Insights · 18 guides by building type

The steel package, building type by building type

A warehouse, a freezer, a steel mill and a data hall ask very different things of the frame. These guides show what changes for each type, and which World Steel packages and solutions fit it.

2,500 tstructural steel fabricated per month
5,000 tSunpro Steel mill, our largest single job
1,000 tNew Era cold storage, fabricated and shipped

Directory

What changes in the frame for each type

Open the type you are bidding. Each panel lists the guides for it, with the matching building packages and solutions further down this page.

Latest

New in project types

Large-project capacity

2,500 t

of structural steel fabricated every month in our own plant in Vietnam

The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.

Our large-project program
  1. Sunpro Steel millSteel mill, crane buildings5,000 t
  2. CPV FoodFood processing plant2,500 t
  3. Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
  4. M&D Warehouse, ThailandWarehouse and factory2,000 t
  5. New EraCold storage1,000 t

Flagship series

Read the full series on its landing page

Questions

Project types: questions from US contractors

Which building types does World Steel fabricate for the US?

Warehouses and distribution centers, cold storage, manufacturing plants with crane bays, steel mills, data centers, hangars, commercial and multi-story buildings, among others. Each building package page lists what is supplied.

What are your largest projects?

Sunpro Steel mill (5,000 t), CPV Food (2,500 t), Long Son oil and gas (2,000 t, more than 56,000 m²), M&D Warehouse in Thailand (2,000 t) and New Era cold storage (1,000 t).

Do you supply overhead cranes with the building?

Yes, on request. We supply overhead cranes with the building together with the runway girders, crane columns and brackets designed for them.

Can you phase steel for a fast-track data center?

Yes. We split the package into phases that follow the energization and fit-out sequence, with shop drawings and shipments released phase by phase.