Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Built-up sections · Cruciform columns

Cruciform columns: strong both ways, open on all four sides

A cruciform column is an I-section with a tee welded to each side of its web, so it reads as a cross in plan. It brings the two-axis strength of a box column while keeping every flange open, so beams bolt on from four directions without working inside a closed section. It also suits columns that will be encased in concrete. We weld cruciform columns from plate to your Engineer of Record’s design.

Cross-section of a cruciform column: a welded I-section in the middle and a tee welded to each side of its web, giving four open flanges I-sectionTeeTee Tee-to-web welds
Drawing for illustration, not to scale.

Why cruciform

Four reasons engineers pick a cross

Strong on both axes

Two webs at right angles give similar bending strength in both directions, unlike a single H-section.

Open for bolting

All four flanges stay accessible, so moment and shear connections are bolted from the outside, with no closed cell to work inside.

Made for encasement

The open cross holds reinforcing bars and concrete well, which suits encased composite columns.

Inspectable welds

Every weld is on an open face, so visual and ultrasonic inspection can reach each one.

In our plant

How a cruciform column is built up

One I-section, two tees and a welding order that keeps the column straight.

  1. Cut the plates

    Main web, flanges and the tee plates are cut on CNC laser, plasma or gas machines, laser up to 100 mm (about 4 in) thick.

  2. Weld the main I-section

    The main web and flanges are welded by submerged arc on the automated beam line or gantry welder.

  3. Make the two tees

    Each tee, a flange and a short web, is welded the same way.

  4. Fit the tees to the web

    The tees are set square on each face of the main web in a jig and checked against the shop drawing.

  5. Weld in a balanced order

    Tee-to-web welds are run in a sequence that balances heat on both sides, to keep the column straight.

  6. Measure and inspect

    Straightness, twist and squareness are measured, every weld is checked visually and NDT is added where specified.

Welder looking over the stiffeners and end plate of a heavy column
Operator checking web and flange plates set in blue H-beam assembly jigs
Two welders operating a submerged-arc welding station on a member

Welding, assembly jigs and submerged arc welding in the World Steel plant, Vietnam.

Where they go

Cruciform columns on large US structures

Two-way moment frames

Interior and corner columns where moment beams arrive on both axes.

Encased composite columns

Steel cores for concrete-encased columns designed to AISC 360 Chapter I.

Heavy industrial nodes

Columns at the meeting point of heavy trusses, bracing and crane girders.

Transfer levels

Columns that pick up heavy loads from more than one direction at a transfer floor.

Need strength in torsion or a concrete-filled column instead? Compare with welded box columns.

Questions

Cruciform column questions

What is a cruciform column made of?

Usually one welded I-section and two welded tees. The tees are welded to each face of the I-section web, so the column reads as a cross in plan with four flanges.

Is a cruciform column better than a box column?

Each has its place. A box column is stronger in torsion and can be filled with concrete. A cruciform column keeps every face open for bolting and inspection and suits concrete encasement. Your Engineer of Record chooses by the frame, the connections and the fire and composite strategy.

How do you keep a cruciform column straight?

By welding the tees in a balanced sequence, on both sides of the web in turn, and measuring straightness and twist before release. Readings go on the dimensional check sheet for each piece mark.

Can cruciform columns be used in seismic frames?

Yes, where your Engineer of Record designs them that way. AISC 341 detailing then applies, with demand-critical welds made to AWS D1.8 by qualified welders.

Do you supply the reinforcement or concrete for encased columns?

No. We fabricate the steel core with any studs, holes or plates your design needs. Reinforcing bars and concrete are site work by the US contractor, our customer.

Built for large jobs

Cruciform columns for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included