Five corridors
Where US megaprojects cluster, and the steel each corridor buys
Each corridor page has its own map of the work, the port that serves it, the site conditions that matter and the state guides to read next.
How we read the map
Why we plan steel by corridor
A corridor, not a city
Megaprojects pick a corridor for its power, water, rail and labor. The steel question is the same at every site along it: who can supply at this scale while local shops are full.
One port, many sites
Each corridor is served by one or two seaports. We plan every package around that port, so a second job on the same corridor reuses the same route.
Waves, not one delivery
Megaprojects buy steel in phases. We fabricate in the order your schedule sets and ship each phase in erection sequence.
Local contractors, our customers
We do not erect. The US contractor in the corridor builds the job; we stay the steel source behind them for the next one.
Who does what
We make the steel. The US contractor builds the job.
World Steel
- Steel design to the codes the project names, with calculations for your Engineer of Record
- Proposal, approval, shop and erection drawings at no extra cost
- Columns, girders, trusses, racks, platforms, stairs, purlins and girts, cut, welded and drilled in our plant
- Blasting and coating in our plant, with dry film records and every piece tracked in PEB Studio
- Packages loaded in erection order and shipped to the US port that serves your corridor
The US contractor, our customer
- Drawing approval, the PE seal and the permit, with your Engineer of Record
- Foundations, anchor rods set to template, slabs and site work
- Import, customs and the inland haul, as the Incoterm sets out
- Erection, cranes, bolting up and the lift plan
- Cladding install, MEP, process equipment and fit-out
Win-win partnership
US contractors on any corridor: add a steel source that is not already booked
You own the client, the site and the crews. We add our own plant, 2,500 t a month, US-code drawings and a tracked delivery to the port that serves your corridor. You bid the packages local shops cannot staff; we stay the steel source behind your next megaproject.
Questions
Megaproject corridors: what US contractors ask first
What is a megaproject corridor?
A region where several very large industrial projects are being built at the same time, usually because of power, water, ports, rail and a skilled workforce: the Arizona chip corridor, the Louisiana LNG and data center belt, the Texas Triangle, the Ohio Valley and the Southeast battery belt. Each page explains the steel those projects buy and how it reaches the site.
How much structural steel can World Steel supply to one corridor?
Our own plant fabricates about 2,500 metric tons (2,750 US tons) of structural steel a month, and our largest single job reached 5,000 t. That is enough to carry a full package of a megaproject, or several packages on one corridor, in parallel.
Why buy corridor steel from Vietnam rather than a local shop?
When a corridor booms, local shops fill up first. A second source with its own plant, IAS AC472 accreditation and US-code design adds capacity without adding a crowded shop to your critical path. Many contractors split packages: local shops for the fast, small work, World Steel for the large repeat tonnage.
Does World Steel erect the steel on site?
No. World Steel designs and fabricates the steel structure only. Erection and site work are the scope of the US contractor, our customer. We supply erection drawings, piece marks and bolt lists so the crew can set the steel.
Who approves and seals the drawings?
The US contractor and its Engineer of Record. We deliver calculations and drawings designed to the codes the project names, ready for their review and approval. The PE seal and the permit are theirs.
Do you build pages for single cities?
No. A city page would repeat the state guide. Each corridor page covers a region that crosses counties or states, and links down to the state guides for codes, loads and site conditions.
Bidding a package on one of these corridors?
Send the drawings, the tonnage you expect and the site. We return a written scope for the steel, designed to US codes, fabricated in our plant in Vietnam and shipped to the port that serves your corridor.