Steel industry · Can Tho City, Vietnam · 2024
Sunpro Steel Factory
A steel mill, about 5,000 t: mill halls, crane bays and built-up members, the Ohio Valley’s own building type.
Project pageLarge-project capacity
Mill buildings are the heaviest structural steel a fabricator makes: tall crane-served bays, built-up columns, runway girders for heavy cranes and long roof trusses. The Sunpro Steel mill, about 5,000 t of steel, was ours, and our plant fabricates 2,500 metric tons (about 2,750 US tons) a month.
Welded on automatic beam lines from plate cut by laser up to 100 mm thick.
Runway girders and brackets designed for the crane class the mill specifies, with cranes supplied on request.
Welding procedures, NDT and dimensional checks recorded per piece for the owner’s inspector.
Largest single jobs, metric tons
Plant output: 2,500 t (about 2,750 US tons) a month. How large jobs run
River manifest
Read the valley as a tow heading downriver: each reach builds something different, and the steel follows.
What the valley buys
The mill in detail: Sunpro Steel mill, about 5,000 t by World Steel. Crane design: US crane building design.
Proof of scale
Steel industry · Can Tho City, Vietnam · 2024
A steel mill, about 5,000 t: mill halls, crane bays and built-up members, the Ohio Valley’s own building type.
Project page
Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022
About 2,000 t of pipe racks and process steel, the pattern of the valley’s chemical plants.
Project page
Animal feed · Dong Thap Province, Vietnam · 2018
About 1,500 t of tall process steel, as food and polymer plants on the river buy it.
Project pageReference jobs fabricated by World Steel outside the US, shown for scale and process. Tonnage in metric tons.
Port to site
The valley sits between two coasts, so there are two ways in. We plan the route with your forwarder before cutting, because it sets the piece lengths.
Sailing, packing and tracking: shipping steel from Vietnam to the USA. Inland moves follow the Incoterm you buy on.
Site conditions
Each condition has its own guide in the state guide set. The corridor view stops here; the detail lives there.
In our plant in Vietnam
Photos of the Sunpro Steel mill in Vietnam, about 5,000 t of structural steel by World Steel. Not an Ohio Valley site.
States on this corridor
Every state on the corridor has its own structural steel guide set. Start there for the adopted code, wind, snow, seismic and soil questions behind your package.
Who does what
Win-win partnership
You know the river, the owners and the union crafts. We bring a steel mill already framed, 2,500 t a month and heavy built-up members made in house. Bid the crane bays and racks together; we stay the fabricator behind your next valley job.
Megaproject corridors
The building types behind these corridors: structural steel by project type. Every state guide set: structural steel solutions by state.
Questions
Yes. The Sunpro Steel Factory in Vietnam, about 5,000 t of structural steel, is our largest single job: mill halls, crane-served bays and built-up members. The Sunpro page shows the steel.
Yes. Built-up runway girders, surge girders and brackets are welded on our automatic beam lines from plate cut by laser up to 100 mm thick, designed for the crane class the owner specifies. We can also supply overhead cranes with the building on request.
Either through Baltimore or Norfolk and over the mountains by truck or rail, or through New Orleans and up the river by barge for heavy pieces. Your importer or forwarder arranges the inland move under the Incoterm.
Pennsylvania, West Virginia, Ohio, Kentucky and Indiana along the Ohio River, plus the chip and battery sites on the interstates just off it. Each state also has its own structural steel guide.
The US contractor, our customer. World Steel designs and fabricates only. Your Engineer of Record approves the drawings and handles the PE seal and the permit.
Erection is always the US contractor’s scope, union or open shop. We supply erection drawings, piece marks and bolt lists that suit the crew you use.
Send the general arrangement, the crane data and the site. We return a written steel scope, designed to the codes your state adopts, fabricated in our plant in Vietnam and shipped through the Atlantic or Gulf ports.