Buying structural steel from a fabricator abroad

The procurement file our estimators wish every US general contractor had before the first call: how to qualify an overseas shop, what to send for a firm quote, and where the weeks go between award and jobsite.

2,500 tstructural steel fabricated per month in our own plant
5,000 tlargest single job delivered, Sunpro Steel mill
IAS AC472first and only accredited fabricator in Vietnam

The buyer’s journey

From the first question to the delivery date

Read left to right: decide, qualify, bid, schedule. Each column is one stage of buying structural steel from our plant in Vietnam.

Latest

New in buying structural steel

Large-project capacity

2,500 t

of structural steel fabricated every month in our own plant in Vietnam

The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.

Our large-project program
  1. Sunpro Steel millSteel mill, crane buildings5,000 t
  2. CPV FoodFood processing plant2,500 t
  3. Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
  4. M&D Warehouse, ThailandWarehouse and factory2,000 t
  5. New EraCold storage1,000 t

Questions

Buying structural steel: questions from US contractors

Can a US general contractor buy structural steel directly from World Steel?

Yes. Our customers are US contractors. We design and fabricate the structural steel in our own plant in Vietnam and ship it to the port or jobsite you name. Site work, erection and permits remain your scope.

How large a project can World Steel take?

Our plant fabricates about 2,500 metric tons of structural steel a month, and we have delivered single jobs of 5,000 metric tons (Sunpro Steel mill) and 2,500 metric tons (CPV Food). Several projects move through the shop in parallel.

What should we send to get a firm quote?

Structural drawings or a design brief, the site address, the governing code edition, loads, finish and coating requirements, and any special inspection or seismic welding requirements. The bid package checklist article lists everything.

Do you publish prices?

No. Every package is priced from its own drawings, tonnage, coating and delivery terms. Send the bid documents and our estimators return a scoped quote.

Who approves the drawings and seals them?

Our engineers prepare calculations and drawings for review. Your Engineer of Record approves them and provides any seal the jurisdiction requires.