Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel members with drilled end plates ready for bolted connections in the World Steel plant

AISC 341 seismic steel

Seismic bolted joints and welded joints: AISC 341-22 Section D2

Connections in a seismic system must survive forces larger than the design force, applied in both directions, many times over. AISC 341-22 Section D2 sets the rules for bolted joints, welded joints and continuity plates, and Chapter I carries them into the shop and the field.

· updated November 30, 2026 · 7 min read · World Steel USA engineering team

Most steel connections are designed for a known force acting in one direction. Connections in a seismic system face something harsher: forces larger than the code design force, because they must develop the strength of the yielding members next to them, applied back and forth many times in a few seconds. A joint that slips, a bolt that bears on a loose hole or a weld with a hidden notch can turn a ductile frame into a brittle one. AISC 341-22 Section D2, Connections, sets the general rules for seismic bolted joints, welded joints and stiffeners, and Chapter I applies them in the shop and in the field. This article explains them.

Section D2.1: the general rule

Section D2.1 sets the principle. Connections, joints and fasteners that are part of the seismic force-resisting system (SFRS) must be designed for the required strength set in the system chapters, which is usually the capacity-limited force from the yielding members, or the overstrength load where the standard permits. They must also be detailed so that the intended yielding mechanism forms, rather than a failure in the connection itself.

In plain terms: the connection must be stronger than the member it serves, measured at that member's expected strength.

Section D2.2: bolted joints

AISC 341 places several requirements on bolted joints in the SFRS that go beyond ordinary practice.

Pretensioned high-strength bolts

All bolts in the SFRS must be pretensioned high-strength bolts, installed to the pretension required for slip-critical joints under the RCSC Specification. In US practice, that means ASTM F3125 bolts, such as Grade A325 or A490 or their twist-off equivalents, installed by turn-of-nut, calibrated wrench, twist-off tension control or direct tension indicators.

Faying surfaces

The faying surfaces, the contact surfaces between the connected plies, must be prepared as required for slip-critical joints, with at least a Class A surface. Uncoated clean mill scale, blast-cleaned steel and qualified coatings can meet that class. Many seismic joints are designed as bearing joints for strength, yet their surfaces are prepared as if slip-critical, because a joint that does not slip under moderate shaking avoids damage and keeps the frame's stiffness.

Bearing strength

Where bolted joints are designed for bearing, the nominal bearing strength at bolt holes is limited to the value that applies when deformation at the bolt hole is a design consideration, so the holes do not elongate significantly under cycling.

Hole types

Bolt holes in the SFRS are generally limited to standard holes or short-slotted holes with the slot perpendicular to the line of force. Oversized holes are permitted in some cases, for example in one ply of a diagonal brace connection designed as slip-critical. Long slots and oversized holes in other locations need specific justification.

No sharing between bolts and welds

Bolts and welds must not be designed to share force in a joint or the same force component in a connection. A bolted web and a welded flange may work together in a moment connection, because they carry different components, but bolts and welds in the same faying surface may not be added together. The reason is deformation: a weld reaches its strength with very little movement, a bearing bolt only after the hole deforms. Under cyclic loading the weld would carry nearly everything and fail first.

Section D2.3: welded joints

Welds in the SFRS follow AWS D1.1 and the seismic supplement AWS D1.8, as Section A3.4 and Section D2.3 require. Three ideas matter most.

Notch-tough filler metal

All welds in the SFRS use filler metal with classified toughness of at least 27 J at −18 °C (20 ft·lbf at 0 °F). That is a step above many general-purpose electrodes and must be specified on the welding procedures.

Demand-critical welds

The system chapters designate certain welds as demand-critical: welds that carry yield-level strains or whose failure would break the load path. Typical examples are:

  • Complete-joint-penetration (CJP) groove welds of beam flanges and webs to columns in special and intermediate moment frames.
  • CJP groove welds in column splices of moment frames and other systems where the standard requires.
  • Welds at column-to-base plate connections in moment frames.
  • Certain welds in eccentrically braced frame links and plate shear wall boundaries.

Demand-critical welds use filler metal that also passes the heat input envelope testing of AWS D1.8, with weld metal toughness of at least 54 J at 21 °C (40 ft·lbf at 70 °F), and they get the inspection and ultrasonic testing set in Chapter J.

Details that remove notches

Many seismic weld rules exist to remove notches: removing steel backing from beam bottom flange welds and adding a reinforcing fillet, removing weld tabs and grinding the weld ends, and shaping weld access holes to the profile AWS D1.8 or the prequalified connection requires. These are covered in depth in our AWS D1.8 series.

Section D2.4: continuity plates and stiffeners

Where a beam frames into a column flange, the column may need continuity plates, horizontal stiffeners aligned with the beam flanges, to carry the flange forces across the column. Section D2.4 addresses how those plates and other stiffeners meet the column.

The key detail is the corner clip. Rolled shapes have a fillet between web and flange, the k-area, where steel can be harder and less tough after rotary straightening at the mill. Continuity plates and stiffeners are clipped at the inside corners so their welds stay out of that region: the clip along the web extends beyond the k detailing dimension, and the clip along the flange is kept small so the flange weld still has enough length. The exact dimensions are in the standard.

For special moment frames, AISC 341-22 also introduced width-to-thickness limits for continuity plates and relaxed some of the welding requirements for them, permitting less demanding welds in cases where the plate's force can be developed without a CJP weld to the column flange. That change reduces shop hours and testing at many SMF joints.

Chapter I: carrying the rules into the shop and the field

Chapter I, Fabrication and Erection, puts these rules into practice:

  • Section I2.2, bolted joints: faying surfaces prepared and protected until assembly, holes made to the specified type and size, and bolts installed and pretensioned to the RCSC Specification. Faying surfaces are masked during painting where coatings are not qualified for the slip class.
  • Section I2.3, welded joints: welding to approved procedures, filler metal controlled for toughness and exposure, tack welds and backing handled as AWS D1.8 requires, and weld tabs removed where specified.
  • Section I2.4, continuity plates and stiffeners: corner clips made to the required dimensions and welds placed accordingly.

Both the fabricator and the erector carry quality control for their work under Chapter J, and the quality assurance agency verifies it.

Bolted or welded: choosing the joint type

Seismic frames can be built with welded, bolted or mixed connections, and each choice has consequences for the shop and the site.

Approach Strengths Points to plan for
Shop-welded, field-bolted Most welding done in controlled shop conditions; fast field work Larger shipping pieces, such as column trees with beam stubs; bolted splices in the beams
Field-welded moment connections Simple shop pieces, compact shipping Field CJP welding, preheat, ultrasonic testing on site, weather protection
Bolted end-plate or flange-plate connections No field welding of the SFRS; quick inspection Tight fabrication tolerances; heavy plates; pretensioning on site

For steel fabricated overseas and shipped by sea, the shop-welded, field-bolted approach and the bolted prequalified connections of AISC 358 are often the most efficient: demand-critical welding happens in the plant under the fabricator's quality control, and the US contractor's crews complete the frame with pretensioned bolts. The Engineer of Record makes the final choice, often after comparing the options with the fabricator and the US contractor.

Inspection of bolted and welded joints

Chapter J lists the inspection tasks for both joint types. For bolting, inspectors observe the faying surface condition, the hole types and the pretensioning method, and verify that bolts, nuts and washers match the specification. For welding, they verify the welding procedures, welder qualifications and filler metal, observe the work and visually inspect every weld, and nondestructive testing is applied to complete-joint-penetration welds as the chapter and the specification require.

Common problems in seismic connections

  • Painted faying surfaces with a coating not qualified for the required slip class.
  • Oversized or slotted holes where the standard does not allow them, often introduced to ease fit-up.
  • Bolts and welds combined in the same faying surface as a field fix.
  • Unclipped continuity plates or clips too small, putting welds in the k-area.
  • Demand-critical welds not identified on the drawings, so the wrong filler metal or procedure is used.

How World Steel makes seismic connections

World Steel designs and fabricates seismic connections for US projects in its IAS AC472-accredited plant in Vietnam. Our engineers design each connection in the SFRS for the capacity-limited force of the yielding member, with no load sharing between bolts and welds, and our detailers show hole types, faying surface classes, demand-critical welds and continuity plate clips on the shop drawings. See our structural connections hub.

Holes are drilled or laser cut to the specified type on CNC lines, faying surfaces are blast-cleaned and masked during coating, and connection plates and stiffeners are fabricated with the members. Shop welding procedures and welders are qualified to AWS D1.8, with procedure records available in our WPS and PQR library, and demand-critical welds are inspected and tested as Chapter J and the project specification require. We supply the high-strength structural bolts with each shipment; the US contractor, our customer, installs and pretensions them on site to the RCSC Specification.

The next article completes Chapter D with two connections that carry some of the highest forces in any seismic frame: column splices and column bases.

Quick answers

Do bolts in a seismic system have to be pretensioned?

Yes. AISC 341 requires bolted joints in the seismic force-resisting system to use pretensioned high-strength bolts, with faying surfaces prepared as for slip-critical joints, even when the joint is designed for bearing.

Can bolts and welds share the load in a seismic connection?

Not in the same force component. AISC 341 does not allow bolts and welds to be designed to share a force in a joint or the same force component in a connection, because they reach their strength at very different deformations.

How does AISC 341 decide which welds are demand critical?

A weld that AISC 341 designates in the system chapters because its failure would compromise the seismic system, such as the complete-joint-penetration welds of beam flanges to columns in special moment frames. It must use notch-tough filler metal and follow AWS D1.8.

Why are continuity plate corners clipped?

Clipping the corners keeps the plate welds away from the column k-area, where the steel can be less tough after mill straightening, and lets the weld at the web-to-flange fillet be made properly.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 341-22 seismic design series

Twenty in-depth articles on the 2022 Seismic Provisions for Structural Steel Buildings: what each chapter asks of the design, the drawings, the shop and the inspector, and how World Steel engineers and fabricates seismic steel to it for US projects.

Chapter D
Members and connections

Ductile sections, bracing, protected zones, joints, splices and bases.

Chapter E
Moment frames

OMF, IMF, STMF, SMF and the cantilever column systems.

Chapter F
Braced frames and walls

Concentric and eccentric bracing, buckling-restrained braces, plate walls.

Chapters G–H
Composite systems

Steel and concrete working together, including the new CC-PSW/CF.

Chapters I–K
Fabrication, QA and testing

Shop and site rules, quality control and assurance, cyclic tests.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.