RBS flange cut fabrication: thermal cutting, roughness, tolerances and gouge repair

The reduced beam section is designed as a fuse, so the shape and finish of the cut decide how the fuse behaves. Section 5.6 of AISC 358-22 sets how an RBS flange cut is made, measured and repaired. Here is what that looks like on the shop floor and in the inspection record.

· 7 min read · World Steel USA engineering team

The reduced beam section is a fuse. In a strong earthquake the steel in the cut region yields in tension and compression through many cycles, and the cut edge is the most strained surface in the beam. A sharp notch, a rough drag line or an abrupt change of width at that edge can start a crack long before the section has given the rotation it was designed for. That is why AISC 358-22 does not leave the RBS flange cut to general shop practice. Section 5.6 sets how it is made, how smooth it must be, how accurate, and how damage is repaired. This article reads that section from the shop's side.

Thermal cutting to a smooth curve

Section 5.6 starts with the process: the reduced beam section is made by thermal cutting to produce a smooth curve. Thermal cutting covers oxy-fuel, plasma and laser processes. The curve is the circular arc of Figure 5.1, with radius R = (4c² + b²) / 8c, where b is the cut length and c the cut depth at the center. A circular cut spreads the strain evenly over the reduced region; a straight taper or a stepped cut does not, and those are not the prequalified shape.

The cut geometry, the start of the cut a from the column face, its length b and its depth c, comes from the design under Section 5.7, within the ranges a = 0.5 to 0.75 times the flange width, b = 0.65 to 0.85 times the beam depth and c = 0.1 to 0.25 times the flange width. The shop's job is to reproduce it exactly on both flanges, at both ends of every RBS beam. See the RBS design article for how those dimensions are chosen.

Surface roughness

The maximum roughness of the thermally cut surface is 12.5 μm (500 μin.), defined to ASME B46.1 and measured with AWS C4.1 Sample 4 or a similar visual comparator. AWS C4.1 is a set of reference samples of oxygen-cut surfaces; the inspector holds the comparator next to the cut and judges whether the drag lines and gouges are no worse than the sample.

In practice a well-tuned machine cut reaches this finish without further work. Hand-guided cuts usually do not, and need grinding. That is one reason RBS cuts are programmed, not freehand.

Transitions and corners

Two geometry rules follow.

  • Transitions between the reduced section and the full flange are rounded in the direction of the flange length, so there is no abrupt step where the curve meets the straight edge. The arc naturally meets the flange edge at a shallow angle, but the very end of the cut must be blended rather than left as a point.
  • Corners between the cut surface and the top and bottom faces of the flange are ground to remove sharp edges. No minimum chamfer or radius is required; the aim is simply to take off the knife edge where a crack could start.

Tolerances

Section 5.6 sets two tolerances:

  • the thermally cut surface within ±6 mm (1/4 in.) of the theoretical cut line;
  • the effective flange width at any section within ±10 mm (3/8 in.).

The first controls the position of the cut along the beam and its depth; the second controls the strength of the reduced section, since ZRBS depends directly on the remaining flange width. A cut that is too deep weakens the beam and raises drift; one that is too shallow raises the moment at the column face above what the design checked.

Gouges and notches

Thermal cutting occasionally leaves a gouge, for example where the torch stalls or the plate moves. Section 5.6 sets a graded repair:

  • Up to 6 mm (1/4 in.) deep: repair by grinding. The area is faired in so the transition is smooth, and the ground length on each side of the gouge is at least five times the gouge depth. Grinding may not deepen the cut by more than 6 mm (1/4 in.) beyond the specified depth.
  • Sharp notch: after grinding, the area is checked by magnetic particle testing (MT) to confirm the whole notch has been removed. Our magnetic particle testing page explains the method.
  • Deeper than 6 mm and up to 13 mm (1/2 in.), or where grinding would put the cut outside tolerance: repair by welding. The gouge is removed and ground to a smooth root radius of at least 6 mm (1/4 in.), the area is preheated to at least 66°C (150°F) or the AWS D1.1 value if higher, measured at the repair, and the weld is made to an approved procedure.
  • Deeper than 13 mm (1/2 in.): repair only by a method approved by the Engineer of Record.

Welded repairs in an RBS sit inside the protected zone, so they are recorded with their location, procedure and welder. Our AWS D1.8 series article on seismic base metal repair covers the welding side.

The protected zone around the cut

Section 5.3.1(8) defines the RBS protected zone as the beam between the face of the column and the end of the cut farthest from it. AISC 341 then bans welds, holes, shot-in fasteners, attachments and most repairs there without approval. For the shop that means no shop-welded clips, no stud welding, no erection aids and no identification marks made by welding inside the zone. Section 3.5 adds that tack welds for backing and weld tabs must sit where the final weld will consume them. Our D1.8 article on protected zone fabrication rules lists the details, and the protected zones guide shows how we mark the zone on the steel.

Inspection of an RBS cut

A practical inspection of each RBS beam end covers:

  • dimensions a, b and c against the shop drawing, and the remaining flange width at the center of the cut;
  • position of the cut on top and bottom flanges, which must line up;
  • roughness against the AWS C4.1 comparator;
  • transitions rounded and flange corners ground;
  • any gouge, its depth and the repair made, with MT where a sharp notch was ground;
  • no attachments inside the protected zone, and the zone marked as specified.

These checks go on the inspection record for the beam mark and into the handover file. The owner's inspector can review them at the plant or remotely.

Order of operations in the shop

The sequence around the cut matters as much as the cut itself. A good order for an RBS beam is:

  1. cut the beam to length and prepare both ends: bevels for the flange CJP welds, the weld access holes and the shear tab bolt holes;
  2. cut the RBS on both flanges at both ends from the same programmed reference, so the four cuts line up with each other and with the column face;
  3. inspect the cut dimensions and finish, grind transitions and corners, and repair any gouge before the next step;
  4. mark the protected zone as specified, without welding or stamping in it;
  5. blast and paint to the specified system, keeping faying surfaces and field weld zones masked as the drawing requires.

Doing the cut after the end preparation keeps the reference point, the column face, the same for both, so dimension a is measured from where the weld will actually be. Doing all inspection before blasting means a defect found later is found by the owner's inspector, not the erector.

Proof from our plant and projects

Cutting is a strength of our shop. Our CNC machines cut steel up to 100 mm thick from programs taken from the Tekla model, so the arc, the position and the depth of each RBS cut are the same on every beam end of a frame. Edge finishing and grinding are part of the same station, and the inspection result for each cut is kept with the beam mark.

Magnetic particle testing is done in house, so a ground notch can be checked the same day, and the owner's inspector can review cuts at the plant or remotely before blasting. The plant has been accredited under IAS AC472 since 2019 and is audited twice a year. The same discipline produced the heavy members of the 5,000 t Sunpro Steel mill and the 2,000 t Long Son petrochemical complex.

How we make RBS cuts

At World Steel the cut profile is taken from the Tekla model and cut by thermal cutting from a programmed path, so every beam end follows the same arc. The cut edges are checked against the comparator, transitions blended and flange corners ground before the beam goes to blasting and painting. Where a gouge occurs, it is repaired to Section 5.6 and recorded. Paint is kept compatible with the inspection, so the cut can still be checked on site.

Our plant in Vietnam is accredited under IAS AC472, the first and only one in Vietnam, and our welding procedures and welders are qualified to AWS D1.8 for any repair. Beam-end bevels and weld access holes for the field CJP welds are prepared in the same setup as the RBS cut, so the erector receives a beam ready for welding. Field welding and erection are the US contractor's scope.

For the design side read the reduced beam section article, and for the seismic provisions behind the protected zone read the AISC 341 landing.

Quick answers

How must an RBS flange cut be made?

Section 5.6 requires thermal cutting to a smooth curve, with a surface roughness of no more than 12.5 μm (500 μin.), rounded transitions to the full flange, and sharp corners at the flange faces ground off.

What is the RBS cut tolerance?

Plus or minus 6 mm (1/4 in.) from the theoretical cut line, with the effective flange width at any section within plus or minus 10 mm (3/8 in.).

Can a gouge in an RBS cut be repaired by welding?

Gouges up to 6 mm (1/4 in.) deep are ground out. Deeper ones, up to 13 mm (1/2 in.), or ones where grinding would exceed the cut tolerance, may be weld repaired with a root radius of at least 6 mm and preheat of at least 66°C (150°F). Deeper gouges need a method approved by the Engineer of Record.

Is magnetic particle testing required on RBS cuts?

Where a sharp notch has been ground out, Section 5.6 requires magnetic particle testing after grinding to confirm the whole notch is gone.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.