Steel industry · Can Tho City, Vietnam · 2024
Sunpro Steel Factory
About 5,000 t: the tonnage of a full plant package in one corner of the Triangle.
Project pageThe triangle board
Each corner of the Triangle buys different steel. The edges are the hauls from the Port of Houston; distances are approximate road distances.
Data centers, distribution hubs and a chip fab cluster to the north.
Petrochemical plants, LNG on the coast, the port and its logistics parks.
Chip fabs to the north and east, EV and battery plants, office and lab campuses.
Data centers, aerospace and auto suppliers on the I-35 and I-10 junction.
One supply line
Packages leave our plant in erection order and sail to the Port of Houston.
Breakbulk and containers cleared by your broker under the Incoterm you buy on.
Trucked on I-45, I-10 or US 290 to the corner where the site is.
Your crew sets the steel from our erection drawings and bolt lists.
The port in detail: steel shipped to the Port of Houston. The Texas side: Texas ports and logistics.
What the Triangle buys
Proof of scale
Steel industry · Can Tho City, Vietnam · 2024
About 5,000 t: the tonnage of a full plant package in one corner of the Triangle.
Project page
Food processing · Dong Nai Province, Vietnam · 2020
About 2,500 t of process plant steel, the scale of a Triangle supplier or food campus.
Project page
Warehouse and industrial · Thailand · 2024
About 2,000 t of repeat warehouse frames, as the Triangle’s logistics parks buy them.
Project pageReference jobs fabricated by World Steel outside the US, shown for scale and process. Tonnage in metric tons.
Site conditions
Each condition has its own guide in the state guide set. The corridor view stops here; the detail lives there.
In our plant in Vietnam
Real photos from World Steel: the shop floor, heavy girders, packed bundles and trucks leaving the plant. None is shown as a Texas site.
States on this corridor
Every state on the corridor has its own structural steel guide set. Start there for the adopted code, wind, snow, seismic and soil questions behind your package.
Who does what
Win-win partnership
You already run work in one corner of the Triangle. With World Steel behind you, a job in another corner does not wait for local fabrication: 2,500 t a month, US-code drawings and steel landed at Houston for your haul. You grow across the board; we stay your supply line.
Megaproject corridors
The building types behind these corridors: structural steel by project type. Every state guide set: structural steel solutions by state.
Questions
The region framed by Dallas–Fort Worth, Houston and San Antonio, with Austin on I-35. It holds most of the state’s population and many of its largest new chip, auto, data center and logistics projects.
By sea to the Port of Houston, then by truck: about 385 km (240 mi) to Dallas–Fort Worth on I-45, 320 km (200 mi) to San Antonio on I-10 and 265 km (165 mi) to Austin. We pack every package in erection order for that haul.
Yes. Our plant fabricates about 2,500 metric tons (2,750 US tons) a month, and each project runs on its own schedule and PEB Studio view.
Texas has no statewide building code for most private work, so we design to the IBC edition and amendments the city adopts, ASCE 7 loads, AISC 360 and AWS D1.1, plus the owner’s specifications. Your Engineer of Record approves.
No. World Steel designs and fabricates the steel structure only. Erection and site work are the scope of the US contractor, our customer.
No. The Triangle is covered as one corridor, and the Texas structural steel guides cover codes, soils, wind and ports for the whole state.
Send the drawings, the corner the site sits in and the schedule. We return a written steel scope, designed to the city’s adopted code, fabricated in our plant in Vietnam and landed at the Port of Houston.