AISC 341 seismic steel, from the chapters to your jobsite
One reading desk for the Seismic Provisions. Part 1 walks the 2022 edition chapter by chapter; Part 2 follows the same rules into California, Cascadia, New Madrid and the other US regions, the building types they govern and the order that delivers the steel.
Reading board
One category, two parts, every AISC 341 guide
Part 1 follows the provisions in chapter order for the design team. Part 2 starts from the job: the region, the building, the design call and the delivery. Each sheet lists its guides in reading order.
Part 1 · The provisions, chapter by chapter
Chapters A to K of AISC 341-22: basis of design, members and connections, every seismic system, composite systems, fabrication, quality and testing.
Basis of design
Chapters A–CThe 2022 changes, the code stack, materials, drawings, loads and analysis.
- AISC 341-22: what changed for US seismic steel projects7 min
- AISC 341 vs AISC 360: how the seismic steel code stack fits together7 min
- Seismic steel materials: Table A3.1, ASTM A709 and expected strength7 min
- Seismic design drawings: what AISC 341-22 requires on the contract documents7 min
- Overstrength factor, diaphragms and collectors in AISC 341-227 min
- Nonlinear response history analysis for steel: AISC 341-22 Chapter C and Appendix 17 min
Members and connections
Chapter DDuctile sections, bracing, protected zones, joints, splices and bases.
- Width-to-thickness ratio limits for seismic steel members: Table D1.1 explained7 min
- Beam stability bracing and protected zones in seismic steel frames7 min
- Seismic bolted joints and welded joints: AISC 341-22 Section D27 min
- Seismic column splices and column bases: AISC 341-22 Sections D2.5 and D2.67 min
Moment frames
Chapter EOMF, IMF, STMF, SMF and the cantilever column systems.
Braced frames and walls
Chapter FConcentric and eccentric bracing, buckling-restrained braces, plate walls.
- Concentrically braced frames: OCBF vs SCBF under AISC 341-227 min
- Eccentrically braced frames: how the link works under AISC 341-227 min
- Buckling-restrained braced frames under AISC 341-22: braces that yield both ways7 min
- Steel plate shear walls under AISC 341-22: tension fields and boundary elements7 min
Composite systems
Chapters G–HSteel and concrete working together, including the new CC-PSW/CF.
Fabrication, QA and testing
Chapters I–KShop and site rules, quality control and assurance, cyclic tests.
Part 2 · AISC 341 in US practice
The same provisions on real US work: the regions where they govern, the building types they change, the design calls that set tonnage and the route from order to jobsite.
US seismic regions
Where it governsThe West Coast, Alaska, the islands, the Intermountain West, New Madrid and Charleston.
- AISC 341 in California: seismic steel for SDC D, E and F projects8 min
- AISC 341 in Washington and Oregon: steel for Cascadia shaking8 min
- AISC 341 in Alaska: seismic steel that also has to survive the cold8 min
- AISC 341 in Hawaii and Guam: island seismic steel shipped by sea7 min
- AISC 341 in Puerto Rico and the US Virgin Islands: seismic and hurricane steel7 min
- AISC 341 in Utah, Nevada and the Mountain West: Wasatch to the Tetons7 min
- AISC 341 in the New Madrid seismic zone: Memphis, St. Louis and the Mid-South7 min
- AISC 341 in Charleston and the Southeast: the East Coast seismic surprise7 min
- R = 3 or a detailed system? Steel in moderate seismic regions7 min
Building types
What it changesHospitals, schools, warehouses, plants, mid-rise, parking, metal buildings and retrofit.
- Seismic steel for hospitals and essential facilities: Risk Category IV under AISC 3417 min
- Seismic steel for schools, gyms and public buildings under AISC 3417 min
- Seismic steel for warehouses and distribution centers: braces, diaphragms and collectors7 min
- Seismic steel for industrial plants, pipe racks and nonbuilding structures7 min
- Seismic steel for mid-rise offices, labs and residential buildings7 min
- Seismic steel parking structures: long spans, open sides and AISC 3417 min
- Pre-engineered metal buildings in seismic regions: what AISC 341 asks7 min
- Seismic retrofit with new steel frames: AISC 341, AISC 342 and ASCE 417 min
Design decisions
What sets the tonnageChoosing the system, the gravity frame that must follow it, and piles.
Buying and delivery
From order to jobsiteShop drawings, the approved fabricator, overseas sourcing, lead time and site work.
- Seismic shop drawings: what AISC 341 asks the fabricator to show7 min
- The approved fabricator route for seismic steel: IBC 1704.2.5 and AISC 341 Chapter J7 min
- Sourcing AISC 341 seismic steel from an overseas fabricator: the extra checks7 min
- Seismic steel lead time: what takes longer under AISC 341 and how to plan it7 min
- Seismic steel on the jobsite: protected zones, field welds and inspection8 min
Latest
New in aisc 341 seismic steel
AISC 341 seismic steel
AISC 341 in Alaska: seismic steel that also has to survive the cold
Alaska combines the highest seismic hazard in the United States with steel temperatures far below freezing. This article explains how AISC 341 detailing and cold-climate toughness work together for Anchorage, the Mat-Su, the Kenai and remote sites.
8 min read · Nov 29, 2026
AISC 341 seismic steel
AISC 341 in California: seismic steel for SDC D, E and F projects
California is where AISC 341 is not an option but the everyday baseline. This guide follows a California steel job from the Seismic Design Category to the plan checker, the shop and the jobsite, and shows where an overseas fabricator fits.
8 min read · Nov 29, 2026
AISC 341 seismic steel
AISC 341 in Charleston and the Southeast: the East Coast seismic surprise
Charleston, South Carolina, is the only major East Coast city that has lived through a damaging magnitude 7 earthquake. Today its coastal plain, ports and fast-growing manufacturing belt are designed for both earthquakes and hurricanes. Here is how AISC 341 fits.
7 min read · Nov 29, 2026
World Steel products and services
Put these guides to work on your project
Each guide links to the World Steel pages behind it. These are the products and services US contractors use most after reading about aisc 341 seismic steel.
Large-project capacity
2,500 tof structural steel fabricated every month in our own plant in Vietnam
The articles above come from the engineers and inspectors who run these jobs. IAS AC472 accredited, shipped to US ports and jobsites, with production tracked in real time in PEB Studio.
Our large-project program- Sunpro Steel millSteel mill, crane buildings5,000 t
- CPV FoodFood processing plant2,500 t
- Long SonOil and gas, 56,000+ m² (600,000+ sq ft)2,000 t
- M&D Warehouse, ThailandWarehouse and factory2,000 t
- New EraCold storage1,000 t
Flagship series
Read the full series on its landing page
Questions
AISC 341 seismic steel: questions from US contractors
Where should a general contractor start reading on AISC 341?
Start with Part 2 if you are pricing a job: the region guide for your site, then the building type and the buying and delivery guides. Hand Part 1 to your engineering team; it follows the 2022 provisions chapter by chapter, from the basis of design to cyclic testing.
Is AISC 358 part of this category?
No. AISC 358 is a separate standard for prequalified moment connections, so its 20 articles sit in Engineering and codes and on the AISC 341 and 358 page. The AISC 341 guides link to it wherever a moment connection is chosen.
Does World Steel fabricate seismic force-resisting systems to AISC 341-22?
Yes. We fabricate moment frames, braced frames, link beams and their connections to the AISC 341 edition your contract documents name, with AWS D1.8 procedures and welders, protected zones marked on the shop drawings and QC records your special inspector can review.
Who designs the seismic system and seals the drawings?
The Engineer of Record chooses the system and stamps the design. We prepare calculations, connection design when it is delegated and shop drawings for that engineer to review. Site work and erection remain the US contractor’s scope.
How large a seismic steel package can you supply?
Our own plant fabricates about 2,500 metric tons of structural steel a month, and our largest single job was 5,000 metric tons for the Sunpro Steel mill. Seismic packages ship to US ports in sequence with the erection plan.
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.