Bolted flange plate connection: BFP limits, bolts and the 18-step design in AISC 358-22

The bolted flange plate keeps all welding in the shop and lets the erector bolt the beam flanges on site. It is one of the most forgiving prequalified connections to erect, and one of the most exacting to detail. Here is how the BFP works under AISC 358-22 Chapter 7.

· 6 min read · World Steel USA engineering team

The bolted flange plate connection (BFP) is the bolted cousin of the old welded flange joint. Instead of welding the beam flanges to the column on site, the shop welds two identical plates to the column flange, one above and one below the beam, and the erector bolts the beam flanges to them. The beam web hangs on a bolted shear tab with slotted holes. The result is a moment connection with no field welding and generous erection tolerance. Chapter 7 of AISC 358-22 sets the rules, and they are some of the most detailed in the standard.

How the BFP works

Section 7.1 describes it: plates welded to the column flanges with CJP groove welds, beam flanges connected to them with high-strength bolts, and the web connected by a bolted single-plate shear connection with bolts in short-slotted holes. The top and bottom plates must be identical. Initial yielding and the plastic hinge form in the beam near the end of the flange plates, where the bolt group ends.

Section 7.2 prequalifies the BFP for SMF and IMF. In an SMF with a concrete structural slab, it is prequalified only if the slab is isolated from the column under Section 2.3.4.

Beam limits

Section 7.3.1 sets:

  • rolled or built-up I-shapes per Section 2.3;
  • depth up to W920 (W36);
  • weight up to 220 kg/m (150 lb/ft);
  • flange thickness up to 25 mm (1 in.);
  • clear span-to-depth ratio of at least 9 for SMF and 7 for IMF, higher than the welded connections because the hinge sits further from the column;
  • width-to-thickness ratios to AISC 341;
  • supplemental bracing at top and bottom flanges between d and 1.5d from the bolt farthest from the column, outside the protected zone. A composite slab with welded shear connectors at no more than 300 mm (12 in.) spacing between protected zones removes the need.

The protected zone includes the flange plates and the beam from the column face to one beam depth beyond the farthest bolt.

Column limits

Section 7.3.2 accepts rolled and built-up columns of Section 2.3, with the beam on the column flange. The depth limit depends on the slab: rolled columns up to W920 (W36) with a concrete structural slab, but only W360 (W14) without one. Built-up box columns and boxed wide-flange columns in orthogonal frames stay within 600 mm (24 in.).

Plates, welds and bolts

Section 7.4 fixes the details.

Plate material

Connection plates are ASTM A36 or A572 Grade 50 (345 MPa).

Flange plate welds

Flange plates are joined to the column flange with CJP groove welds, treated as demand-critical. Backing, if used, is removed, the root backgouged and backwelded. These are shop welds, made in the flat position on a column lying in the shop.

Shear plate welds

The single plate for the web is welded to the column flange with CJP welds, two-sided PJP welds or two-sided fillets.

Bolts

  • Bolts are symmetric about the beam axes, two per row, with the bolt group no longer than the beam depth.
  • Standard holes in the beam flanges; standard or oversized holes in the flange plates. A user note warns that standard holes in the plates will likely need field modification to fit erection tolerances.
  • All holes in beam flanges and flange plates are drilled or sub-punched and reamed.
  • Flange plate bolts are ASTM F3125 Grade A490, A490M or F2280, with threads excluded from the shear plane, and at most 28 mm (1 1/8 in.) in diameter.

Shims

Shims up to 6 mm (1/4 in.) total may sit between flange plate and beam flange. They absorb the difference between the beam's actual depth and the clear distance between the plates.

The design procedure

Section 7.5 has eighteen steps, the longest of the non-proprietary chapters.

  1. Mpr with Ze = Zb.
  2. Beam flange net-section rupture, new in 2022: Rt Fub Zb,net ≥ Ry Fyb Zb, so the beam yields before it tears at the bolt holes. A simple form gives a maximum hole diameter.
  3. Assume the flange plate thickness and estimate its width.
  4. Choose a trial number of bolts.
  5. Locate the hinge: Sh = S1 + s(n/2 − 1), the distance from the column face to the bolt farthest from it.
  6. Vh at the hinge.
  7. Mf at the column face.
  8. Fpr, the force in each flange plate from Mf.
  9. Confirm the number of bolts for Fpr in shear and bearing.
  10. Confirm the plate thickness for yielding.
  11. Check plate tensile rupture.
  12. Check block shear of the beam flange and the plate.
  13. Check plate buckling in compression.
  14. Check beam shear.
  15. Design the web connection.
  16. Check continuity plates.
  17. Check the panel zone.
  18. Check the column-beam moment ratio.

The hinge is further from the face than in a WUF-W, so Mf is larger relative to Mpr. That loads the plate welds and the column side, but it also means the flange welds are made in the shop, where they are easiest to control.

Why contractors like the BFP

  • No field welding on the moment connection; all CJP welds are shop welds on the column.
  • Erection tolerance: oversized holes in the plates and shims between plate and flange absorb column out-of-plumb, beam depth variation and length.
  • Simple site inspection: bolting and pretension checks instead of field UT.
  • Familiar parts: plates and bolts, no proprietary hardware.

The costs are the bolt count, the high-strength A490 bolts with threads excluded, drilled holes, large plates, slab isolation in SMF, and the longer span-to-depth requirement that rules out short bays.

Where the BFP fits in US projects

The BFP suits steel frames where field welding is hard to staff or inspect, such as remote sites in Alaska, northern Nevada and rural Utah, and frames erected in cold or wet seasons on the Pacific Northwest coast. It also suits projects where the schedule cannot absorb field UT and repair cycles. Its limits point to moderate spans and beams up to W920 (W36), with a structural slab for anything deeper than a W360 (W14) column.

Proof from our plant and projects

A BFP frame is mostly column work, and heavy columns are our specialty. We fabricate rolled and welded box columns, with shop CJP welds to our AWS D1.8 procedures and in-house ultrasonic testing, and we drill or ream every hole the chapter requires. Our box columns for the New Hope Dong Nai feed factory left the plant welded and fitted with bolted connection plates, ready to receive beams.

Packages at scale are familiar too: our flagship jobs include the 5,000 t Sunpro Steel mill and the 2,000 t Long Son petrochemical complex. For a US contractor, that means a BFP package arrives with plates, shims and bolts bundled by connection mark, and the shop welds already tested. The plant has been accredited under IAS AC472 since 2019, audited twice a year.

The record for each column travels with it: mill certificates traced by heat number, the WPS and welder for each flange plate weld, the UT report, and the dimensional check of the hole pattern. Material is tested at ILAC-accredited labs or the lab the customer names, and inspection items are agreed in the project inspection and test plan before work starts.

How World Steel supplies BFP frames

On a BFP job, most of the connection is in the column. Our shop welds the flange plates and shear tabs to the column flanges with CJP welds to our AWS D1.8 procedures, removes backing, backgouges and backwelds, and tests the welds as the inspection plan requires. Holes in the beam flanges and flange plates are drilled or sub-punched and reamed, never laser cut, as Section 7.4.4 requires; the bolt-hole fabrication article explains why. Beams arrive with drilled flanges and their protected zone marked; shims and A490 or F2280 structural bolts can ship with the package.

Our plant in Vietnam is accredited under IAS AC472, the first and only in Vietnam, with a fabrication capacity of 2,500 t per month. Bolting and erection are the US contractor's scope, and the Engineer of Record's design governs. For the seismic provisions read the AISC 341 landing.

Quick answers

How does a bolted flange plate connection work?

Top and bottom plates are CJP welded to the column flange in the shop and bolted to the beam flanges in the field. The beam yields and forms its plastic hinge near the end of the flange plates, at the bolt farthest from the column.

What bolts does a BFP use?

ASTM F3125 Grade A490, A490M or F2280 in the flange plates, threads excluded from the shear plane, up to 28 mm (1 1/8 in.) diameter, two bolts per row.

Is the BFP limited by column size?

Yes. Rolled columns may be up to W920 (W36) deep with a structural slab, but only up to W360 (W14) without one.

Does a BFP need slab isolation?

In SMF with a concrete structural slab, yes: Section 7.2 prequalifies it only when the slab is isolated from the column under Section 2.3.4.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 358-22 prequalified connections series

Twenty in-depth articles on the 2022 standard for prequalified moment connections: the design rules every connection shares, the welding and bolting chapters, each connection family a US moment frame uses, and how the choice plays out in the high-seismic West and the New Madrid zone.

Chapters 1–2Scope and design rules

What prequalification means, what changed in 2022, member limits and the moment at the column face.

Chapters 3–4Welding, bolting and QA

Backing, weld tabs, continuity plate clips, pretensioned bolts, holes and the inspection record.

Chapters 5 and 8Welded connections

The reduced beam section and the welded unreinforced flange, welded web.

Chapters 6, 7 and 13Bolted connections

Extended end plates, bolted flange plates and the double-tee.

Chapters 9–15Brackets, slots and proprietary systems

Cast bolted brackets, the slotted web, and the patented connections in the standard.

Where it appliesUS projects

Choosing a connection, and AISC 358 in the West Coast, Intermountain and New Madrid markets.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.