Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Stiffened heavy plate girders resting on shop supports

Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Web-to-flange welds

Web-to-flange seams that build plate girders, built-up columns and tapered frames

The longest welds on any steel package, run on automatic submerged arc lines to AWS D1.1, in a plant that fabricates 2,500 metric tons of structural steel a month.

The seam that makes the member

A web-to-flange weld turns three flat plates into one beam

A plate girder, a built-up column or a tapered rafter starts as a web plate and two flange plates. The web-to-flange welds join them along the full length, so the three plates bend as one section. They are the longest welds on any steel package, and most of the tonnage in a large job depends on them. We run them on automatic submerged arc lines, to qualified procedures under AWS D1.1.

Every metre of a built-up member has two to four of these seams. On a 2,500-ton job that is kilometres of weld, so the same settings, fit-up and checks have to hold from the first rafter to the last girder.

Operator checking web and flange plates set in blue H-beam assembly jigs Photo
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.

Built-up I-section

Two flanges, one web, and the seams between them

Section through a welded plate girder. The seams run the full length of the member, on one or both sides of the web.

FlangeWeb Seam DepthFlange width b

Flange

The plate that carries most of the bending, top and bottom.

Web

The plate between the flanges that carries the shear.

Seam

The weld along the web-to-flange joint, one or both sides.

Shear flow

The force per metre the seam passes between web and flange as the member bends.

Three ways to make the seam

Double fillet, PJP with a fillet cap, or CJP

The Engineer of Record sets the weld type and size on the design drawings; our shop drawings show each seam with its symbol for your review and approval. Pre-engineered tapered frames often have a fillet on one side only where the frame design allows it; heavier members get both sides.

Fillet both sides

Double fillet

Most plate girders, built-up columns and rafters. Sized for the shear flow and the AISC 360 minimum for the thinner part joined.

No edge preparation; the web is set square on the flange.

Bevelled web, partial penetration

PJP with fillet cap

Deep or heavy girders where a fillet would have to be very large, and some heavy columns.

Web edge bevelled to the depth on the shop drawing, then welded to the designed throat.

Full penetration, back-gouged or backed

CJP

Crane runway top flanges under heavy cyclic loads, and joints the design needs at full strength.

Ultrasonic testing where the specification calls for it.

AISC 360

What the design checks on every seam

Paraphrased from AISC 360. The Engineer of Record runs these checks; we weld to the size and type on the approved drawings.

VQ/I

Shear flow

The force per unit length between web and flange, from the shear, the flange area and the section. The seam must carry it.

0.60 FEXX

Weld strength

A fillet is counted on its throat at 0.60 times the filler metal strength, checked against the base metal.

Min. size

Thinner part rule

AISC 360 sets a minimum fillet size by the thinner part joined, from 3 mm (1/8 in) on thin plate to 8 mm (5/16 in) over 19 mm (3/4 in), so enough heat goes in.

Wheel load

Local load

Crane wheels and concentrated loads press the flange into the web; the seam or a stiffener carries it.

Fatigue

Cyclic load

Under repeated loads, such as crane runways, AISC 360 Appendix 3 may set a weld detail category and inspection.

Minimum fillet size by the thinner part joined

Up to 6 mm (1/4 in)3 mm (1/8 in)
Over 6 to 13 mm (1/4 to 1/2 in)5 mm (3/16 in)
Over 13 to 19 mm (1/2 to 3/4 in)6 mm (1/4 in)
Over 19 mm (3/4 in)8 mm (5/16 in)

Single-pass welds only; the size shown on the drawing still governs. Paraphrased from AISC 360 Table J2.4.

AWS D1.1

Six code rules that shape a web-to-flange seam

Paraphrased from AWS D1.1, edition-neutral. Our WPS for each seam is prequalified within these rules or qualified by test with a PQR.

Tight fit-up

Parts joined by fillet welds are brought as close as practical. The root opening is limited to about 5 mm (3/16 in), and from about 2 mm (1/16 in) the leg is increased by the gap, or the throat is shown to be met.

Splices before assembly

Flange and web plates are butt spliced with CJP groove welds, ground where needed and inspected, before the web and flanges are welded together.

Single-pass limits

A prequalified WPS limits the largest fillet made in one pass by process, position and number of wires. Larger seams are built up in passes.

Preheat by thickness

Minimum preheat is set by the steel and the thickest part at the joint, and held along the seam.

Run-off tabs

Seams start and stop on tabs where the WPS calls for them, so the ends of the member get full weld.

Member tolerances

D1.1 sets limits for straightness, camber, sweep, web flatness and flange tilt of welded built-up members. Combined flange warpage and tilt is limited to about b/100 or 6 mm (1/4 in), whichever is greater.

On our beam lines

From flat plate to a straight, measured member

The sequence every built-up member follows in our plant. No step is skipped for a tight schedule.

Plates cut and spliced

Web and flange plates are laser or plasma cut, then spliced with CJP welds that are tested before assembly.

H-beam assembly

The web is set on the flanges, checked square and tacked tight in the assembly line.

Twin-head SAW

Automatic heads weld both fillets of a joint at once, so heat goes in evenly and the member stays straight.

Tapered members

On tapered rafters and columns the head follows the sloping flange from knee to ridge.

Straightening

Flange tilt from welding is pressed out and the member is measured against the D1.1 tolerances.

Inspection and record

Weld size, profile and member dimensions are recorded under the piece mark.

Two welders operating a submerged-arc welding station on a member Photo
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Built-up members with welded stiffeners and drilled clip plates on shop supports Photo
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Inspection

How every seam is checked before release

Inspection rates beyond visual are set by your specification and agreed in the Inspection and Test Plan.

Visual testing

Every seam, full length: size with a fillet gauge, profile, undercut, craters and cracks.

Magnetic particle testing

Where the specification calls for it, typically on a percentage of seams or at weld ends.

Ultrasonic testing

On CJP seams, for example crane runway top flanges, at the rate the specification sets.

Dimensional check

Depth, flange tilt, web flatness, camber and sweep measured after straightening.

How it is tested

The NDT methods that check web-to-flange seams

Every weld is visually inspected by our QC. The other methods run where your specification or the code calls for them, by our QC, by the third party you designate, or, for radiography, through our partner.

Questions

Web-to-flange seams: questions from US reviewers

Are web-to-flange welds fillet or groove welds?

Usually double fillet welds. Heavy girders may use PJP groove welds with a fillet cap, and crane runway top flanges under heavy cyclic loads may be CJP. The Engineer of Record sets the type and size.

How is the size of a web-to-flange fillet chosen?

From the shear flow the seam must carry, with the minimum size for the thinner part joined from AISC 360. On most members the minimum size or a little more is enough, which is why seams are often smaller than people expect.

Can a pre-engineered frame have a fillet on one side only?

Yes, where the frame design allows it. Many tapered rafters and columns are welded one side; heavier members and members with local loads get both sides. The shop drawing shows which.

What does AWS D1.1 say about fit-up for these welds?

Parts are brought as close as practical. The root opening of a fillet joint is limited to about 5 mm (3/16 in), and from about 2 mm (1/16 in) the weld leg is increased by the gap, unless the throat is shown to be met.

Are flange and web splices made before or after the seam?

Before. Flange and web plates are spliced with CJP groove welds and inspected first, then the member is assembled and the seams are welded over the full length.

How are the seams inspected?

Every seam is visually inspected along its full length and gauged. MT and UT are added where the specification calls for them, UT mainly on CJP seams such as crane runway top flanges. Member dimensions are checked after straightening.

Send us your girder and frame drawings

We will show the seam size, process and tolerances for every built-up member in our quote, from a plant that fabricates 2,500 metric tons a month.