The beam-to-column welds of a moment frame are where the 1994 Northridge earthquake found its weak point. Many of the fractures started at the root of the bottom flange weld, at backing left in place, at weld tabs and at notches no one had thought about. Chapter 3 of AISC 358-22 is the standard's answer: a short list of rules for the details around the weld that decide whether a ductile connection stays ductile. These AISC 358 welding requirements apply to every connection chapter unless that chapter says otherwise, and they sit on top of the demand-critical weld rules of AISC 341 and AWS D1.8.
Filler metals and welding procedures
Sections 3.1 and 3.2 are one line each: filler metals and welding procedures shall meet the AISC Seismic Provisions. In practice that means the demand-critical weld rules of AISC 341, which call on AWS D1.8 for filler metal toughness, heat input and procedure qualification. Our AWS D1.8 page and the WPS and PQR page explain how our procedures are qualified. Chapter 3 then deals with the geometry around the weld.
Backing at the beam flanges
Steel backing is a strip under the root of a complete-joint-penetration (CJP) groove weld that lets the welder make the root pass from one side. Left in place, it creates a built-in notch at the root. Section 3.3 sets what to do with it at each location.
Bottom flange
Section 3.3.2 is the strictest rule in the chapter. Where steel backing is used at the CJP weld between the bottom beam flange and the column, it must be removed. The root is then backgouged to sound weld metal and backwelded with a reinforcing fillet. The fillet leg on the column side is at least 8 mm (5/16 in.); the leg on the beam side must put the fillet toe on the beam flange base metal. If the base metal and root are ground smooth after removal, the beam-side leg need not reach the base metal.
The bottom flange is singled out because it sees the highest tension when the slab pushes the neutral axis up, and because its root sits at the end of the weld access hole where the strains concentrate. Our D1.8 article on backing removal and reinforcing fillets covers the shop sequence and the overhead welding position this creates on site.
Top flange
Section 3.3.3 is gentler. Backing at the top flange may stay in place if it is attached to the column with a continuous 8 mm (5/16 in.) fillet weld on the edge below the CJP weld. The fillet closes the notch between backing and column flange, which is the one that matters for tension in the column direction.
Continuity plates
Section 3.3.1 lets backing at continuity plate-to-column welds stay, again with a continuous 8 mm (5/16 in.) fillet to the column flange on the edge below the CJP weld. If the backing is removed, the root is backgouged and a continuous reinforcing fillet of at least 8 mm (5/16 in.) is added.
Nonfusible backing
Section 3.3.5 covers ceramic or other nonfusible backing. It is always removed, the root backgouged and a reinforcing fillet added with the same leg rules as the bottom flange.
Welds that must never be made
Section 3.3.4 bans one weld outright: backing at a beam flange-to-column joint must not be welded to the underside of the beam flange, and no tack welds are allowed there either. A weld across the flange underside sits right in the hinge region and would start a crack.
If such a weld is made by mistake, the standard gives a repair: remove the weld so it no longer joins backing to flange, grind the flange flush and free of defects, and repair any gouge with E7018 SMAW electrodes or another demand-critical filler metal under a special WPS, ground smooth afterward. The point for a fabricator is to never need this repair: backing is tacked inside the joint, not to the flange.
Weld tabs
Weld tabs (runoff tabs) extend the groove past the edge of the flange so the start and stop of the weld fall outside the joint. Section 3.4 requires that, where used, they are removed to within 3 mm (1/8 in.) of the base metal surface and the weld end finished. At continuity plates, removal to within 6 mm (1/4 in.) of the plate edge is allowed. Removal may be by air carbon arc cutting, grinding, chipping or thermal cutting, controlled to avoid gouging.
The finished edge must have a surface roughness of 12.5 μm (500 μin.) or better, and the weld end must blend smoothly into the adjacent surfaces with no notches, gouges or sharp corners. Defects deeper than 2 mm (1/16 in.) are excavated and repaired by welding to a WPS; smaller ones are ground out and faired at a slope no steeper than 1 in 5. The D1.8 article on weld tab removal and end dams shows how this is done and inspected.
Tack welds in the protected zone
Section 3.5 says that inside the protected zone, tack welds holding backing and weld tabs must be placed where the final weld will consume them. A tack weld left outside the final weld is an unplanned attachment in the zone AISC 341 keeps clean. Our protected zones guide explains what else is excluded there.
Continuity plate clips and weld ends
Section 3.6 sets the corner clips of continuity plates in rolled columns. Along the web, the clip extends at least 38 mm (1 1/2 in.) beyond the kdet dimension of the rolled shape, which keeps the weld off the k-area where rolled shapes can have low toughness. Along the flange, the clip avoids the fillet radius but extends no more than 13 mm (1/2 in.) beyond k1, so the flange weld keeps enough length. A curved clip has a radius of at least 13 mm (1/2 in.). The clip must allow sound weld terminations for both welds.
Weld tabs are not used at the end of the continuity plate weld next to the column web-flange junction unless the Engineer of Record permits, and if used there they stay unless the Engineer of Record says remove them. Where welds are made without tabs near the fillet radius, weld layers may be cascaded at 0° to 45° from vertical; the tapered part is not counted in the effective length and needs no NDT.
Quality control and assurance
Section 3.7 sends quality control and quality assurance to AISC 341. That is where the inspection tasks, the ultrasonic testing of CJP welds and the documentation sit, explained in our seismic inspection guide.
A checklist for the shop drawing review
When the US contractor's reviewer or the Engineer of Record checks the shop drawings of a prequalified welded connection, Chapter 3 gives a short list to look for on each joint:
- backing material at each flange, and whether it is removed or left with its fillet;
- reinforcing fillet sizes at the bottom flange and at any removed continuity plate backing;
- weld tab use, removal and finish at both ends of every CJP flange weld;
- the location of tack welds relative to the final weld inside the protected zone;
- continuity plate clip dimensions measured from kdet and k1 of the actual rolled column;
- the protected zone boundary drawn on the beam, so no shop attachment lands inside it.
A detail that answers each of these leaves very little for the inspector to argue about later.
Proof from our plant and projects
Chapter 3 is where welding discipline shows. Our welding procedures and welders are qualified to AWS D1.8, our plant has been accredited under IAS AC472 since 2019 and is audited twice a year, and every demand-critical shop weld is recorded with its WPS, welder and test result. Ultrasonic testing is done in house, magnetic particle and penetrant testing too, with radiography through a partner or any third-party agency the customer names, as our NDT page explains.
The same team welds the heavy built-up members of our flagship jobs: the 5,000 t Sunpro Steel mill and the 2,000 t Long Son petrochemical complex, where thick plate, preheat and CJP testing are daily work. Inspection items and rates are agreed with the customer in a project inspection and test plan before fabrication starts, so the Chapter 3 checks are written down rather than assumed.
How Chapter 3 shows up in our shop
On a World Steel moment frame job, Chapter 3 becomes drawing notes and checklist lines: backing type and whether it is removed, reinforcing fillet sizes, tab removal and finish, clip dimensions, and the protected zone boundary. Many beam-to-column joints of a prequalified connection are field welds made by the US contractor's erector; our scope is the shop welds, such as continuity plates, doublers, shear tabs and end plates, plus the preparation and marking of the field joints. Our plant in Vietnam is accredited under IAS AC472, and our welders and procedures are qualified to AWS D1.8.
For the system-level weld rules read the demand-critical welds guide and the AISC 341 landing. The next article covers the companion bolting rules of Chapter 4.
Quick answers
Must bottom flange backing be removed?
Yes. Section 3.3.2 requires steel backing at the beam bottom flange CJP weld to be removed, the root backgouged to sound metal and backwelded with a reinforcing fillet at least 8 mm (5/16 in.) on the column leg.
Can top flange backing stay in place?
Yes, if it is attached to the column by a continuous 8 mm (5/16 in.) fillet weld on the edge below the CJP groove weld, under Section 3.3.3.
How close must weld tabs be removed?
Section 3.4 asks for removal to within 3 mm (1/8 in.) of the base metal surface, or 6 mm (1/4 in.) at continuity plates, with the edge finished to 12.5 μm (500 μin.) roughness or better.
Which welding code governs the filler metal?
Section 3.1 and 3.2 send filler metal and procedures to AISC 341, which calls on AWS D1.8 for demand-critical welds. Our WPS and welders are qualified to AWS D1.8.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors


