Single-storey steel portal frame with tapered rafters fabricated by World Steel

AISC 341 seismic steel

OMF, IMF and STMF: choosing an intermediate moment frame or its neighbors

Not every steel moment frame has to be special. AISC 341-22 Chapter E offers the ordinary moment frame, the intermediate moment frame and the special truss moment frame, each with its own trade-off between design force and detailing. Here is how they compare and where each one fits.

· updated November 30, 2026 · 7 min read · World Steel USA engineering team

When engineers talk about seismic steel moment frames, the special moment frame gets most of the attention. Yet many steel buildings in the United States, from metal warehouses in Utah to schools in Oregon and plants in Missouri, rely on frames that are not special at all. AISC 341-22 Chapter E offers a ladder of moment frame systems, and the right rung depends on the building's Seismic Design Category, its height, its weight and the cost of detailing. This article covers three of them: the ordinary moment frame (OMF), the intermediate moment frame (IMF) and the special truss moment frame (STMF), and explains how to choose.

The trade-off behind every moment frame

Every seismic system in ASCE 7 balances two things. A higher response modification coefficient, R, means a lower design force and lighter members, but it demands more ductility, which means stricter detailing, more expensive connections and more inspection. A lower R means a higher design force and heavier members, but simpler details.

For steel moment frames, ASCE 7-22 Table 12.2-1 gives:

System R Ω0 Cd AISC 341 section
Special moment frame (SMF) 8 3 5.5 E3
Special truss moment frame (STMF) 7 3 5.5 E4
Intermediate moment frame (IMF) 4.5 3 4 E2
Ordinary moment frame (OMF) 3.5 3 3 E1

The OMF is designed for more than twice the force of an SMF but asks far less of its connections. Which is cheaper depends on the building.

Ordinary moment frames: Section E1

An OMF is expected to provide minimal inelastic deformation in its members and connections. It is strong rather than ductile.

Connections

Beam-to-column connections in an OMF may be fully restrained (FR) or partially restrained (PR).

  • FR connections are designed for a flexural strength based on the beam's expected plastic moment, 1.1 Ry Mp, or for the maximum moment the system can deliver, or for the moment from the overstrength load combinations, whichever the standard allows as the lesser. Complete-joint-penetration welds of beam flanges to columns are demand critical, and the weld access holes, backing and weld tabs follow the detailing rules that apply.
  • PR connections are designed for the forces from analysis, including the connection's flexibility, with the strength checks the standard sets.

No story drift angle capacity has to be demonstrated, because the frame is not expected to rotate much beyond yield.

Where OMF is permitted

ASCE 7 limits OMF in Seismic Design Categories D, E and F. It is generally not permitted there except under specific exceptions, the most important of which covers light single-storey buildings: OMF may be used in SDC D and E for single-storey structures up to a height limit where the roof dead load and the exterior wall weight tributary to the frame are small, about 0.96 kPa (20 psf). There are further exceptions for light-frame construction and for some low buildings. In SDC B and C, OMF is permitted without these limits.

Why it matters for metal buildings

That single-storey exception is why so many pre-engineered metal buildings in seismic regions use ordinary moment frames. A gable or multi-span rigid frame with a light metal roof fits the weight limit easily, and the higher design force is often absorbed by the frame's size, which wind or crane loads already govern. See rigid frame systems and tapered frames.

Web-tapered members, common in metal building frames, are used in these OMF designs within the limits AISC 341 and AISC 360 set, with attention to the connection strength at the knee and the ridge, and to bolted end-plate connections designed for the forces Section E1 requires.

Intermediate moment frames: Section E2

An IMF is expected to provide limited inelastic deformation, enough to sustain a story drift angle of 0.02 radian.

Connections

IMF beam-to-column connections must be proven: either prequalified under Section K1, which in practice means a connection from AISC 358, or qualified by cyclic tests under Section K2. The connection must reach a story drift angle of at least 0.02 radian while keeping a measured flexural resistance, at the face of the column, of at least 80 percent of the beam's nominal plastic moment.

The required shear strength of the connection is based on the beam's expected flexural strength plus gravity load, a capacity-design force. Complete-joint-penetration welds of beam flanges, webs and certain splices are demand critical.

Members

IMF beams and columns must meet the moderately ductile width-to-thickness limits of Table D1.1, beam bracing follows the moderately ductile spacing of Section D1.2, and the beam ends where hinging is expected are protected zones.

Where IMF is permitted

IMF is permitted in more situations than OMF in SDC D, but ASCE 7 still sets height limits in SDC D, E and F, with exceptions for light single-storey buildings. For low and mid-rise buildings in moderate seismic regions, IMF often hits a sweet spot: lighter than OMF, simpler than SMF.

Special truss moment frames: Section E4

The STMF is a different animal. Instead of solid beams, the frame uses truss girders, and instead of hinging at the beam ends, it concentrates yielding in a special segment near mid-span of each truss.

How it works

Within the special segment, either vertical members or X-pattern diagonals yield in a controlled way as the frame sways, while the chords, the rest of the truss and the columns are designed to stay elastic for the forces the special segment can develop. Because the truss is deep and stiff, an STMF can span longer than a solid beam frame of similar weight.

Limits

AISC 341 places geometric limits on STMF so the special segment behaves as tested: the span between columns is limited to about 20 m (65 ft), the overall truss depth to about 1.8 m (6 ft), and the special segment length must fall within a set range of the span, with limits on its panel proportions. The special segment is a protected zone, and no splices or attachments are permitted there except as the standard allows.

Where STMF fits

STMF suits buildings where open floors and long spans matter and where trusses are already the natural choice: gymnasiums, assembly halls, low industrial buildings with mezzanines and some parking structures. It is less common than SMF in US practice, but it is an efficient alternative when truss girders are part of the architecture. See steel trusses.

Inspection and documentation differences

The three systems also differ in what the special inspector and the quality assurance agency will look for under Chapter J:

  • OMF: visual inspection of all welds, ultrasonic testing of the complete-joint-penetration welds Chapter J assigns, and checks that demand-critical welds use the correct filler metal. No connection qualification documents are needed beyond the design.
  • IMF: the same weld inspection, plus documentation that the connection is prequalified under AISC 358 or qualified by test, verification that its limits are met, and checks that protected zones are free of attachments and damage.
  • STMF: inspection of the special segment members and their connections, verification that no splices or attachments are made within the special segment, and checks on the elastic truss members and their welds.

For a fabricator, the step from OMF to IMF adds connection prequalification, protected zones and moderately ductile member checks; the step to SMF adds highly ductile members, strong-column weak-beam design and continuity plate and panel zone detailing. Each step adds shop hours, and each step reduces the design force and the tonnage.

Where these frames are common in the United States

OMF single-storey metal buildings are common in every seismic region, from Nevada and Idaho to Tennessee and South Carolina, because they fit the light single-storey exception. IMF frames appear in low and mid-rise commercial and institutional buildings in moderate seismic regions, and in high-seismic regions where heights stay within the ASCE 7 limits. STMF appears where long-span trusses suit the building, for example in sports halls, assembly buildings and industrial structures with open floors.

How to choose

A practical decision path:

  1. Find the SDC and height of the building, and check which moment frame systems ASCE 7 permits.
  2. Check the light single-storey exception. If the building qualifies, OMF is often the most economical, especially for metal buildings.
  3. Compare tonnage and connection cost. Run the frame as OMF, IMF and SMF and compare the steel weight against the cost of prequalified connections, demand-critical welds and inspection.
  4. Consider drift. Lower-R systems produce smaller elastic drifts, but drift limits often govern SMF member sizes anyway. Sometimes the drift-governed SMF is no lighter than an IMF.
  5. Think about fabrication and shipping. Prequalified bolted end-plate connections, available for IMF and SMF in AISC 358, avoid field welding, which matters when steel is fabricated overseas.
  6. Look at long spans. If truss girders make sense, STMF may beat a solid-beam frame.

How World Steel designs and fabricates OMF, IMF and STMF

World Steel designs and fabricates steel moment frames for US projects in its own IAS AC472-accredited plant in Vietnam, from light single-storey portal frames to heavy multi-storey frames. On seismic work we design to the AISC 341-22 section for the system the Engineer of Record selects: OMF connections for 1.1 Ry Mp or the permitted alternatives, IMF connections from AISC 358 with moderately ductile members and protected zones, and STMF special segments detailed and fabricated exactly to their limits. We compare the options with the Engineer of Record when asked, through our design optimization service.

Our shop drawings, included at no extra cost, show the system, the demand-critical welds and the protected zones; our welding procedures and welders are qualified to AWS D1.8; and every frame can be followed in PEB Studio. The Engineer of Record reviews and approves the design, and the US contractor, our customer, sets the frames on site.

The next article climbs to the top rung: the special moment frame and what changed for it in AISC 341-22.

Quick answers

What is the difference between an ordinary and an intermediate moment frame?

An ordinary moment frame (OMF) is designed for a higher seismic force, R = 3.5, and is expected to yield very little. An intermediate moment frame (IMF), R = 4.5, must sustain story drift angles of 0.02 radian, so it needs proven connections and more detailing.

Can a metal building use an ordinary moment frame in a high seismic area?

ASCE 7 permits OMF in Seismic Design Categories D and E for light single-storey buildings within height and weight limits. Many metal buildings use this path, designed to AISC 341 Section E1.

What is a special truss moment frame?

A special truss moment frame (STMF), R = 7, is a frame whose truss girders have a special segment near mid-span designed to yield in shear or flexure, while the rest of the truss and the columns stay elastic.

Do IMF connections have to be prequalified?

Yes. IMF beam-to-column connections must be prequalified, typically under AISC 358, or qualified by cyclic tests under Chapter K, for a story drift angle of at least 0.02 radian.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 341-22 seismic design series

Twenty in-depth articles on the 2022 Seismic Provisions for Structural Steel Buildings: what each chapter asks of the design, the drawings, the shop and the inspector, and how World Steel engineers and fabricates seismic steel to it for US projects.

Chapter D
Members and connections

Ductile sections, bracing, protected zones, joints, splices and bases.

Chapter E
Moment frames

OMF, IMF, STMF, SMF and the cantilever column systems.

Chapter F
Braced frames and walls

Concentric and eccentric bracing, buckling-restrained braces, plate walls.

Chapters G–H
Composite systems

Steel and concrete working together, including the new CC-PSW/CF.

Chapters I–K
Fabrication, QA and testing

Shop and site rules, quality control and assurance, cyclic tests.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.