On the evening of 31 August 1886, an earthquake estimated at about magnitude 7 struck near Charleston, South Carolina. It destroyed or damaged most of the city's buildings, broke railroads, opened sand craters across the coastal plain and was felt from Cuba to Canada. It remains the largest historical earthquake in the southeastern United States, and it is the reason a warehouse at the Port of Charleston today may need AISC 341 detailing while a similar warehouse in Atlanta does not. This article explains where the provisions govern in the Southeast and how steel is designed and supplied there.
The 1886 source and the coastal plain
Geologists still debate the exact fault behind the 1886 earthquake, but sand blows preserved in the coastal plain show that large earthquakes have struck the Charleston area repeatedly over the last several thousand years. The national seismic hazard model includes a Charleston source with large characteristic events.
The hazard is concentrated by the ground. Charleston, Mount Pleasant, North Charleston, Summerville and the Lowcountry sit on soft, young coastal sediments and old marsh deposits. These soils amplify shaking and were widely liquefied in 1886. Under ASCE 7, many Charleston-area sites are Site Class D or E, and the combination of the source and the soils places much of the region in Seismic Design Category D for ordinary buildings, with higher demands for essential facilities.
Farther inland, hazard drops quickly. Columbia, Greenville, Savannah and much of Georgia sit in SDC B or C for many sites, though soft soils and Risk Category can move a building up.
Other seismic areas in the Southeast
- East Tennessee seismic zone, from northeast Alabama through east Tennessee to southwest Virginia, one of the most active zones in the eastern US for small earthquakes, with evidence of larger prehistoric events. Knoxville and Chattanooga sit near it.
- Central Virginia, where the 2011 Mineral earthquake, magnitude 5.8, damaged the Washington Monument and the National Cathedral and was felt along most of the East Coast.
- The New Madrid zone to the west, which affects western Tennessee and Kentucky and is covered in the previous article.
In most of these areas the SDC is B or C, and the R = 3 route of ASCE 7 Section 14.1.2.2.1, described in the User Note of AISC 341 Section A1, may be used. Near Charleston, it usually cannot.
What SDC D means for a Lowcountry building
In SDC D, the seismic force-resisting system (SFRS) of a steel building must be one of the systems in AISC 341 and ASCE 7, within its height limits. For the region's typical buildings, that usually means:
- Ordinary or special concentrically braced frames (Sections F1 and F2) for warehouses, distribution centers and manufacturing plants. ASCE 7 allows ordinary braced frames in SDC D only within specific height and roof weight limits; beyond them, SCBF is the usual choice.
- Buckling-restrained braced frames (Section F4) for schools, hospitals and mid-rise buildings in Charleston and Mount Pleasant.
- Special moment frames (Section E3) for offices, hotels and mixed-use buildings where open frontage matters, including the downtown peninsula's height-limited infill projects.
- Pre-engineered metal buildings designed as ordinary or intermediate moment frames within the limits ASCE 7 sets for SDC D.
For each, the structural design documents must show what AISC 341 Section A4 asks: SFRS designation, demand critical welds, protected zones and material specifications.
Hurricanes on the same building
Charleston has also been hit by Hugo in 1989 and many weaker storms. ASCE 7 basic wind speeds along the South Carolina and Georgia coast are high, and the Lowcountry includes wind-borne debris regions. Wind usually governs roof framing, purlins and girts, cladding and its fasteners, and uplift at columns and anchor rods. Seismic design governs the detailing of the SFRS.
The two loads meet at the column base. Hurricane uplift and seismic overturning both pull on anchor rods, and Section D2.6 of AISC 341 requires SFRS column bases to develop the forces the frame can deliver, not just the forces from the analysis. Base plates, anchor rods and embedment must be designed for both, coordinated with the foundation, which on soft coastal soils is often piled.
Coastal steel also needs corrosion protection suited to ISO 12944 C4 or C5 exposure near the harbor and the beaches. Coatings must be coordinated with slip-critical faying surfaces in the SFRS and with protected zones, which should stay free of later field-welded attachments.
Diaphragms, collectors and long buildings
The region's logistics boom, around the Port of Charleston, the inland port at Greer, the I-26 corridor and Savannah's Georgia Ports terminals, has produced some of the largest distribution buildings in the country. In a building several hundred meters long, the roof diaphragm and its collectors carry the seismic load to relatively few braced frames.
Section B5 of AISC 341 requires collectors and their connections to be designed for the overstrength seismic load. Collector connections at the braced frames are often the heaviest joints in the building and benefit from careful shop detailing: full-strength bolted splices, accurate holes and gusset plates cut on numerically controlled equipment.
Port structures on soft ground
The Port of Charleston's Wando Welch, North Charleston and Hugh K. Leatherman terminals, and the Garden City terminal in Savannah, are surrounded by warehouses, transload buildings, maintenance shops and equipment structures built on dredge fill and marsh soils. These are the sites where the 1886 earthquake caused the most ground failure, and where the design spectrum is highest.
Port-side steel buildings often combine several demands: a high site class, deep piled foundations, hurricane wind with debris exposure, C5 marine corrosion and heavy operational loads from forklifts, reach stackers and overhead cranes. AISC 341 detailing applies to the braced frames and any moment frames; where steel piles form part of the seismic load path, Section D4 sets their width-to-thickness limits, tension connection to the pile cap and protected zone. Galvanizing or duplex coatings are common, and anchor rods are frequently galvanized or stainless to resist the salt environment. A steel package for a port site has to bring all of those requirements together on one set of drawings.
The manufacturing and battery belt
The Southeast's newest construction wave is industrial: automotive plants around Charleston, Greer and West Point, electric vehicle and battery plants across Georgia, the Carolinas and Tennessee, and the suppliers that follow them. These plants combine large clear spans, heavy roof equipment, cranes and tight schedules. Where they sit in SDC C or D, braced frames with AISC 341 detailing are standard, and crane runways and mezzanines must work with the lateral system.
For a contractor, the important questions are capacity and schedule: can the steel supplier deliver several thousand tonnes in the sequence the plant is built, with seismic detailing and documentation that satisfy the special inspector?
Codes, permits and inspection
South Carolina adopts the IBC statewide, with local enforcement in Charleston, North Charleston, Mount Pleasant and Charleston County, all experienced with seismic review. Georgia adopts state minimum codes based on the IBC. Special inspection under IBC Chapter 17 is required for the SFRS steel in SDC D, and the building official may exempt an approved fabricator from in-plant special inspection under IBC Section 1704.2.5.
Proof for Southeast industrial programs
World Steel's track record matches the scale of the Southeast's industrial boom. Our plant fabricates 2,500 tonnes a month, and our largest single projects are 5,000 tonnes for the Sunpro Steel mill, with crane buildings and heavy built-up members, 2,500 tonnes for the CPV Food processing plant and 2,000 tonnes for the Long Son petrochemical complex. Repeat industrial clients such as Haid Group, for whom we framed both the Haid Vinh Long and the Thang Long Hai Duong plants, show the kind of relationship a battery or automotive supplier program needs: the second plant starts from the lessons of the first.
On the seismic side, welders and procedures are qualified to AWS D1.8, the seismic-designed FPI Barracks on Guam was designed and delivered in 60 days, and our quality system holds IAS AC472 accreditation since 2019 and ISO 3834-2 certification from Bureau Veritas. For coastal exposure, coatings from Jotun, PPG, Carboline, Hempel, Nippon and International Paint are applied by manufacturer-trained painters and checked by FROSIO Level III inspectors.
A checklist for Charleston and Southeast projects
- Confirm the Seismic Design Category, site class and Risk Category; Lowcountry sites are often SDC D.
- Check whether ordinary braced frames or ordinary moment frames are within the ASCE 7 limits, or whether special systems are needed.
- Design column bases and anchor rods for both hurricane uplift and seismic overturning.
- Coordinate coatings with slip-critical faying surfaces and protected zones.
- Plan phased deliveries through Charleston or Savannah to match the construction sequence.
How World Steel supports Southeast projects
World Steel designs and fabricates structural steel for US contractors in its own plant in Vietnam, the first and only IAS AC472 accredited fabricator in the country. For South Carolina, Georgia, Tennessee and Virginia projects we design to AISC 360 and AISC 341-22 with ASCE 7 wind and seismic loads, and prepare the calculation report and shop drawings at no extra cost, with SFRS members, demand critical welds, collectors and protected zones shown.
Materials are tested at ILAC-accredited laboratories, steel ships direct to Charleston or Savannah, and every piece can be tracked in PEB Studio. The Engineer of Record approves the design and the US contractor, our customer, carries out the site work. See South Carolina Charleston seismic design for local detail. The next article looks at the large middle ground of US seismic design: SDC B and C, and the choice between R = 3 and a detailed system.
Quick answers
How strong was the 1886 Charleston earthquake?
It is estimated at about magnitude 7, the largest historical earthquake in the southeastern United States. It destroyed or damaged most buildings in Charleston, killed around 60 people and was felt from Cuba to Canada.
Is Charleston in a high Seismic Design Category?
Yes. Much of the Charleston area and the South Carolina coastal plain fall in Seismic Design Category D for ordinary buildings, mainly because of the 1886 source and the soft coastal soils. The category must be checked for each site.
Do hurricanes or earthquakes govern Charleston steel?
Both, for different parts of the design. Hurricane wind usually governs roof framing, cladding and uplift, while the seismic force-resisting system must be detailed to AISC 341 where the building is in SDC D.
Which other Southeast areas have seismic hazard?
The East Tennessee seismic zone, parts of Georgia and the Carolinas near the 1886 source, and central Virginia, where the 2011 Mineral earthquake reached magnitude 5.8, all have moderate to significant hazard.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Seismic steel structuresSDC D to F framing we fabricate for US jobs
- Seismic regionsWhere seismic design governs in the US
- California seismic designThe everyday AISC 341 market
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors


