Why one fabricator
Small steel, bought with the big steel
Misc metals are a small share of the tonnage and a large share of the coordination. Buying them from the shop that fabricates the frame takes one supplier, one drawing set and one gap out of your schedule.
One model, one set of coordinates
Embeds, lintels and angles are modeled with the frame, so the plate in the wall lines up with the beam that lands on it.
On the shop drawings, at no extra cost
Misc metals are drawn in the same submittal set as the structural steel, for your engineer and architect to review together.
Packed for the trade that sets them
Embeds bagged by pour, lintels by elevation, bollards by location, so each crew opens only its own boxes.
Early items ship first
Cast-in items can go in an early container ahead of the main steel, so the concrete schedule is not waiting on the frame.
Same quality system as the frame
The same welders, inspectors and records as the structural steel, in a plant audited twice a year under IAS AC472.
One supplier to chase
One purchase order and one contact for the frame and the small steel around it, instead of a separate misc metals shop.
What we make
Miscellaneous metal items in a World Steel package
Each item is detailed, fabricated and labeled with the frame. Items with their own page link to it.
Set by the concrete trade before the steel arrives.
-
Embed plates
Plates with headed studs or welded anchors, for beams and brackets that land on concrete walls and cores.
-
Slab edge and pour stop angles
Slab-edge and pour-stop angles, cast in at openings and slab edges.
-
Anchor rod assemblies
Anchor rods with nuts, washers and setting templates for column bases.
Steel that frames a hole in a wall, roof or floor.
-
Loose steel lintels
Angles and built-up lintels over masonry openings, set by the mason.
-
Wall, roof and floor opening frames
Jambs and headers at wall openings, angle frames around roof hatches, fans, ducts and floor openings.
-
Steel door frames
Pressed steel frames for walk doors, anchored to steel jambs we frame in the wall.
Angles that carry facades, slabs and secondary loads.
-
Shelf and relieving angles
Angles that carry brick veneer at floor lines, bolted or welded to the frame.
-
Ledger angles
Angles along walls and beams that carry deck, joists or slabs.
-
Mechanical and duct support steel
Frames and hangers for units, pipes and ducts, coordinated with the trades.
Steel that takes the knocks in yards, docks and plants.
-
Pipe bollards
Steel pipe bollards with base plates or embed ends, filled with concrete on site.
-
Column and corner guards
Angle and plate guards for columns, door jambs and wall corners in forklift aisles.
-
Dock edge angles
Embedded angles and leveler pit curbs that protect loading dock edges.
Ways up and across, detailed with the frame.
-
Fixed ladders and ship ladders
Ladders with cages or fall-arrest rails where your safety plan calls for them.
-
Stairs, handrails and guardrails
Stair stringers, landings and rails on their own product pages.
-
Platforms and catwalks
Grated platforms and walkways around equipment.
Embeds
Embed plates, in the wall before the steel arrives
An embed has to be in the wall before the steel exists on site. That makes it the first steel item on the schedule, and the one that costs the most when it is wrong.
- Embed planEvery embed is located on an embed plan, by grid line and elevation, from the same model as the steel that will land on it.
- Fabricated firstPlates are cut, drilled and fitted with headed studs or welded anchors, shop-welded when specified.
- Packed by pourEach pour gets its own labeled bundle or crate, with the embed plan inside.
- Shipped aheadCast-in items can travel in an early container, ahead of the main steel shipment.
- Set by the concrete tradeThe US contractor's concrete crew sets and surveys the embeds to the tolerances in the contract.
- Steel lands on themBeam seats, clip angles and brackets on our members are drilled or detailed to meet those embeds.
Embed anchorage into the concrete is designed under ACI 318 Chapter 17 by the Engineer of Record. We fabricate to the anchorage shown on the approved drawings.
Embed plates in depth: types, stud welding and settingLintels
Loose lintels and lintels on the frame
A lintel looks simple until two trades each think the other one is buying it. AISC 303 settles part of that question, and the contract settles the rest.
Loose lintels
Angles or plates that rest on the masonry at each end. Under AISC 303 they are not structural steel unless the contract says so; they sit in the misc metals or masonry scope and are set by the mason.
Lintels attached to the frame
Hung lintels and relieving angles bolted or welded to the structural steel are structural steel under AISC 303 Section 2.1, and we shop-attach them where the drawings show it.
Exterior lintels
Lintels in exterior masonry are often hot-dip galvanized to ASTM A123, by an outside galvanizer arranged for the project.
Bearing length, deflection limits and lintel sizes come from the project drawings and your engineer. A scope sheet with the quote lists each lintel as ours, by the mason, or by others. See the AISC 303 scope sorter for the full split.
Steel lintels in depth: shapes, bearing and deflectionWho does what
Our part, and the US contractor's part
World Steel details, fabricates, coats and ships. The US contractor, our customer, and its trades set and install.
| Task | World Steel | US contractor |
|---|---|---|
| Scope list | Lists every misc metal item on the drawings with the quote | Confirms which items are in our order |
| Detailing | Models and draws the items on the shop drawings, at no extra cost | Reviews, with its engineer and architect, and approves |
| Anchorage design | Fabricates to the anchorage shown | Engineer of Record designs it under ACI 318 Chapter 17 |
| Fabrication | Cuts, drills, welds to AWS D1.1 and inspects in our plant | Can witness hold points in the plant or over live video |
| Coating | Shop primer and paint, or galvanizing through an outside galvanizer | Touches up after installation |
| Packing | Packs by area, by pour and by trade, labels every piece | Receives and stores on site |
| Setting and installation | Not in our scope: World Steel does not install or erect | Concrete crew sets embeds, mason sets loose lintels, erector installs the rest |
- Scope list
World Steel: Lists every misc metal item on the drawings with the quote
US contractor: Confirms which items are in our order
- Detailing
World Steel: Models and draws the items on the shop drawings, at no extra cost
US contractor: Reviews, with its engineer and architect, and approves
- Anchorage design
World Steel: Fabricates to the anchorage shown
US contractor: Engineer of Record designs it under ACI 318 Chapter 17
- Fabrication
World Steel: Cuts, drills, welds to AWS D1.1 and inspects in our plant
US contractor: Can witness hold points in the plant or over live video
- Coating
World Steel: Shop primer and paint, or galvanizing through an outside galvanizer
US contractor: Touches up after installation
- Packing
World Steel: Packs by area, by pour and by trade, labels every piece
US contractor: Receives and stores on site
- Setting and installation
World Steel: Not in our scope: World Steel does not install or erect
US contractor: Concrete crew sets embeds, mason sets loose lintels, erector installs the rest
Finish and QA
Coated and checked like the structural steel
Paint
Shop primer and paint systems from Jotun, PPG, Carboline, Hempel, Nippon or International Paint, applied by painters trained by the manufacturer.
Galvanizing
Hot-dip galvanizing to ASTM A123 for exterior lintels, bollards and anything in the weather, arranged with an outside galvanizer.
Inspection
Visual inspection of every weld, dimensions checked against the drawings, records kept by piece mark in PEB Studio.
Records
Mill certificates traced by heat number, as for the structural steel.
Plates, angles and small assemblies in our plant
Related
Where misc metals meet the rest of the job
Questions
Miscellaneous metals questions
What counts as miscellaneous metals?
Usually the items in Division 05 50 00, Metal Fabrications: embeds, loose lintels, shelf and ledger angles, bollards, opening frames, ladders, stairs and rails. Which of them are in our order is listed on a scope sheet with the quote.
Can you supply embeds before the structural steel?
Yes. Embeds and anchor rods can be fabricated first and shipped in an early container, packed by pour, so your concrete crew can set them before the frame arrives.
Do you design the embed anchorage?
No. Anchorage into concrete is designed by the Engineer of Record under ACI 318 Chapter 17. We fabricate the plates, studs and anchors shown on the approved drawings.
Are loose lintels part of the structural steel package?
Only if the contract says so. AISC 303 counts lintels as structural steel when they are attached to the frame; loose lintels set in masonry are other items. We can supply both when they are listed in the order.
Can misc metals be galvanized?
Yes. Exterior lintels, bollards and yard steel can be hot-dip galvanized to ASTM A123 by an outside galvanizer arranged for the project, or painted with a system from a major paint brand.
Who installs the misc metals?
The US contractor, our customer, and its trades: the concrete crew sets embeds, the mason sets loose lintels and the erector installs the rest. World Steel fabricates and ships; it does not install or erect.
Built for large jobs
Miscellaneous metals for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included