Pre-engineered metal buildings, frame to purlin

Tapered frames, secondary framing and roof systems designed together: when a pre-engineered building beats conventional steel, which frame suits your span, and how to write a specification every bidder prices the same way.

2,500 tframes, purlins and girts fabricated per month
9 framesclear span, multi-span, mono-slope and arched systems
One packageframe, secondary steel, roof and wall cladding
Tapered portal frame of a pre-engineered metal building, with links to the guides for each part Pre-engineered or conventional Primary frames and trusses Girts and purlins Specifying the building
Long factory building framed with red tapered portal frames and roof purlins

Callouts

Every part of the building system, explained

Frames, secondary steel and cladding are designed together in a pre-engineered building. Read the callouts in order, from the system choice to the specification.

Pre-engineered or conventional

When a metal building system is the right answer.

Girts and purlins

Secondary framing and the extra loads it carries.

Specifying the building

A specification that makes every bid price the same building.

Latest

New in pre-engineered buildings

Large-project capacity

2,500 t

of structural steel fabricated every month in our own plant in Vietnam

The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.

Our large-project program
  1. Sunpro Steel millSteel mill, crane buildings5,000 t
  2. CPV FoodFood processing plant2,500 t
  3. Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
  4. M&D Warehouse, ThailandWarehouse and factory2,000 t
  5. New EraCold storage1,000 t

Questions

Pre-engineered buildings: questions from US contractors

What is a pre-engineered metal building?

A building whose tapered primary frames, cold-formed secondary framing and cladding are designed together as one system, so steel goes only where the loads need it. Our plant fabricates the whole package in Vietnam.

When is conventional steel the better choice?

Heavy crane loads, complex geometry, multi-story framing or concentrated equipment loads often favor conventional or built-up members. Many of our projects combine both.

Which frame types do you fabricate?

Gable clear span, mono-slope, multi-span with one, two or many interior columns, multi-gable, arched roof truss and frames on concrete columns. The steel frame systems page compares them.

Is the building designed to MBMA?

Metal building systems are designed to the code your jurisdiction adopts and the MBMA Metal Building Systems Manual, with calculations ready for your Engineer of Record’s review.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.