Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Coating quality

A coat of paint your site crew will not have to redo

Shop coating is the first thing your owner sees and the first thing to fail if it is rushed. We apply UL-certified coating products with painters the paint manufacturer trained and certified, and we measure every coat before the steel is packed.

  1. Finish coatPolyurethane, color to your schedule
  2. Intermediate coatHigh-build epoxy
  3. PrimerZinc-rich epoxy
  4. Blast profileAnchor pattern for adhesion
  5. Structural steelBlast cleaned, edges ground
Typical three-coat system, drawn for illustration. The system on your job follows your coating schedule.
Coated members drying in rows on stands in the paint hall Photo
Members drying in the World Steel paint hall in Vietnam after coating.

Who applies it

Certified products, certified hands

  • UL-certified products

    The coating products we apply carry UL certification, and the product on your job is the one named in your coating schedule.

  • Painters certified by the maker

    Our painters are trained and certified by the paint manufacturer on the products they spray.

  • Batch numbers on record

    Product batch numbers are recorded with the coat, so any question goes straight to the manufacturer.

Measured, not assumed

Four readings taken before a member is packed

Each reading is recorded against the piece mark, so your inspector sees the number, not just a tick.

Surface cleanliness

Blast cleaning checked against the grade in your specification before any paint goes on.

Blast profile

The anchor pattern measured so the primer has something to grip.

Dry film thickness

Each coat measured against the thickness on the data sheet and your schedule.

Adhesion

Adhesion tested where your specification calls for it, and recorded with the coat.

How the coating check fits the inspection plan: surface prep and coating checkpoint.

Paint hall rules

Cold or damp air stops the spray guns

Most coating failures start with paint applied in the wrong conditions. These limits are checked before each coat.

  • No painting below 4 °C (39 °F) steel or air temperature
  • No painting when the steel is within 3 °C (5 °F) of the dew point
  • Coats cured to the data sheet before handling and packing

Brands we apply

Coating systems your crew can buy anywhere in the US

We apply coating systems from six international brands. Each sells across the United States, so your crew can buy the exact touch-up product near the job and any warranty question goes to a manufacturer with a US presence.

  • JotunNorway
  • PPGUnited States
  • CarbolineUnited States
  • HempelDenmark
  • Nippon PaintJapan
  • International PaintUnited Kingdom
  • Zinc-rich epoxy primers
  • High-build epoxy coats
  • Polyurethane finish coats
  • Epoxy intumescent fire coatings

Brand names are trademarks of their owners and are named only to show the coating systems we apply. No partnership or endorsement is implied. The product on each project is the one named in its coating schedule.

Questions

Questions about shop coatings

Which paint brands do you use?

Coating systems from Jotun, PPG, Carboline, Hempel, Nippon Paint and International Paint, including their epoxy lines. The product on your job is the one named in your coating schedule or specification.

Are your painters certified?

Yes. Our painters are trained and certified by the paint manufacturer, and the coating products we apply carry UL certification.

What do you measure on each coat?

Surface cleanliness and blast profile before painting, dry film thickness on each coat, and adhesion where your specification calls for it. The readings are recorded against the piece mark.

How do we touch up damage after erection?

With the same product named in the coating schedule. Because the brands we use sell across the US, your crew can buy it locally. Touch-up on site is the US contractor’s scope.

Can you apply fire protection coatings?

Yes, epoxy intumescent coatings are among the lines we apply. For fire-rated work, the listed product and thickness named in your design govern.

Do you hot-dip galvanize?

Galvanizing is arranged for members your project specifies as hot-dip galvanized. See the hot-dip galvanizing page for how it is handled.

Send us your coating schedule

We match each system to the brands we apply, confirm the readings your inspector will receive and show how the steel is packed to protect the finish, at a plant that fabricates 2,500 metric tons a month.