Schools carry a special weight in seismic design. They hold large numbers of children for most of the day, they often serve as community shelters after a disaster, and their failures are remembered: the 1933 Long Beach earthquake, which wrecked school buildings that were empty only because it struck in the early evening, led California to pass the Field Act and create state review of school construction. Today, schools across the US are designed for higher seismic forces than ordinary buildings, and in high seismic regions their steel frames follow the AISC 341 provisions. This article explains what that means for school buildings, gyms and other public buildings, and what contractors should expect from the steel supplier.
Risk Category III and what it changes
Under ASCE 7 and the IBC, most schools are Risk Category III: elementary and secondary schools with more than 250 occupants, colleges and adult education buildings with more than 500, and other buildings where large numbers of people gather. Schools designated as emergency shelters, and some public safety buildings, are Risk Category IV.
Risk Category III applies a seismic importance factor of 1.25, raising design forces by a quarter, and tightens the allowable story drift compared with ordinary buildings. It can also move a building to a higher Seismic Design Category: a school on a site that would be SDC C for an office might be SDC D. In SDC D, the R = 3 route that ASCE 7 Section 14.1.2.2.1 allows in SDC B and C, described in the User Note of AISC 341 Section A1, is closed, and the seismic force-resisting system must be an AISC 341 system.
State review of school construction
Some states review school structures centrally:
- California requires Division of the State Architect (DSA) approval for public K–12 schools and community colleges, with a DSA-approved inspector of record, a testing laboratory and detailed documentation of materials, welding and inspection.
- Washington, Oregon and Utah have state programs and seismic safety initiatives for schools, including assessments of existing buildings and funding for replacements in high hazard areas.
- Other states rely on local building departments but often add district standards that set systems, finishes and inspection.
In every case, the drawings must show what AISC 341 Section A4 requires: SFRS designation, demand critical welds, protected zones and material specifications. Reviewers increasingly expect protected zones and demand critical welds to be identified not just in the notes but on the framing plans and details.
Classroom wings: braces in the walls
Classroom wings are usually one to three storeys, with repeated classrooms along corridors. Walls between classrooms and along corridors give natural places for braced frames:
- Buckling-restrained braced frames (Section F4) are a favorite for schools in California and the Northwest. They are stiff, their behavior is stable and predictable, and their connections are smaller than those of conventional braces.
- Special concentrically braced frames (Section F2) are economical where walls can hold a chevron or X-brace pattern and the drift limits are met.
- Ordinary concentrically braced frames (Section F1) can be used in lower categories or within the ASCE 7 limits for light buildings.
The floor and roof diaphragms, typically concrete on metal deck for floors and metal deck for roofs, carry seismic forces to the braced frames. Section B5 of AISC 341 requires collectors and their connections to be designed for the overstrength seismic load.
Gyms, multipurpose rooms and auditoriums
The large rooms are where school steel gets interesting. Gyms, multipurpose rooms, cafeterias and auditoriums need clear spans of 25 to 40 m (80 to 130 ft) and tall walls with few interior supports. Their roofs use long-span steel girders, trusses or joists, and their walls are often tall and heavy.
Seismic design challenges include:
- Few places for bracing. Large window walls, stage openings and bleachers leave limited wall length for braced frames, so special moment frames (Section E3) or ordinary moment frames (Section E1) within ASCE 7 limits appear around openings.
- Flexible diaphragms over long spans. Long roof diaphragms deflect more, and their chords and collectors must be continuous and well connected.
- Tall walls out of plane. Heavy masonry or concrete walls need anchorage to the roof diaphragm for out-of-plane seismic forces, which loads roof steel and its connections.
- Suspended loads. Basketball backstops, scoreboards, stage rigging and lighting hang from roof steel and must be braced for seismic forces.
Roof trusses and girders in these rooms are usually part of the gravity system, but their connections to columns that form part of moment frames, and any truss used as part of a special truss moment frame under Section E4, follow AISC 341.
Modular classrooms and phased campuses
Many districts now build in phases: a new classroom wing while students use the old one, a gym replacement during a summer, a science block added to a campus already full. Steel suits phased work because members are fabricated off site and assembled quickly, but each phase must work as its own structure or connect to the previous one in a way the Engineer of Record has designed. A seismic joint between phases, with its own braced frames on each side, keeps the design simple and lets each phase be permitted and inspected independently.
Repetition helps too. A classroom wing with identical bays and identical braced frames can be detailed once and fabricated many times, which lowers drawing time and lets the shop run brace connections, gusset plates and beams as production lines. Districts that standardize their school designs across several campuses see the benefit again on each new school, because the steel package, its connections and its inspection records are already proven.
Protected zones in a building full of services
Schools are dense with services: ductwork, sprinkler piping, data cabling, lighting, ceilings and acoustic panels. Section I2.1 of AISC 341 forbids welded, bolted or screwed attachments, and power-actuated fasteners for facades, partitions, ducts and piping, in protected zones unless the Engineer of Record approves them. Protected zones in schools sit at the ends of moment frame beams, in brace connection regions and in BRB connection zones, often right where services want to hang.
The cure is coordination. Shop drawings that show protected zones clearly, support clips placed in the shop outside those zones, and markings on the steel itself help the US contractor and the trades on site keep their supports where they belong.
Schedules that cannot move
School construction runs on the school calendar. Many projects must be enclosed before winter or complete before the first day of school, and modernization work often happens in summer while buildings are empty. Steel helps: the frame can be fabricated in parallel with site work and foundations, delivered in erection order and assembled in weeks.
That works only if the steel package arrives complete and on time. A fabricator with spare capacity, a drawing office that can turn approval comments quickly, and packing in the erection sequence takes risk off the school calendar.
Public buildings beyond schools
The same considerations apply to many public buildings: libraries, community centers, recreation centers, civic halls and courthouses. Many are Risk Category III because of their occupancy; some are designated shelters and therefore Risk Category IV. Recreation centers combine gyms, pools and meeting rooms, each with its own structural challenge. Pools add corrosion: chloramine-laden air attacks steel, so coatings must be chosen for the environment, and connections detailed to avoid moisture traps.
Proof for school and public building programs
World Steel already frames the building types school and public programs need. Our plant has fabricated multi-storey college and civic buildings, including the 3-storey College of Medicine in the Philippines, community centers such as the North West Community Center and the Barfoot MWR Facility Community Center for US customers, and sports and recreation halls with long-span roofs. Our sports facilities and indoor arenas and community and recreation halls packages cover the long-span rooms schools need.
On the seismic side, the seismic-designed FPI Barracks on Guam, delivered in 60 days from the start of design, shows how fast a complete seismic package can move. Our welders and procedures are qualified to AWS D1.8, our plant holds IAS AC472 accreditation since 2019 and ISO 3834-2 certification from Bureau Veritas, and all materials are tested at ILAC-accredited ISO/IEC 17025 laboratories. School district inspectors and DSA-style inspectors of record can witness hold points in person or remotely.
A checklist for school steel
- Confirm the Risk Category (III or IV for shelters) and the resulting Seismic Design Category.
- Identify any state review, such as DSA in California, and its inspection and documentation requirements.
- Locate braced frames and moment frames early, especially around gyms and large openings.
- Coordinate suspended loads, services and attachments with protected zones.
- Plan fabrication and delivery around the school calendar.
How World Steel supports school and public projects
World Steel designs and fabricates structural steel for US contractors in its own plant in Vietnam, the first and only IAS AC472 accredited fabricator in the country. For schools and public buildings we design to AISC 360 and AISC 341-22 with Risk Category III or IV loads, prepare the calculation report and shop drawings at no extra cost, and show SFRS members, demand critical welds and protected zones on the drawings.
Welding, inspection and test records are compiled by piece mark for the inspector of record, and every piece can be tracked in PEB Studio. The Engineer of Record approves the design and the US contractor, our customer, carries out the site work. The next article turns to the largest steel buildings by area: warehouses and distribution centers.
Quick answers
What Risk Category is a school?
Elementary and secondary schools with more than 250 occupants, colleges with more than 500 and many public assembly buildings are Risk Category III, with a seismic importance factor of 1.25. Schools designated as emergency shelters are Risk Category IV.
Who reviews school structures in California?
The Division of the State Architect (DSA) reviews public K–12 schools and community colleges, with its own project inspector, testing laboratory and documentation requirements.
Which steel systems suit school buildings?
Buckling-restrained and special concentrically braced frames for classroom wings, special or ordinary moment frames around large openings, and long-span roof girders or trusses for gyms and multipurpose rooms.
How can steel help school schedules?
Steel framing can be fabricated while foundations are built, delivered in erection order and assembled in a few weeks, which helps meet fixed summer windows and school-year openings.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Seismic steel structuresSDC D to F framing we fabricate for US jobs
- Seismic regionsWhere seismic design governs in the US
- California seismic designThe everyday AISC 341 market
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors