Ask a contractor to name the US seismic regions, and the West Coast and Alaska come first. The New Madrid seismic zone is often missing from the list, which is why projects there sometimes discover late that the steel needs AISC 341 detailing. Memphis, home to one of the largest distribution and air cargo hubs in the world, sits close to the zone. So do Jonesboro, Blytheville, Cape Girardeau, Paducah and Carbondale, and St. Louis lies within reach of its strong shaking. This article explains where the provisions govern in the Mid-South and how a steel building there is designed and supplied.
A seismic zone in the middle of the continent
In the winter of 1811–1812, three large earthquakes, each estimated around magnitude 7 to 7.5, struck near New Madrid in the Missouri Bootheel. They changed the course of the Mississippi for a time, created Reelfoot Lake in Tennessee and rang church bells as far away as the East Coast. Paleoseismic studies of sand blows across the region show earlier sequences of similar size around 1450 and 900 AD.
Two features make the hazard high today:
- Efficient wave travel. The old, cold crust of the central US carries seismic waves much farther than the young, fractured crust of California. A large New Madrid earthquake would be felt strongly over a far wider area than a California event of the same magnitude.
- The Mississippi embayment. Memphis and the surrounding lowlands sit on hundreds of meters of soft sediments. They amplify shaking and are prone to liquefaction, which was widespread in 1811–1812.
The nearby Wabash Valley seismic zone, along the Illinois–Indiana border, adds its own moderate hazard.
Where the provisions apply
ASCE 7's design maps place much of the region close to the zone in Seismic Design Category D. That includes most of the Memphis metropolitan area and northeast Arkansas, western Tennessee and Kentucky, the Missouri Bootheel and southern Illinois. Site class has a large effect: soft-soil sites in Shelby County or the Arkansas Delta often land in SDC D, while stiffer sites farther away may fall in SDC C. St. Louis and Little Rock sit in SDC C or D depending on the site and the Risk Category.
Section A1 of AISC 341 explains the consequence in its User Note. In SDC B and C, ASCE 7 Section 14.1.2.2.1 lets a steel building skip the provisions if it is designed with R = 3 as a system not specifically detailed for seismic resistance. In SDC D, that route is closed for most buildings, and the seismic force-resisting system (SFRS) must be one of the AISC 341 systems. A Memphis warehouse is therefore often an AISC 341 building, even if the owner and the contractor have never built one before.
Soft soils, liquefaction and foundations
The embayment's sediments shape the foundations as much as the frame. Many Memphis and Delta sites are Site Class D or E, and liquefiable sands are common. Deep foundations, ground improvement or both are frequent on large buildings.
Where steel H-piles form part of the seismic load path, Section D4 of AISC 341 applies. Piles in Site Class E or F must meet the moderately ductile width-to-thickness limits of Section D1.1; tension must be carried into the pile cap by mechanical means, with a connection designed for at least 10 percent of the pile compression capacity unless an exception applies; and the length equal to the pile depth below the cap is a protected zone. Chapter J includes inspection of H-piles as well.
Big buildings, big diaphragms
The Mid-South's signature building is the distribution center: hundreds of meters long, 12 to 15 m (40 to 50 ft) clear, with a steel roof on joists or girders and walls of tilt-up concrete or metal panels. In such buildings, the seismic design is mostly about the roof diaphragm and how its force gets into the walls and frames.
Section B5 of AISC 341 requires diaphragms, chords and collectors to be designed for the load combinations of the building code, with collectors and their connections designed for the overstrength seismic load. In a very long building, collector forces become large, and the collector connections at braced frames are often the most heavily loaded steel joints in the building.
The vertical system is usually:
- Ordinary concentrically braced frames (Section F1) or special concentrically braced frames (Section F2) in the steel walls, or
- Tilt-up concrete walls for the lateral system, with the steel roof acting as the diaphragm and the steel frame carrying gravity only. In that case AISC 341 still covers gravity column splices and bases where Section A1 applies, and the steel collectors must still be designed for overstrength.
Ordinary moment frames (Section E1) and intermediate moment frames (Section E2) are used for lighter single-storey buildings within the ASCE 7 limits. Where intermediate frames need prequalified connections, our AISC 358 series covers moment frame connections in the New Madrid zone.
Tornadoes, ice and the other loads
The Mid-South is also tornado country, and ASCE 7-22 added tornado loads for Risk Category III and IV buildings in the most exposed areas. Ice storms load roofs, canopies and exposed steel. Wind uplift and seismic overturning both pull on column bases and anchor rods. As in other multi-hazard regions, the engineer checks every member for each load case, but the detailing of the SFRS follows AISC 341 whenever the system is an AISC 341 system.
Expansions and existing buildings
Much of the Mid-South's construction is expansion: a second phase of a distribution center, a new bay on a manufacturing plant, a mezzanine in an existing warehouse. Many of the existing buildings were designed before the region's current seismic values, or under the R = 3 route when the site was mapped in a lower category.
The International Existing Building Code decides how much of the existing structure must be upgraded when an addition goes in. A structurally independent addition, separated by a seismic joint, is designed as a new building with its own AISC 341 system. An addition that leans on the existing building for lateral support brings the existing lateral system into the calculation, and may trigger evaluation or retrofit under ASCE 41 and AISC 342, the companion standard for existing steel buildings.
For the steel package, the practical choices are usually a seismic joint with its own braced frames, or new braced frames that help both buildings. Either way, the connection to existing steel, field-drilled or welded, needs early coordination, because the original mill certificates and weld records are rarely available and the Engineer of Record may need testing of the existing members before the new steel is detailed.
Codes and owners in the Mid-South
Tennessee, Missouri, Arkansas, Kentucky and Illinois enforce the IBC through state and local adoptions. Shelby County and Memphis, St. Louis city and county, and the larger Arkansas and Kentucky jurisdictions have structural plan review and special inspection programs. Many large logistics owners and developers also have national design standards that set the seismic system, deck and joist suppliers and inspection practices, so the owner's standard is part of the code stack in practice.
Proof for large logistics and industrial programs
Memphis and St. Louis programs are measured in tens of thousands of square meters per building and thousands of tonnes per campus. World Steel's plant fabricates 2,500 tonnes a month, and our largest single projects show the range: 5,000 tonnes for the Sunpro Steel mill, 2,500 tonnes for the CPV Food processing plant, 2,000 tonnes for the M&D warehouse in Thailand and 1,000 tonnes in phase 1 of the New Era cold storage. The M&D and New Era projects are the closest match to a Mid-South distribution or cold storage building: long spans, high clear heights, large roofs and steel delivered in erection sequence.
For seismic detailing, our welders and procedures are qualified to AWS D1.8, and the seismic-designed FPI Barracks on Guam shows a complete seismic package delivered in 60 days. Collectors and brace connections are cut and drilled on laser machines that handle plate up to 100 mm thick, which keeps connection geometry consistent across hundreds of frames.
A checklist for New Madrid projects
- Confirm the Seismic Design Category for the exact site, including the site class and Risk Category.
- If the site is in SDC D, plan for an AISC 341 system and confirm which one the Engineer of Record uses.
- Identify collectors, chords and their connections, and the overstrength load they carry.
- Check whether steel piles are in the seismic load path and how Section D4 applies.
- Coordinate tornado and wind uplift with seismic overturning at column bases.
How World Steel supports Mid-South projects
World Steel designs and fabricates structural steel for US contractors in its own plant in Vietnam, the first and only IAS AC472 accredited fabricator in the country, audited twice a year. For projects near the New Madrid zone we design to AISC 360 and AISC 341-22, prepare the calculation report and shop drawings at no extra cost, and show SFRS members, demand critical welds, collectors and protected zones on the drawings.
Materials are tested at ILAC-accredited laboratories, steel ships to Gulf or East Coast ports and moves inland by rail, barge or truck, and every piece can be followed in PEB Studio. The Engineer of Record approves the design and the US contractor, our customer, carries out the site work. See Tennessee New Madrid seismic design and Missouri New Madrid seismic design for local detail. The next article turns to the other East Coast surprise: Charleston and the Southeast.
Quick answers
Which Mid-South cities sit closest to the New Madrid seismic zone?
The zone runs roughly from northeast Arkansas through the Missouri Bootheel and western Tennessee into western Kentucky and southern Illinois, centered near New Madrid, Missouri. Memphis, Jonesboro, Cape Girardeau, Paducah and Carbondale are close to it, and St. Louis feels its hazard at a distance.
Why is the hazard high if earthquakes there are rare?
Three earthquakes around magnitude 7 struck in 1811 and 1812, and geologic evidence shows similar sequences every few hundred years. Seismic waves travel far in the hard rock of the central US, and the deep, soft river sediments of the Mississippi embayment amplify shaking.
Does every Memphis warehouse need AISC 341?
Not always. Many Memphis-area sites fall in Seismic Design Category D, where AISC 341 generally applies, but the category depends on the site class and Risk Category. Some sites farther away fall in SDC C, where the R = 3 route without AISC 341 is permitted.
What else matters for Mid-South steel buildings?
Soft soils and liquefaction, which drive deep foundations, and tornado and ice storm risk, which affect roof and wall design. Logistics buildings are very large, so diaphragms and collectors are central to the seismic design.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Seismic steel structuresSDC D to F framing we fabricate for US jobs
- Seismic regionsWhere seismic design governs in the US
- California seismic designThe everyday AISC 341 market
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors