Hospitals and healthcare: steel frames that stay open after the storm

A hospital is the building a town needs most on the day after a hurricane or an earthquake, so it is designed to a higher standard than its neighbors. Its floors carry imaging rooms and operating suites, and the space above every ceiling is full of ducts and medical gas. We fabricate those frames at 2,500 metric tons a month, from our own plant in Vietnam.

Risk category
Usually IV for hospitals with surgery or emergency care
Healthcare reference
Kosrae Hospital, about 200 t galvanized
Designed to
IBC, ASCE 7-22, AISC 360 and AISC 341
World Steel reference 200 t of structural steel Kosrae Hospital Hospital · Kosrae, Federated States of Micronesia
Hospitals and healthcare at a glanceTypical ranges · not design values
Typical spans
Floor bays of 9 to 12 m (30 to 40 ft), planned around patient rooms and imaging suites
Heights
Low and mid-rise, with tall floor-to-floor heights of 4.5 to 5.5 m (15 to 18 ft)
Structural systems
Composite floors, braced or moment frames, rooftop mechanical dunnage
Loads that size the steel
Essential-facility wind and seismic loads, floor vibration, imaging and equipment loads
Codes and standards
IBC, ASCE 7-22, AISC 360, AISC 341, AISC Design Guide 11, FGI Guidelines (by the design team)
Coating and exposure
Interior, under the fire protection the rated assemblies list; galvanized for coastal and island sites

Why a hospital frame is different

Risk Category IV, floor by floor

The IBC sorts buildings into four risk categories. A hospital with surgery or emergency care sits on the top step, and every floor inside it asks something specific of the steel. Your Engineer of Record sets the category and the criteria; this is the orientation we work from.

I

Low hazard to people

Barns, minor storage sheds

II

Most buildings

Offices, warehouses, stores, factories

III

Large numbers of people

Large assembly halls, many schools

IV

Essential facilities

Hospitals with surgery or emergency care, fire stations, emergency centers

Risk Category IV raises the seismic and snow importance factors and often the seismic design category, which brings AISC 341 systems and AWS D1.8 demand-critical welds into the frame.

Hospital chartWhat each floor asks of the steel

Roof

Air handlers, chillers, exhaust fans and screens

Steel: Dunnage frames, screens, access platforms

Patient floors

Repeating rooms, corridors and nurse stations

Steel: Composite beams on a regular grid

Surgery and imaging

Operating rooms, MRI and CT, the strictest vibration criteria

Steel: Deeper or closer beams, equipment supports

Interstitial space

Ducts, medical gas, sprinklers and cable trays above every ceiling

Steel: Web openings, hanger points, trapeze steel

Ground floor

Emergency department, lobby, ambulance bay

Steel: Transfer girders, canopies, link bridges

Healthcare and multi-story frames from our plant

What makes this project type different

What sizes the steel in hospitals and healthcare

Under the IBC, a hospital with surgery or emergency treatment is a Risk Category IV building, like a fire station or an emergency operations center. ASCE 7-22 raises its seismic and snow loads, and its seismic design category is often higher than a commercial building on the same street, so the lateral system, the connections and the inspection plan are all chosen with that in mind. The Engineer of Record sets the category and the loads; we fabricate and document the steel to them.

Healthcare floors are also judged by how still they stand. Operating rooms, imaging suites and laboratories set floor vibration criteria that a steel floor meets through beam depth, spacing and mass, checked by the design team to AISC Design Guide 11. The same beams must leave room for ducts, medical gas and plumbing above the ceiling, which is why web openings, hangers and dunnage are coordinated in one Tekla model before any steel is cut.

Risk Category IV

Higher importance factors for seismic and snow, and often a higher seismic design category than ordinary buildings.

Floor vibration

Operating rooms, imaging and labs set vibration criteria that drive beam depth and spacing, not strength alone.

Services above the ceiling

Ducts, medical gas, sprinklers and cable trays need web openings and hanger points planned in the model.

Heavy medical equipment

Imaging and surgical equipment bring concentrated floor loads and ceiling-hung supports from the equipment maker.

Fire-rated frames

Rated columns and beams are prepared for the listed fire protection the assemblies call for.

Phased additions

Many hospitals grow wing by wing next to an operating building, so steel is sequenced for tight, occupied sites.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Hospitals and healthcare
StructureTypical systemWhat we fabricate
ColumnsRolled or built-up columns spliced every two or three floorsColumns, splices, base plates, embeds layout
FloorsComposite beams and girders on metal deck, sized for vibrationBeams, girders, web openings, deck support angles
Lateral systemBraced frames or moment frames to AISC 341 where the seismic category requiresBraces, gussets, moment frame members to AWS D1.8
Rooftop plantDunnage and screens for air handlers, chillers and exhaustDunnage frames, screen walls, access platforms
Canopies and linksAmbulance canopies, entrance covers and link bridgesCanopy frames, link bridge steel, stairs

Our advice before you bid

Decisions that save steel, time and rework

  • Lock the risk category and seismic category first

    They set the lateral system, the welding requirements and the special inspections. Changing them after detailing redraws the frame.

  • Agree the vibration criteria room by room

    Get the criteria for operating rooms, imaging and labs from the equipment makers and the owner before beams are sized.

  • Coordinate penetrations in the model

    Web openings for ducts and pipes are cheap in the shop and expensive on site. We place them from the MEP model.

  • Plan for the next wing

    Hospitals rarely stop growing. Columns and connections sized for a future floor or wing avoid steel work next to patients later.

  • Sequence around the live hospital

    On an occupied campus, steel is shipped and erected in small tiers that fit the crane and the hospital’s daily operations.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Hospital · Kosrae, Federated States of Micronesia

Kosrae Hospital

200 tabout 200 short tons

Steel structure designed, fabricated and supplied by World Steel.

Multi-story hospital · Vietnam · 2022

Tien Giang General Hospital

Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.

Medical college · Philippines · 2023

3-Storey College of Medicine

Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Fitter comparing a built-up beam with its shop drawing Photo
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Quality inspector taking dimensions on a finished steel member Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Healthcare already built

A hospital frame of about 200 t, galvanized and shipped to a remote island, and a multi-story general hospital in Vietnam.

Seismic welding in house

AWS D1.8-qualified procedures and welders for the demand-critical welds of a Risk Category IV frame.

2,500 t a month

Capacity for a hospital tower or a campus program without queuing behind other work.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Hospitals and healthcare: questions we hear

Has World Steel supplied steel for hospitals?

Yes. Kosrae Hospital in the Federated States of Micronesia used about 200 metric tons of hot-dip galvanized World Steel structural steel, and Tien Giang General Hospital in Vietnam is a multi-story hospital framed with our steel.

Can you work to Risk Category IV?

Yes. Your Engineer of Record sets the risk category and the design loads. We fabricate, weld and document the frame to them, including AISC 341 systems and AWS D1.8 demand-critical welds where the seismic category calls for them.

Who checks floor vibration?

Your Engineer of Record, using AISC Design Guide 11 and the criteria from the owner and the equipment makers. If design optimization is in our scope, we propose beam sizes and spacing for that check.

Do you work on California hospitals?

California hospital structures are reviewed by HCAI, the state agency that took over from OSHPD. The design and approval sit with the project team and its Engineer of Record; we fabricate and document the steel to the approved drawings and the inspection program.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.