Battery and EV plants: gigafactory halls, released block by block

A battery gigafactory or an EV assembly plant can put hundreds of thousands of square meters under one roof, and the owner wants it closed in fast. That makes it a tonnage and repetition job first: thousands of identical frames, trusses and service supports, made to one model and shipped in the order the halls go up. It is the work our plant is built for, at 2,500 metric tons a month and up to 5,000 t on one job.

Capacity
2,500 t (about 2,750 short tons) a month
Process plant reference
CPV Food, about 2,500 t
Hung loads
Conveyors, ducts and roof air handling
CPV Food Processing Factory, structural steel by World Steel World Steel reference 2,500 t of structural steel CPV Food Processing Factory Large process plant · Dong Nai Province, Vietnam · 2020
Battery and EV plants at a glanceTypical ranges · not design values
Typical spans
24 to 40 m (80 to 130 ft) bays, repeated across very large multi-span halls
Heights
Clear heights of 10 to 20 m (33 to 65 ft) for coating lines, storage and conveyors
Structural systems
Multi-span frames or trusses on braced columns, interstitial platforms, mezzanines
Loads that size the steel
Hung conveyors and MEP, roof air handling, solvent recovery plant, rooftop solar
Codes and standards
AISC 360, ASCE 7-22, IBC, NFPA rules and the owner’s insurer requirements
Coating and exposure
Dry rooms and clean areas inside; galvanized or coated steel in utility yards

Gigafactory block plan

A battery plant, block by block, and the steel each block needs

Cell plants follow the process from electrode to finished pack. Each block has its own loads and rules, so we model, detail and ship it as its own sequence. Diagram of a typical layout, not a design.

  1. Electrode

    Mixing, coating, drying and calendering lines.

    Steel: Tall halls, heavy hung ducts, solvent recovery plant
  2. Cell assembly

    Stacking or winding, filling and sealing in dry rooms.

    Steel: Support steel for dry room envelopes and services
  3. Formation and aging

    Racks of cells charged and held before testing.

    Steel: Fire-separated areas, rated steel where required
  4. Module and pack

    Cells assembled into modules and packs.

    Steel: Clear-span halls, conveyors and hoists
  5. Warehouse and dispatch

    Materials in, finished packs out.

    Steel: High-bay frames and dock canopies

EV assembly plants

Same halls, heavier roofs

Body shop

Robots and conveyors hung from the roof steel.

Paint shop

Heavy air handling and ovens, often several levels.

General assembly

Overhead carriers along the whole line.

What makes this project type different

What sizes the steel in battery and ev plants

A cell plant follows the process. Electrode lines mix, coat, dry and calender the electrodes, cell assembly runs in dry rooms held at very low humidity, and formation and aging fill large areas with racks of charging cells before modules and packs are assembled. An EV plant adds a body shop, a paint shop and general assembly, where conveyors and carriers hang from the roof steel along the whole line.

For the steel, that means very large halls with heavy and changing hung loads, roofs that carry air handling, solvent recovery and often solar, and areas where the owner and the insurer set fire separation and construction rules. Owners build in phases and want production started early, so the steel is detailed, fabricated and shipped block by block.

Hung conveyors and lines

Overhead conveyors, carriers and process lines hang from the roof steel, with point loads set by the line supplier.

Dry rooms

Low-humidity rooms inside the hall need support steel for their envelopes and services, and few penetrations.

Formation and fire separation

Formation and aging areas bring fire separation, ratings and insurer rules into the frame design.

Roof and yard plant

Air handling, solvent recovery and exhaust systems are heavy and often sit on the roof or in yards beside it.

Repetition at scale

Hundreds of identical bays reward weight per square meter savings and batch fabrication.

Phased expansion

Plants are built block by block, so end frames and utilities are designed for the next block from day one.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Battery and EV plants
StructureTypical systemWhat we fabricate
Production hallsMulti-span frames or long-span trusses on braced columnsFrames, trusses, columns, bracing, purlins and girts
Conveyor and line supportHung or floor-mounted support steel along the linesHanger steel, runway beams, support frames
Dry rooms and clean areasSupport steel for room envelopes and servicesFraming, service supports, access platforms
Roof and yard plantDunnage, screens and equipment structuresDunnage steel, platforms, pipe supports
Warehouses and docksClear-span storage with dock canopiesFrames, canopies, dock steel
Offices, labs and linksMulti-story frames and covered link bridgesColumns, floor beams, link bridges, stairs

Our advice before you bid

Decisions that save steel, time and rework

  • Get the line supplier’s hung loads early

    Conveyor, carrier and process line loads decide the roof steel. Ask for them, with hanger positions, before the frame is sized.

  • Settle fire separation with the insurer

    Formation, aging and storage areas may need ratings and walls the code alone would not ask for. Confirm them before steel is sized.

  • Compare bays on weight per square meter

    One kilogram saved in a bay is saved hundreds of times. We price bay spacing and frame type options for your layout.

  • Release block by block

    Each production block gets its own model area, drawings and shipments, so the first block can be fitted out early.

  • Design the end frames for the next block

    Expansion end walls and spare roof capacity cost little now and avoid cutting steel in a running plant.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Large process plant · Dong Nai Province, Vietnam · 2020

CPV Food Processing Factory

2,500 tabout 2,750 short tons

Steel structure designed, fabricated and supplied by World Steel.

Repeated long-span halls · Thailand · 2024

M&D project, Thailand

2,000 tabout 2,200 short tons

Steel structure designed, fabricated and supplied by World Steel.

Heavy industry · Can Tho City, Vietnam · 2024 · our largest single job

Sunpro Steel Factory

5,000 tabout 5,500 short tons

Steel structure designed, fabricated and supplied by World Steel.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Operator checking web and flange plates set in blue H-beam assembly jigs Photo
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Gray members stacked and strapped together on a packing rack Photo
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Batch production

Identical frames run in batches at 2,500 t a month, which keeps quality even and shipping steady.

Shipped by block

Containers and breakbulk loads packed by production block and erection sequence.

Visible to your team

PEB Studio shows each block from cutting to packing in real time.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Battery and EV plants: questions we hear

Can World Steel supply the steel for a battery gigafactory?

Yes. Production halls, conveyor and line support steel, dry room support framing, roof and yard plant steel, warehouses and office blocks are structural steel packages we fabricate in our plant in Vietnam, at up to 2,500 metric tons a month.

How large a job can you take on?

Our largest single job used about 5,000 metric tons (5,500 short tons) of steel. A gigafactory is usually split into blocks, and each block is modeled, fabricated and shipped as its own sequence.

Who sets the fire separation for formation areas?

The owner, the code official and the owner’s insurer, through the design team. Your Engineer of Record sizes the steel and its fire protection; we prepare the steel for the specified product.

Do you supply the dry rooms or the conveyors?

No. Dry room envelopes, conveyors and process lines are other suppliers. We fabricate the steel that carries them, to the loads and hanger positions they provide.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.