World Steel USA

Insights · 27 coating guides

Coatings that keep structural steel sound

Find the corrosivity category of every part of your building, pick the paint, galvanizing or duplex system that suits it, and plan fire protection before the steel leaves the shop.

2,500 tper month blasted, coated and inspected in our plant
6 brandsJotun, PPG, Carboline, Hempel, Nippon, International Paint
FROSIO IIIcoating inspectors, plus BGAS
Coated members drying in rows on stands in the paint hall
Steel, blast cleanedSa 2½ surface profile
Zinc-rich primeror hot-dip galvanizing
Epoxy intermediatebarrier build
Polyurethane topcoatcolor and UV
Inspectionfilm thickness, adhesion

Swatch book

ISO 12944 paint system ladder

One guide per corrosivity category, from a heated office to a splash zone.

Choosing the system

Paint, galvanizing or duplex, and how much to apply in the shop.

Latest

New in coatings and durability

Large-project capacity

2,500 t

of structural steel fabricated every month in our own plant in Vietnam

The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.

Our large-project program
  1. Sunpro Steel millSteel mill, crane buildings5,000 t
  2. CPV FoodFood processing plant2,500 t
  3. Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
  4. M&D Warehouse, ThailandWarehouse and factory2,000 t
  5. New EraCold storage1,000 t

Flagship series

Read the full series on its landing page

Questions

Coatings and durability: questions from US contractors

Which paint brands does World Steel use?

Jotun, PPG, Carboline, Hempel, Nippon and International Paint, including their epoxy lines. These are worldwide products, so touch-up material and warranty support are available in any US region.

How do we choose between paint, galvanizing and duplex?

Start from the ISO 12944 corrosivity category and the design life. Interiors at C1 or C2 usually take a shop paint system; exposed steel at C4 or above often justifies galvanizing or a duplex system. The guides on this page walk through each case.

Who inspects the coating?

Our coating inspectors hold FROSIO Level III and BGAS qualifications. Surface preparation, film thickness and adhesion are recorded for each lot in the coating quality records.

Can intumescent fire protection be applied in the shop?

Yes, where the project specifies a shop-applied system. Products used carry UL certification and our painters are trained and certified by the paint manufacturer.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.