Alaska has the highest earthquake hazard in the United States. The 1964 Great Alaska Earthquake, magnitude 9.2, is the second largest ever recorded, and the 2018 Anchorage earthquake, magnitude 7.1, was a reminder that strong shaking is not history. Alaska also has some of the lowest steel service temperatures on the continent. An Alaska seismic steel frame has to be ductile enough to cycle through a long earthquake and tough enough to do it at minus 30 °C. This article shows how the AISC 341 provisions and the cold-climate rules around them fit together.
Where the hazard comes from
The Pacific plate dives under Alaska along the Aleutian megathrust, from the Gulf of Alaska to the western Aleutians. That interface produced the 1964 earthquake and several other great events in the last century. Inside the subducting slab, intermediate-depth earthquakes like 2018 Anchorage shake the whole Cook Inlet basin. On land, crustal faults such as the Denali Fault, which ruptured in 2002 at magnitude 7.9, and the Castle Mountain Fault near the Mat-Su add more sources.
Mapped through ASCE 7, the result is that most of the populated south, including Anchorage, Eagle River, Wasilla, Palmer, Kenai, Soldotna, Seward, Valdez, Kodiak and the Aleutian communities, falls in Seismic Design Category D, with SDC E and F at many sites near the coast and for essential facilities. Fairbanks sits in a lower but still significant zone. Every site has to be checked; soil conditions can move a building up a category.
Soft ground, liquefaction and H-piles
Anchorage's 1964 damage was dominated by ground failure: landslides in Turnagain Heights, downtown and Government Hill, and liquefaction across the Cook Inlet lowlands. Much of the region sits on glacial outwash, silts and the Bootlegger Cove clay. Many sites are Site Class D or E, and some need a site-specific study.
That drives the foundation. Steel H-piles are common in Alaska for their capacity to be driven through dense layers and frozen ground. Section D4 of AISC 341 sets their seismic rules:
- H-piles in Site Class E or F must meet the moderately ductile width-to-thickness limits of Section D1.1, so flanges do not buckle locally under large curvature at the pile cap.
- Where battered and vertical piles are used together, the vertical piles alone must carry dead and live loads.
- Tension must be transferred to the pile cap by mechanical means, with a connection designed for at least 10 percent of the pile compression capacity unless the exceptions apply.
- A length equal to the pile depth directly below the cap is a protected zone, free of attachments and welds under Sections D1.3 and I2.1.
On permafrost sites, frost jacking, adfreeze and thermal design add rules that sit outside AISC 341, but the seismic detailing of the steel piles stays the same.
Cold and toughness: two requirements that stack
AISC 341 and AWS D1.8 set toughness requirements that assume a building near room temperature in service:
- Heavy sections used in the SFRS, rolled shapes with flanges 38 mm (1-1/2 in.) and thicker and plates 50 mm (2 in.) and thicker in key locations, need Charpy V-notch toughness of at least 27 J at 21 °C (20 ft·lbf at 70 °F), under Section A3.4.
- Demand critical weld filler metal must give at least 27 J at −18 °C (20 ft·lbf at 0 °F) in the classification test and 54 J at 21 °C (40 ft·lbf at 70 °F) in heat input envelope tests, unless the Engineer of Record sets other values.
In Alaska, those defaults are often not enough for steel that will be cold in service. Unheated warehouses, equipment buildings, canopies, port structures, mine and oil field facilities, and any exposed frame may see the lowest anticipated service temperature (LAST) well below −18 °C. AWS D1.8 allows the Engineer of Record to lower the filler metal test temperature to match, and the project specification usually lowers the base metal Charpy test temperature too.
That has practical consequences:
- Plate and shape orders must specify supplemental Charpy testing at the project temperature. Vietnam, Japanese and Korean plate mills can supply EN 10204 Type 3.1 certificates with CVN values at specified low temperatures.
- Filler metals must be qualified for the lower temperature, which narrows the choice of FCAW and SAW consumables.
- Heat input must stay within the tested envelope, because heat input above it lowers toughness.
The rule of thumb for a contractor: if the building will not be heated, ask the Engineer of Record for the LAST and make sure it is on the drawings before steel is ordered.
Systems for Alaskan buildings
Alaskan projects use the same AISC 341 systems as California and Washington, adjusted for snow, cold and remoteness:
- Special concentrically braced frames (Section F2) and ordinary braced frames where ASCE 7 permits them, for warehouses, hangars, schools and industrial buildings.
- Special moment frames (Section E3) for hospitals, offices and buildings that need open bays, with AISC 358 connections. Bolted connections such as end plates reduce field welding in a short summer season.
- Buckling-restrained braced frames (Section F4) for essential facilities and mid-rise buildings.
- Pre-engineered metal buildings with tapered frames for warehouses, hangars, fish processing plants and remote camps, designed as ordinary moment frames under Section E1 within ASCE 7 limits, or braced in the longitudinal direction.
Heavy snow loads, often 2 to 5 kPa (40 to 100 psf) of ground snow and more in coastal mountains, add to the seismic mass. ASCE 7 includes a share of the snow load in the effective seismic weight where the flat roof snow load is above 1.44 kPa (30 psf), so roof steel in Alaska is heavier for both reasons.
Field work in a short season
Alaska's construction season is short, especially outside Anchorage. That puts a premium on shop work:
- Shop-welded, field-bolted details move demand critical welding into the plant, where preheat, interpass temperature and heat input are easier to control than on a cold site.
- Pretensioned bolts in the SFRS need faying surfaces prepared as the drawings specify, Class A or higher where slip-critical joints are required.
- Protected zones must be marked so the US contractor's site crew keeps attachments out of them during enclosure work.
- Erection sequence and packing should match the barge or ship schedule, so steel arrives in the order it is needed.
Field welding in the cold is possible under AWS D1.1 and D1.8 with enclosures and preheat, but every field demand critical weld adds inspection and risk. A design that keeps it in the shop helps the schedule.
Shipping steel to Alaska
Overseas steel usually reaches Alaska by ocean freight to a West Coast port, then by the Alaska trade or barge to the Port of Alaska in Anchorage, or direct to ports such as Kodiak, Dutch Harbor, Seward and Valdez. Remote sites add barge or air legs. Planning packing and delivery around the season, ice and the jobsite's storage capacity matters as much as fabrication time.
Essential facilities and Risk Category IV
Alaska depends on a small number of hospitals, airports, fire stations, utilities and emergency operations centers spread over a very large area. When one of them is out of service after an earthquake, there is often no nearby alternative. ASCE 7 assigns these buildings to Risk Category IV, with an importance factor of 1.5 on seismic forces and tighter drift limits. On many coastal sites that places them in SDC F, where the system choices narrow further.
For the steel, that means heavier members, stiffer frames and fewer shortcuts. Ordinary systems that a warehouse might use under the ASCE 7 exceptions are generally not available. Special moment frames, special concentrically braced frames, buckling-restrained braced frames and eccentrically braced frames are the realistic options, each within the height limits for SDC F. Nonstructural components, including equipment supports, piping and stairs, are anchored and braced to stay functional, which adds secondary steel that also has to be detailed for the expected drift.
Essential facilities also tend to carry more inspection. The Engineer of Record may increase nondestructive testing above the minimum rates of Chapter J, ask for supplemental base metal testing near large welds, or require third-party inspection at the plant in addition to the fabricator's own program. A fabricator that plans those hold points from the start keeps them off the critical path.
A short checklist for Alaska seismic steel
- Confirm the Seismic Design Category and Risk Category for the exact site, and whether the site class needs a site-specific study.
- Ask for the lowest anticipated service temperature of every steel element that will be unheated or exposed, and the Charpy test temperatures that follow from it.
- Check whether H-piles are part of the seismic load path and which Section D4 rules apply.
- Prefer shop welding and field bolting for SFRS connections where the design allows it.
- Plan packing, shipping and storage around the season and the barge schedule, not only the fabrication time.
Why remote, cold projects suit our way of working
Alaska rewards a supplier that thinks like a remote-site logistics team. World Steel's references in remote places show that habit: about 200 tonnes of hot-dip galvanized steel for the Kosrae Hospital on a small Pacific island, the seismic-designed FPI Barracks on Guam delivered in 60 days, and warehouses, workshops and 18 footbridges shipped by sea to Guyana, where a missing part means weeks of delay. Every one of those packages was packed against a checked list, in erection order, with bolts and accessories boxed by area.
For cold climates the plant passes low-temperature Charpy requirements to the mill at the order stage, so the certificates arrive with the plate; it does not try to test cold toughness into steel after the fact. Built-up members are welded in the shop under controlled preheat, and frames are trial-fitted where the connection geometry is complex, so the short Alaskan season is spent assembling, not fixing.
How World Steel supports Alaska projects
World Steel designs and fabricates structural steel for US contractors in its plant in Vietnam, the first and only IAS AC472 accredited fabricator in the country. For Alaska we design to AISC 360 and AISC 341-22, include snow and cold in the design basis, and prepare the calculation report and shop drawings at no extra cost, with SFRS members, demand critical welds and protected zones shown.
Welders and procedures are qualified to AWS D1.8, low-temperature Charpy requirements are passed to the plate mill and the consumable supplier, and materials are tested at ILAC-accredited laboratories. Shop-welded, field-bolted details reduce field welding. With 2,500 t of capacity a month and tracking in PEB Studio, we pack and ship for the barge schedule. The Engineer of Record approves the design and the US contractor, our customer, carries out the site work.
For state detail, see Alaska earthquake design and Alaska steel shipping. The next article crosses the Pacific to Hawaii and Guam.
Quick answers
Is all of Alaska in a high Seismic Design Category?
Most of the populated south, including Anchorage, the Mat-Su, the Kenai Peninsula, Kodiak and the Aleutians, is in SDC D or higher. Parts of the interior and the North Slope have lower hazard, so the category must be checked for each site.
Why does cold weather matter for AISC 341 steel?
Steel and weld metal lose toughness as temperature drops. For exposed or unheated steel, the project may set Charpy test temperatures below the AISC 341 and AWS D1.8 defaults, based on the lowest anticipated service temperature.
What did the 2018 Anchorage earthquake show?
The magnitude 7.1 intraslab event caused ground failures and nonstructural damage but few structural collapses, which engineers credit to modern codes. It also reminded designers that soft soils and liquefaction drive foundation choices.
How does steel reach Alaska from overseas?
Usually by ocean freight to a West Coast port and then by barge or the Alaska trade to the Port of Alaska in Anchorage, or direct to other Alaskan ports, timed around the construction season.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Seismic steel structuresSDC D to F framing we fabricate for US jobs
- Seismic regionsWhere seismic design governs in the US
- California seismic designThe everyday AISC 341 market
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors