For a steel fabricator, few US markets combine as many demands as Hawaii and Guam. Both are US jurisdictions that build to the International Building Code and ASCE 7. Both have real seismic hazard, typhoon or hurricane winds, salt air that attacks bare steel within months, and supply lines that run thousands of kilometers across the Pacific. A steel package for an island project has to satisfy the AISC 341 provisions where they apply, survive the wind and the sea air, and arrive complete, because a missing piece cannot be fetched from a service center down the road.
Hawaii: hazard that changes island by island
Hawaii's earthquakes come mostly from the volcanoes themselves and the flanks that slide seaward under their weight. The Island of Hawaii carries the highest hazard. The 1868 Ka'u earthquake is estimated near magnitude 8, the 1975 Kalapana event reached 7.7, the 2006 Kiholo Bay earthquake reached 6.7 and damaged buildings on the Kona side and as far as Oahu, and the 2018 Kilauea eruption came with a magnitude 6.9 flank earthquake.
Hazard decreases to the northwest along the island chain. Under ASCE 7, many Big Island sites fall in Seismic Design Category D, and some in SDC E. Maui County sites are often in SDC C or D. Oahu and Kauai are generally lower, often SDC B or C for ordinary buildings, though essential facilities and soft-soil sites can move up. The practical result is that a Hilo or Kona project is usually an AISC 341 project, while a Honolulu warehouse may be designed under the R = 3 route that ASCE 7 Section 14.1.2.2.1 allows in SDC B and C, as the User Note in Section A1 of AISC 341 describes.
Each county adopts and amends the IBC, so Hawaii County, Maui County, the City and County of Honolulu and Kauai County may differ in amendments and review practice.
Guam: subduction next door
Guam sits on the edge of the Mariana subduction zone, where the Pacific plate dives under the Philippine Sea plate. The 1993 Guam earthquake, magnitude 7.8, damaged hotels and other buildings, and large events have repeated through the twentieth century. Guam's building code is based on the IBC, and its seismic design values place most buildings in a high Seismic Design Category. Military projects on Guam follow the Unified Facilities Criteria, which also reference ASCE 7 and AISC 341.
Guam adds typhoon winds. Super Typhoon Pongsona in 2002 and Typhoon Mawar in 2023 tested buildings across the island. Wind and seismic design both govern parts of the same frame, often in different directions or different members.
When AISC 341 applies on the islands
The deciding questions are the same as on the mainland:
- What is the Seismic Design Category? In SDC D, E and F, AISC 341 governs the seismic force-resisting system (SFRS) of almost every steel building.
- In SDC B or C, is the R = 3 route used? If the design uses a higher R value, the system must be detailed to AISC 341 even in a lower category.
- Are columns in the gravity frame spliced or based in ways AISC 341 covers? Section A1 extends the scope to splices and bases of gravity columns as well as the SFRS.
On many island projects, the answer is that wind governs member strength and seismic governs the detailing. A braced frame may be sized for typhoon forces and still need Section F1 or F2 connection rules, brace slenderness limits and protected zones.
Systems that suit island buildings
Island projects are mostly low-rise and mid-rise: warehouses, harbor sheds, hotels, barracks, schools, clinics, retail and utility buildings. Common choices are:
- Ordinary or special concentrically braced frames (Sections F1 and F2) for warehouses and long buildings, with wall bracing and roof diaphragms.
- Ordinary moment frames (Section E1) for light single-storey buildings within ASCE 7 limits, including pre-engineered metal buildings with tapered frames.
- Special moment frames (Section E3) for hotels, offices and multi-storey buildings with open fronts toward the view or the street.
- Buckling-restrained braced frames (Section F4) for schools, hospitals and essential facilities on the Big Island and Guam.
Diaphragms and collectors matter in island buildings because roof decks must carry both typhoon uplift and seismic in-plane forces. Section B5 asks for collectors and chords to be designed for the overstrength seismic load, which often governs in long warehouses.
Salt air: protection without hurting the seismic design
Most island sites sit within a few kilometers of the shore. Under ISO 12944, exposed or partially enclosed steel there is often C4 or C5. Protection options include:
- Multi-coat paint systems: zinc-rich epoxy primer, epoxy intermediate and polyurethane topcoat, applied in the shop with dry film thickness checked and recorded.
- Hot-dip galvanizing to ASTM A123, alone or as a duplex system with paint over the zinc.
- Stainless or galvanized fasteners, and careful detailing to avoid water traps and crevices.
Coatings interact with seismic detailing in two places. First, faying surfaces of slip-critical bolted joints in the SFRS must meet the slip class shown on the drawings; paint systems over faying surfaces must be qualified for that class or masked. Second, protected zones under Section I2.1 must stay free of welded attachments added later for signs, lights or cladding. Planning attachments in the shop, outside the protected zone, avoids field welding through a finished coating, which is bad for both the seismic and the corrosion design.
Shipping to the islands
Steel reaches Honolulu, Hilo, Kahului, Nawiliwili and Apra Harbor by sea. From Vietnam, Guam is one of the closest US destinations. Island logistics reward a fabricator that:
- Packs in erection order, so the first containers or breakbulk lots carry anchor rods, columns and the first bays.
- Ships complete, with bolts, washers, embedded items and touch-up paint matched to the packing list. A missing bolt box can stop a site for weeks.
- Protects coatings in transit with wrapping, dunnage and stacking that keep salt water and abrasion away.
- Times shipments to the site's laydown space, which is often small on island projects.
A worked example: the FPI Barracks on Guam
World Steel supplied the FPI Barracks, a two-storey steel building on Guam of about 120 tonnes, as a complete building package. The scope included structural design with seismic design, the structural calculation report, detailed permit drawings, shop drawings, fabrication and CIF delivery to Guam, all within 60 days from the start of design to delivery. Supply covered the steel structure, floor decking, anchor bolts, roof and wall panels, insulation and the finishing trims and accessories.
The project shows what island buyers value most: one supplier responsible for a coordinated package, designed for the island's seismic and wind conditions, and delivered complete on a fixed schedule.
Proof across the Pacific islands
The FPI Barracks is not a one-off. World Steel has shipped steel to Pacific islands for years, and each job tested the same things an island contractor worries about: design for the island's own loads, protection against the sea, and a package that arrives complete.
- Cost U Less Supermarket, Guam (2023). A pre-engineered steel retail building, engineered and fabricated at our plant in Vietnam and shipped to Guam. It is our clearest island retail reference.
- UR Warehouse, Guam (2019). A pre-engineered steel warehouse designed, fabricated and shipped to the island as one package.
- Kosrae Hospital, Federated States of Micronesia. About 200 tonnes of hot-dip galvanized structural steel for a hospital, designed, fabricated and shipped from Vietnam to one of the most remote islands in the Pacific. A hospital frame on a small island is a stress test of completeness: there is no local steel stockist to cover a missing member.
Behind these projects is a plant built for this kind of work: a 20,000 m² factory with more than 300 people, laser machines that cut and drill plate up to 100 mm thick, IAS AC472 accreditation since 2019 with two audits a year, and ISO 3834-2 welding quality certification from Bureau Veritas. Island customers can watch hold points remotely or send their own inspector to the plant.
A short checklist for island seismic steel
- Confirm the Seismic Design Category for the exact island and site, and whether AISC 341 or the R = 3 route applies.
- Check whether wind or seismic governs each element, and keep the AISC 341 detailing even where wind governs strength.
- Choose the coating system for the ISO 12944 category of the site and coordinate it with faying surfaces and protected zones.
- Plan packing and shipping for the port of entry, the laydown space and the erection sequence.
- Ask for a complete supply list, including bolts, embeds and touch-up materials.
How World Steel supports Hawaii and Guam projects
World Steel designs and fabricates structural steel for US contractors in its own plant in Vietnam, the first and only IAS AC472 accredited fabricator in the country. For Hawaii and Guam we design to AISC 360 and AISC 341-22 where they apply, check typhoon and hurricane wind alongside seismic loads, and prepare the calculation report and shop drawings at no extra cost.
Welders and procedures are qualified to AWS D1.8 where the SFRS requires it, coatings from Jotun, PPG, Carboline, Hempel, Nippon or International Paint are applied by painters trained by the manufacturer and checked by FROSIO Level III inspectors, and materials are tested at ILAC-accredited laboratories. With 2,500 t of fabrication capacity a month and tracking in PEB Studio, we ship complete packages to the islands. The Engineer of Record approves the design and the US contractor, our customer, carries out the site work.
For Hawaii detail see Big Island seismic design and Hawaii salt air corrosion. The next article moves to the Caribbean: Puerto Rico and the US Virgin Islands.
Quick answers
Which Hawaiian islands have the highest seismic hazard?
The Island of Hawaii (the Big Island) has the highest hazard, from volcanic and flank earthquakes such as the 2006 Kiholo Bay and 2018 Kilauea events. Maui County is next, and Oahu and Kauai have lower but not negligible hazard, so the Seismic Design Category must be checked for each site.
Is Guam a high seismic region?
Yes. Guam sits next to the Mariana subduction zone and has felt large earthquakes, including the 1993 magnitude 7.8 event. Many Guam buildings are designed in a high Seismic Design Category and also for typhoon winds.
Has World Steel supplied seismic steel to Guam?
Yes. The FPI Barracks, a two-storey seismic-designed steel building of about 120 tonnes, was designed, fabricated and delivered CIF to Guam by World Steel in 60 days from the start of design.
How is island steel protected against corrosion?
With a coating system chosen for the ISO 12944 corrosivity category of the site, often C4 or C5 near the shore, such as zinc-rich epoxy primer, epoxy intermediate and polyurethane finish, or hot-dip galvanizing with a duplex paint system.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Seismic steel structuresSDC D to F framing we fabricate for US jobs
- Seismic regionsWhere seismic design governs in the US
- California seismic designThe everyday AISC 341 market
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors