Stiffened heavy plate girders resting on shop supports

Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Complete joint penetration

CJP groove welds prepared, welded and tested through the full joint thickness

Moment connections, flange splices and plate splices, welded to qualified AWS D1.1 procedures with a planned root, in a plant that fabricates 2,500 metric tons of structural steel a month.

Full penetration, full strength

A CJP groove weld fuses the whole thickness of the joint

A complete-joint-penetration groove weld fills a prepared groove so that weld metal and base metal are fused through the full thickness of the thinner part. Made with matching filler metal, it develops the strength of the part it joins, which is why moment connections, flange splices and plate splices use it. It is also the weld that takes the most preparation, the most skill and the most testing.

A CJP weld is only as good as its root. Every one we make has a plan for the root: a backing bar, or welding from both sides with a back-gouge to sound metal.

Operator at the control panel of an automatic beam welding line, a built-up beam in front Photo
Running the automatic beam line from its control panel, World Steel in Vietnam.

Sections through the joint

Six groove preparations for a complete-penetration weld

AWS D1.1 lists prequalified CJP joints by type, with root opening, root face and groove angle ranges for each process. A joint outside those ranges needs a procedure qualified by test.

Section A-A

Single-V, with steel backing

Butt joints welded from one side: flange and plate splices.

Section B-B

Double-V, back-gouged

Thick butt joints welded from both sides, less weld metal and less distortion.

Section C-C

Single-bevel T-joint

Beam flange to column face and continuity plates, on backing or back-gouged.

Section D-D

Double-bevel T-joint

Heavy stiffeners and plates welded from both sides.

Section E-E

J-groove

Thick plate where a curved root saves weld metal over a bevel.

Section F-F

U-groove

Very thick butt joints, welded by submerged arc where access allows.

Weld metalBase metalSteel backing

The root plan

Three ways to make sure the root is fused

Lack of fusion at the root is the defect UT finds most in CJP welds. Each joint on our shop drawings shows which of these it uses.

Steel backing

A backing bar fused into the root lets the joint be welded from one side. It stays in place unless the design or the seismic rules say remove it.

Common on flange splices and T-joints

Back-gouge to sound metal

The first side is welded, the root is gouged from the second side by air carbon arc or grinding until sound weld metal shows, then welded.

Common on double-V and double-bevel joints

Spacer

A strip of steel in a double-sided joint keeps the root opening, and is gouged out before the second side is welded.

Used where the joint detail calls for it

From bevel to UT

Nine stops on the way to a finished CJP weld

Each stop is in the WPS or the Inspection and Test Plan. Several can be hold points for your inspector.

Bevel

Groove cut by CNC flame or plasma and ground clean to the angle and root face on the shop drawing.

Fit-up

Root opening, alignment and backing contact checked with a hi-lo gauge before any tack.

Preheat

Steel heated to the minimum for its grade and thickness, measured with a contact thermometer.

Root pass

The critical first pass, fusing both groove faces and the backing.

Fill and cap

Passes laid to the WPS, with interpass temperature and cleaning between passes.

Back-gouge

Second side gouged to sound metal and checked before welding, where the joint is double-sided.

Tabs and backing

Weld tabs removed and ground, and backing removed where the design or AISC 341 requires it.

Visual testing

Profile, reinforcement, undercut and cracks checked by our QC on the finished weld.

Ultrasonic testing

UT or PAUT where the code or your specification calls for it, after the required waiting time.

Fitter comparing a built-up beam with its shop drawing Photo
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Two welders operating a submerged-arc welding station on a member Photo
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Fitter grinding a cut steel edge, sparks flying, on the shop floor Photo
Cut edges are dressed before fit-up, World Steel plant in Vietnam.
CJP groove weld Access holeradius 10 mm (3/8 in) min. Beam flange Beam web Column

Weld access holes

A hole in the web so the flange weld can run through

Paraphrased from AISC 360 Section J1.6. A rough or notched access hole is where cracks start, so its shape is controlled as tightly as the weld.

  • Size

    At least 1.5 times the web thickness or 38 mm (1-1/2 in) long, and tall enough to deposit sound weld through the hole.

  • Radius

    A smooth curved transition, at least 10 mm (3/8 in) radius, with no notches or sharp corners.

  • Finish

    Thermally cut surfaces ground smooth on heavy shapes, and MT or PT checked where the code calls for it.

How much is tested

Four numbers that set how many CJP welds get UT

Code-minimum UT under AISC 360 is a quality assurance task for the agency working for the owner; it can test in our plant at our hold points. Your specification may add fabricator UT, PAUT or RT.

8 mm

(5/16 in) and thicker

AISC 360 Chapter N asks for UT of CJP welds in butt, T- and corner joints under transversely applied tension from this thickness.

100%

Risk Category III and IV

All such welds in buildings of higher risk category, by the quality assurance agency.

10%

Risk Category II

Of such welds, with the rate raised or lowered on the results.

48 h

on some steels

A waiting time before final inspection on quenched and tempered grades, so delayed cracking is caught.

On our floor

Where CJP welds go on the members we ship

The Engineer of Record decides which joints need full penetration. These are the ones we weld most.

Beam flange to column

Moment connections, often demand-critical in seismic frames.

Flange and web splices

Shop splices of plate girders and long built-up members.

Continuity plates

Where they carry flange forces into the column.

Column splices

Where the design needs full strength in tension.

Column to base plate

Moment bases and heavily loaded columns.

Box columns

Corners in the panel zone, where PJP is not enough.

Questions

CJP groove welds: questions from US reviewers

What does CJP mean on a weld symbol?

Complete joint penetration. It is usually written in the tail of the symbol, so the fabricator chooses a prequalified or qualified joint detail that achieves full penetration, and shows it on the shop drawings for your approval.

Do you leave backing bars in place?

Where the design allows it, yes. Backing is removed where the design or AISC 341 requires it, for example at the bottom flange of some seismic moment connections, then the root is gouged, welded and reinforced with a fillet.

Who performs UT on CJP welds?

Code-minimum UT under AISC 360 is a quality assurance task for the agency working for the owner, which can test in our plant. Where your specification assigns UT to the fabricator, our QC performs it, or the third party you designate.

Why are some CJP welds tested days after welding?

Some high-strength steels can crack hours after welding. Final inspection of those welds waits for the time the code sets, so a late crack is still found in the shop.

Is a CJP weld always stronger than a PJP weld?

It develops the full strength of the part, so in tension across the weld it is. Where the full strength is not needed, a PJP weld is often the better choice: less weld metal, less heat, less distortion and no back-gouging.

What filler metal do you use for CJP welds?

Filler metal that matches the base metal strength, as the WPS names it. For demand-critical welds in seismic frames it also meets the notch toughness required by AWS D1.8.

Can my inspector watch a CJP weld being made?

Yes. Fit-up, root pass, back-gouge and final weld can be hold points in the Inspection and Test Plan, witnessed in person or live by video.

Send us your moment connection details

We will show the groove preparation, root plan and testing for every CJP weld in our quote, from a plant that fabricates 2,500 metric tons a month.