wide or deep. No weight limit and no extra flange thickness rule apply.
The flange welds and the access hole
Section 8.4 requires CJP groove welds between beam and column flanges, meeting the AISC 341 rules for demand-critical welds. The weld access hole must follow AWS D1.8 clause 6.11.1.2, with its quality rules, not the standard AISC 360 hole used by the RBS.
The D1.8 hole is longer and has a carefully shaped tail that reduces the strain concentration where the flange meets the web, the point where many Northridge cracks started. It must be cut and finished to a set profile and smoothness and checked. Our AWS D1.8 series article on weld access hole quality shows the geometry and inspection.
Chapter 3's rules apply: bottom flange backing removed, backgouged and reinforced; top flange backing either removed or fillet welded to the column; weld tabs removed and finished. See the welding requirements article.
The web connection
Section 8.5 and Figures 8.2 and 8.3 make the web the most detailed part of the connection.
- A single-plate shear connection at least as thick as the beam web. Its height overlaps the weld access hole by at least 6 mm (1/4 in.) and at most 13 mm (1/2 in.) at top and bottom, and it extends at least 50 mm (2 in.) beyond the end of the access hole.
- The plate is welded to the column flange for a design shear strength of at least 0.6 Ry Fyp hp tp, the shear yield strength of the plate.
- The plate is fillet welded to the beam web, with fillet size equal to the plate thickness minus 2 mm (1/16 in.), running along the vertical edge and the sloped top and bottom edges. The sloped fillets stop at least 13 mm (1/2 in.) and at most 25 mm (1 in.) from the edge of the access hole.
- Erection bolts in standard holes or horizontal short slots are allowed.
- A CJP groove weld joins the beam web to the column flange over the full length between access holes, as a demand-critical weld. Weld tabs are not required; if used they are removed to Section 3.4. Without tabs, cascaded weld ends at up to 45° are allowed and need no NDT.
The plate does two jobs. It carries shear during erection and in service, and it stiffens the web near the access holes, where the CJP web weld would otherwise end at a stress concentration.
The design procedure
Section 8.6 is short because the hinge is at the face.
- Compute Mpr with Ze = Zb and Cpr = 1.4. A user note explains the higher value: test data show strong strain hardening.
- Take the hinge at the column face: Sh = 0.
- Compute Vh per Section 2.4.4.
- Compute Mf per Section 2.4.5. With Sh = 0, Mf = Mpr.
- Check beam shear per AISC 360 and Section 2.5.
- Check continuity plates per Section 2.6.
- Check the panel zone per Section 2.7.
- Check the column-beam moment ratio per Section 2.8.
The high Cpr means the column side is checked for a larger moment than with an RBS of the same beam, which often drives heavier columns, thicker continuity plates or doubler plates. That is the main design cost of the WUF-W.
WUF-W against RBS
Both are welded, non-proprietary and common in US practice. The choice usually turns on a few points.
- Beam size: the RBS now reaches W1100 (W44) and heavy flanges; the WUF-W stops at W920 (W36), 220 kg/m (150 lb/ft) and 25 mm (1 in.) flanges.
- Stiffness and strength: the WUF-W keeps the full beam, which helps drift-controlled frames; the RBS gives up some stiffness.
- Column demand: the WUF-W delivers a larger moment to the column, so columns and panel zones may grow.
- Weld quality: the WUF-W depends more on perfect field welds and access holes, since there is no fuse away from the face.
- Bracing: both need supplemental bracing or a qualifying composite slab.
The WUF-W suits moderate spans with relatively shallow beams, and frames where drift controls. The RBS suits long spans and heavy beams.
Field welding conditions
Because the WUF-W puts the hinge at the face, the field welds must be as good as shop welds. That shapes the site plan. The bottom flange is welded in the flat position from above through the access hole, then the backing is removed and the root backgouged and reinforced overhead. Preheat and interpass temperatures follow the WPS, which on thick columns in cold, wet weather in Anchorage or Seattle may need tenting and heating. Each CJP weld is ultrasonically tested as the special inspection plan requires, and repairs are rewelded and retested. Good shop preparation, accurate bevels, clean access holes and correct root openings, shortens each of those steps.
Shop and site split
Most WUF-W beam-to-column welds are made in the field, by the US contractor's erector, because the beam is welded to a column already standing. The shop work is still substantial:
- beam ends cut to length, bevelled for the flange CJP welds and for the web CJP weld;
- D1.8 access holes cut and finished to profile and checked;
- shear plates shop welded to the column flange, with the plate size, overlap and edge distances of Figure 8.3;
- continuity plates and doublers in the column, welded to Chapter 3 and AWS D1.8;
- erection bolt holes and markings for the field welds, and the protected zone marked.
Where a project uses column-tree construction, with short beam stubs shop welded to the column and spliced to the beam in the field outside the protected zone, the WUF-W joints themselves become shop welds. That moves the most demanding welding into the plant, where position, preheat and testing are easier to control, at the cost of larger pieces to ship.
Proof from our plant and projects
The WUF-W rewards precise shop preparation. Our CNC cutting gives repeatable bevels and D1.8 weld access holes, and our shop welds of continuity plates, doublers and shear plates are made by welders qualified to our AWS D1.8 procedures and tested by in-house ultrasonic testing, with reports filed by column mark. Where a project uses column trees, the demand-critical flange and web welds themselves are made flat in our shop.
We fabricate heavy multi-storey frames for clients such as Haid Group, a repeat customer, and Tongwei, whose Tien Giang feed factory took 1,500 t in its first phase. The plant is accredited under IAS AC472, audited twice a year since 2019, and the owner's inspector can visit or follow the work remotely. Protected zone marking on the steel is available on request.
How World Steel builds WUF-W frames
Our engineers check each joint against Section 8.3, detail the D1.8 access hole and the shear plate per Figures 8.2 and 8.3 in Tekla, and plan the shop and field welds with the US contractor. Shop welds are made to our AWS D1.8 procedures by qualified welders, with ultrasonic testing of CJP welds as the inspection plan requires; our UT of demand-critical welds article explains the method. The plant in Vietnam is accredited under IAS AC472.
WUF-W frames are common in Washington seismic steel structures, Oregon and California offices and schools of moderate span. Field welding and erection are the US contractor's scope; the Engineer of Record's design governs. For the seismic provisions read the AISC 341 landing.
Quick answers
What does WUF-W stand for?
Welded unreinforced flange, welded web. Both beam flanges and the beam web are joined to the column flange with demand-critical CJP groove welds, with no cover plates or flange cuts, and a heavy shear plate welded to the web.
How large can a WUF-W beam be?
Section 8.3.1 limits rolled beams to W920 (W36), 220 kg/m (150 lb/ft) and 25 mm (1 in.) flanges, with a clear span-to-depth ratio of at least 7 in SMF and 5 in IMF.
Why is Cpr 1.4 for the WUF-W?
Test data show a high degree of strain hardening in WUF-W specimens, so Section 8.6 sets Cpr at 1.4 instead of the usual value capped at 1.2, with the hinge taken at the face of the column.
Which weld access hole does the WUF-W use?
Section 8.4 requires the access hole geometry of AWS D1.8 clause 6.11.1.2, with its quality requirements, rather than the standard AISC 360 hole.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors


