Hospital · Kosrae, Federated States of Micronesia
Kosrae Hospital
200 tabout 200 short tons
Steel structure designed, fabricated and supplied by World Steel.
Why a hospital frame is different
The IBC sorts buildings into four risk categories. A hospital with surgery or emergency care sits on the top step, and every floor inside it asks something specific of the steel. Your Engineer of Record sets the category and the criteria; this is the orientation we work from.
Barns, minor storage sheds
Offices, warehouses, stores, factories
Large assembly halls, many schools
Hospitals with surgery or emergency care, fire stations, emergency centers
Risk Category IV raises the seismic and snow importance factors and often the seismic design category, which brings AISC 341 systems and AWS D1.8 demand-critical welds into the frame.
Air handlers, chillers, exhaust fans and screens
Steel: Dunnage frames, screens, access platformsRepeating rooms, corridors and nurse stations
Steel: Composite beams on a regular gridOperating rooms, MRI and CT, the strictest vibration criteria
Steel: Deeper or closer beams, equipment supportsDucts, medical gas, sprinklers and cable trays above every ceiling
Steel: Web openings, hanger points, trapeze steelEmergency department, lobby, ambulance bay
Steel: Transfer girders, canopies, link bridgesAbout 200 t of hot-dip galvanized steel, designed, fabricated and shipped to a Pacific island
A multi-story general hospital in Vietnam, completed in 2022
Classrooms, labs and lecture halls on three floors, Philippines, 2023
An office building for a pharmaceutical and medical equipment company
What makes this project type different
Under the IBC, a hospital with surgery or emergency treatment is a Risk Category IV building, like a fire station or an emergency operations center. ASCE 7-22 raises its seismic and snow loads, and its seismic design category is often higher than a commercial building on the same street, so the lateral system, the connections and the inspection plan are all chosen with that in mind. The Engineer of Record sets the category and the loads; we fabricate and document the steel to them.
Healthcare floors are also judged by how still they stand. Operating rooms, imaging suites and laboratories set floor vibration criteria that a steel floor meets through beam depth, spacing and mass, checked by the design team to AISC Design Guide 11. The same beams must leave room for ducts, medical gas and plumbing above the ceiling, which is why web openings, hangers and dunnage are coordinated in one Tekla model before any steel is cut.
Higher importance factors for seismic and snow, and often a higher seismic design category than ordinary buildings.
Operating rooms, imaging and labs set vibration criteria that drive beam depth and spacing, not strength alone.
Ducts, medical gas, sprinklers and cable trays need web openings and hanger points planned in the model.
Imaging and surgical equipment bring concentrated floor loads and ceiling-hung supports from the equipment maker.
Rated columns and beams are prepared for the listed fire protection the assemblies call for.
Many hospitals grow wing by wing next to an operating building, so steel is sequenced for tight, occupied sites.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Columns | Rolled or built-up columns spliced every two or three floors | Columns, splices, base plates, embeds layout |
| Floors | Composite beams and girders on metal deck, sized for vibration | Beams, girders, web openings, deck support angles |
| Lateral system | Braced frames or moment frames to AISC 341 where the seismic category requires | Braces, gussets, moment frame members to AWS D1.8 |
| Rooftop plant | Dunnage and screens for air handlers, chillers and exhaust | Dunnage frames, screen walls, access platforms |
| Canopies and links | Ambulance canopies, entrance covers and link bridges | Canopy frames, link bridge steel, stairs |
Our advice before you bid
They set the lateral system, the welding requirements and the special inspections. Changing them after detailing redraws the frame.
Get the criteria for operating rooms, imaging and labs from the equipment makers and the owner before beams are sized.
Web openings for ducts and pipes are cheap in the shop and expensive on site. We place them from the MEP model.
Hospitals rarely stop growing. Columns and connections sized for a future floor or wing avoid steel work next to patients later.
On an occupied campus, steel is shipped and erected in small tiers that fit the crane and the hospital’s daily operations.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Hospital · Kosrae, Federated States of Micronesia
200 tabout 200 short tons
Steel structure designed, fabricated and supplied by World Steel.
Multi-story hospital · Vietnam · 2022
Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.
Medical college · Philippines · 2023
Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Healthcare already built
A hospital frame of about 200 t, galvanized and shipped to a remote island, and a multi-story general hospital in Vietnam.
Seismic welding in house
AWS D1.8-qualified procedures and welders for the demand-critical welds of a Risk Category IV frame.
2,500 t a month
Capacity for a hospital tower or a campus program without queuing behind other work.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
Yes. Kosrae Hospital in the Federated States of Micronesia used about 200 metric tons of hot-dip galvanized World Steel structural steel, and Tien Giang General Hospital in Vietnam is a multi-story hospital framed with our steel.
Yes. Your Engineer of Record sets the risk category and the design loads. We fabricate, weld and document the frame to them, including AISC 341 systems and AWS D1.8 demand-critical welds where the seismic category calls for them.
Your Engineer of Record, using AISC Design Guide 11 and the criteria from the owner and the equipment makers. If design optimization is in our scope, we propose beam sizes and spacing for that check.
California hospital structures are reviewed by HCAI, the state agency that took over from OSHPD. The design and approval sit with the project team and its Engineer of Record; we fabricate and document the steel to the approved drawings and the inspection program.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.