Insights · 3 regional guides
Hazards, codes and ports, region by region
A Gulf Coast warehouse, a California plant and a Midwest distribution center each start from different loads and a different port. Start with the hazard, then open the state page for your site.
Hazard atlas
Start with the hazard, then open your state
Each board pairs a regional guide with the state solutions pages where that hazard usually governs the design. Every state page invites local US contractors to partner with us.
Hurricane uplift
The uplift load path from roof screw to anchor rod, for Gulf and Atlantic coasts.
Hurricane coast: how we design for it →Seismic regions
What changes for the frame from category A to F.
Seismic West: how we design for it →Ports of entry
Matching the US port to the jobsite.
Latest
New in regional guides
Regional guides
Hurricane uplift load path: from roof screw to anchor rod
A steel building on the hurricane coast holds down only as well as its weakest link. This is the hurricane uplift load path, traced from the roof screw to the anchor rod, with what to check at each step.
5 min read · Nov 18, 2026
Regional guides
Seismic design categories A to F: what changes for the steel frame
The seismic design category decides whether a steel frame needs ordinary detailing or the full AISC 341 rules. Here is how it is set and what it changes.
3 min read · Nov 18, 2026
Regional guides
Which US port for imported steel? Matching the port to the jobsite
The nearest port is not always the best one. Transit time, sailing frequency, congestion and the truck leg all decide where imported steel should land.
3 min read · Nov 18, 2026
World Steel products and services
Put these guides to work on your project
Each guide links to the World Steel pages behind it. These are the products and services US contractors use most after reading about regional guides.
Large-project capacity
2,500 tof structural steel fabricated every month in our own plant in Vietnam
The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.
Our large-project program- Sunpro Steel millSteel mill, crane buildings5,000 t
- CPV FoodFood processing plant2,500 t
- Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
- M&D Warehouse, ThailandWarehouse and factory2,000 t
- New EraCold storage1,000 t
Questions
Regional guides: questions from US contractors
Does World Steel design for my state’s code?
Yes. We design to the code edition your jurisdiction adopts, with wind, snow and seismic loads for the site address. Each state solutions page lists the hazards and ports that usually apply.
Which US port is best for my jobsite?
Usually the closest port with a regular service from Vietnam that can handle breakbulk if your members are long. The port guide compares the West, Gulf and East coast options.
Do you work with local contractors in every state?
Yes. Our customers are US contractors. We fabricate the steel and ship it; erection and site work are the local contractor’s scope, and each state page invites local contractors to partner with us.
Do hurricane or seismic regions change the fabrication?
They change the design and sometimes the welding and inspection requirements, for example AWS D1.8 seismic welds or heavier cladding attachments. Our shop holds AWS D1.8-qualified procedures and welders.
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.