Insights · 4 shipping and import guides

From our shop floor to your laydown yard

Four stops on every voyage: how the steel is packed in erection order, how it crosses the Pacific, how it clears US customs, and what your site team checks before the crane arrives.

2,500 tpacked and shipped per month at full plant output
16 portsUS port guides from Los Angeles to New York
ISPM 15treated and stamped wood packaging
Rows of labeled steel bundles ready to leave the plant
  1. World Steel plantVietnam
  2. Pacific crossingcontainer or breakbulk
  3. US port of entryWest, Gulf or East coast
  4. Your jobsiteUS contractor’s scope

Stops on the route

Every stop between our shop and your crane

The guides in voyage order. Bundles leave the plant in erection order with labels that match your drawings, so each stop hands the next one a clean record.

Latest

New in shipping and import

Large-project capacity

2,500 t

of structural steel fabricated every month in our own plant in Vietnam

The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.

Our large-project program
  1. Sunpro Steel millSteel mill, crane buildings5,000 t
  2. CPV FoodFood processing plant2,500 t
  3. Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
  4. M&D Warehouse, ThailandWarehouse and factory2,000 t
  5. New EraCold storage1,000 t

Questions

Shipping and import: questions from US contractors

How is fabricated steel shipped from Vietnam to the US?

In containers for members that fit, and breakbulk or flat racks for long or heavy members. Bundles are packed in erection order with labels that match the packing list and shop drawings.

Which delivery terms do you offer?

Terms are agreed per project under Incoterms, for example FOB, CIF or delivery to a named US port or jobsite. The Incoterms guides explain who handles each leg.

Who is the importer of record?

Normally the US contractor or the owner, depending on the delivery terms agreed. The import regulations guide explains the entry documents and the importer security filing.

What should our site team check on delivery?

Piece counts against the packing list, marks against the erection drawings, coating damage and any shipping damage, recorded before unloading is signed off. The receiving guide has a full checklist.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.